Laserfiche WebLink
,-,SANTA <br />NA <br />ILI\\I\C <br />&ltDNE <br />.tcIcI <br />Planning & Building Agency <br />Building Safety Oivision <br />20 Civic Center Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA 92702 <br />(7 t4) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHEGKL!ST <br />sol 01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENGES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size lf answerino NO to anv of the oues tions, olan check shall be reouired. <br />W es{e-c u.ve So^k .z{*^Project Address:io o C ) zo3 <br />Contractor Company Name: <br />Contractor License Number: <br />S-ta r S-^ S <br />YES NO <br />Etu <br />Eltr <br />loo ?3 oA <br />Are the following applicable to the proposed project? <br />Wlll the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Wll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Wll the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parailel to the plane of the roof? <br />Wll the PV system weigh maximum 4 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Vvill the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Vvill the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and ls this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />4 <br />2 <br />3 <br />6 <br />7 <br />8 <br />9 <br />mtr <br />tsD <br />tstr <br />trtr <br />trtr <br />trtr <br />u <br />'10 EU <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print Name Mollh.,,S.L."4ur<f Signature 2t 4' <br />Y <br />Rev 11/19/2015 <br />1 <br />Phone Number Orr" q/r t f t 7 <br />Email Address: Pe(M,l @ S+a,,'Su^ ( oiar. (o^^