Laserfiche WebLink
IUIIG I <br />Coaporrtc <br />2S2 E Lr Palrr. Avc. Ste. A <br />Anaheirn, CA92E06 <br />Tel: 71,1.632.2999 <br />Fax:711.eB22€71 <br />Dilp.tch: E@.491.2990 <br />San OicgornpGri.l County <br />6295 Feris Squaro 516. C <br />San El€go. CA 92'121 <br />Tol: 858.537.39So <br />F.r:8S.537.3990 <br />DisFtchi 8E6.&{.t.so@ <br />lnland Emrrirc <br />1 ,a467 Moridbn Ptwy. , Bldg 2A <br />Rivorsido, CA92518 <br />Tcl: 951.653.,19$ <br />F6x: 951 .553.4866 <br />oispotch: 80O..tS1.2S9O <br />l.|db <br />4491 7 Gotr C€nLr Pkwy-, Ste. I <br />lndb, CA 92201 <br />Id:760342.16n <br />Faxtl60 312j525 <br />ObFbh: 8O0.aS1.2990 <br />Separde reFrts lrr€ll E FEpa@d lrr ea* tlpe c, sFoal rlsoedEri on a daity b63E Edr rEpori shall ba compbed ar'd s{ned by the specral irEpedor coarduatno the <br />MTGL PRoJECTT: 5403A19 <br />eernit r 1019'l 322-17509 <br />ReponJePagelofl <br />Ploject Architect <br />Strudural Engin€€r <br />OSA Regional Ofico <br />Scrrool Oidnd <br />DAILY INSPECTION <br />REPORT <br />DSArcIY Fib ' - <br />OSAToSHPO Apd. I <br />osA/LEA * _ <br />THE WORK WAS WAS NOT THE WORK INSPECTEO MET DID NOT MEET <br />ln€pect€d rn acaDrdance rylth th6 r€qulrgments ofthe DSA/osPHo/ <br />PROJECT approvBd documents. <br />Ths rsquiremonE oftho PROJECT doqrmefits <br />Samples taken: <br />V\bath€r <br />MATERIAL SAMPLING WAS E WAS NOT E] II/A EI <br />Perfomed ln ac@rdance with OSI'/OSPHD/PROJECT approved docurnents. <br />Clear temp: 76 f <br />SE of Special lnspedor <br />Maged SaadContracior <br />Bualdmg Oepertno <br />Owner <br />certification #: 1CC345747 <br />Verified <br />Print Name <br />- <br />PRoJEoT NAMEj Aldi Mor Store # 34 oare:0912612017 <br />ARCHITEcT: APD TIME ARRIVED 9:OO AM TIME DEPARTEo: 3:00 PM <br />ENGINEER: B&B Associates TRAVEL TIME LUNCH TIME:. <br />CONTRACTOR: ED GRUSH SUB CONTRACTOR <br />INSPECTION ADDRESS ADDRESS oF PRoJECT: 2830 S. Bristol St, Santa Ana, Ca <br />TYPE OF INSPECTION <br />E ENGINEEREo FILL <br />E FouNoATroN <br />E BACK F|LL <br />U <br />D <br />E SHoTcRETE <br />E coNcRETE <br />BATCH PLANT <br />PT CONCRETE <br />EI MASONRY <br />E HIGH STRENGTH BoLTING <br />O vvElorNG <br />EI SHOP WELD <br />utr <br />D <br />E} FIREPROOFING <br />ANCHOR,/DoI'VEL <br />NOE FIELO <br />NOE SHOP <br />D CEILING \^/tRE <br />troo <br />OSA/OSHPD PROJECT <br />APPROVEO OOCUMENTS <br />AVAILABLE APPROVEO <br />PLANSYENE <br />SOIL REPORT Y f] N trI SPECS:YENE <br />APPROVEO SHOP DRAWNG Y D N E <br />MATERIAIS USED BY CONTRACTOR (NCLUDE RESEARCH REPORT NO. OR MATERTAL TEST REPORTS): Noni.lt bighi Con.rctc, Hil3radc Mb( <br />EOEUIPitENT USED SY COI{TRACTOR: <br />v\oRK AREA First end Floor <br />lnspected the placement ofgrout 3,000 PSl, in the following locations: <br />Shopping cart wall from level +d-0" To +4'-0" level on grid line G between lines 5.8 & 5.4 "top of wall". <br />Grout was mechanically vibrated. <br />All above work is still in progress as per approved plans and code. <br />REWORK AS PERCENI OF ALL WORK TODAY: 0%PERCENT PROJECT COMPLETEI