Laserfiche WebLink
]IIIG t <br />Corporate <br />2992 E L. PalnE A\ro. Sts. A <br />AnatEim. CA 92806 <br />T.l: 7'14.632.29S <br />Fa\i 71 1-6n.2.2971 <br />DEpatcir: 8@.491.299O <br />San OiGgonnpe.ial County <br />6295 F.rris Squaro St€. C <br />San Di.go, CA 9212t <br />T6l: 854.537.39S9 <br />Far: 858.537.3990 <br />oispsrch: 88E.E{4.5060 <br />lnland Emplrc <br />1445-7 Moririan Ptoll.y., BldO 2A <br />RiveBiro, CA 92516 <br />Tel: 951.653.,4999 <br />Far:961.63.4606 <br />Dispetch: Em.49l.29SO <br />lrdio <br />4491 7 Golt Cenbr Pkvy., Sto. 1 <br />lndb, CA 92201 <br />f el:7@.34,2.$n <br />Fax:760.342.rl5:l5 <br />Dbpadr: 600.491.2SO <br />MrGl PRo..,Ecrt: 5403A1 9 <br />Pemft, 10191322-17509 <br />Repoi, ? Pag€ 1 of I <br />DAILYINSpECTION DsArcrwFiror_ <br />REPORT osA/osHpo Appr., <br />DSA/LEA <br />' <br />- <br />uE FrtEs l6Ed Elor wlrcn 14 datE cl the rsFctrc't Fllpots or nonarnptari co.dnirE must be dtsrtr-ted mme(frtyot speoar r6pecron on a dairy bssE Ea<rr ,Epdd 3hJ e ;;r,O&iiji,a 6E i,iiiJiE]ifri:aor -,"*,,g r. <br />Sp€c]al lnspectoo REporE mud be <br />Separate repo.lB shal be prepared <br />rHE WORK WAS WAS NOT TTIE WORX INSPECTEO MET OID NOT MEETlnspedod in accordance with th€ requirements of the OSA,/OSpHD/r.KUJtc I approved doqJments.The requirements of the PROJECT dooJrnenb <br />Samples taken: <br />Clear remp: 72 fMATERIAL SAMPLING wAS E wAs NoT E I,I/A Et V\hA0lEC <br />Performed in accordance lvith DSA,iOSpHD/pROJECT approved documentB. <br />Project Architecl <br />Strudural Emin€€r <br />DSA ReCional Ofrce <br />School Distrid <br />ConEaclor <br />Buildiog D€parbnern <br />otrnaa <br />of Spcial lnspedor <br />Maged Saad <br />Prlnt Name <br />PROJECT NAME: AIdi Mor Store f 34 <br />ARCHITECT APD TIME ARRIVED: 7:00 AM TIME DEPARTED: 3:00 PM <br />ENGINEER: B&B Associates TRAVEL TIME LIJNCH TIME: - <br />coNTRAcroR: ED GRUSH SUB CONTRACTOR <br />INSPECTI ON ADORESS AODRESS OF pRoJECr: 2830 S. Bristot St, Santa Ana, Ca <br />OF INS <br />BACK FILL <br />E] ENGINEERED FILLE Fou NoATtoN <br />o <br />D <br />BATCH PLANT <br />PT C'NCRETE <br />SHOTCRETE <br />CONCRETE <br />RY <br />E HlGH STRENGTH EoLTINGfl v'lelorr'rc <br />E SHOPvvELD <br />FI <br />a ANCH OR/DOI/VEL <br />NDE FIELD <br />NOE SHOP <br />CEILING WlRE <br />tr <br />DSA/OSH PROJECT <br />APPROVEO DOCU MENTS <br />VAJLABLE APFROVED <br />PLANS Y N <br />SOIL REPORT N <br />N <br />SPECS: Y N <br />APPROVED SHOP DRAWNG Y <br />EQEUIPi'ENT USED BY CONTRACTOR: <br />! DRKAREA First and foundation Floor <br />MATERIAL ST RE NoryEl \ leight Concrete , Hi-ri6de Mix <br />MATERIALS USED BYCONi (INCLUDE RESEARC H REPORT NO <br />On grid line 7.4 between line A and A.8 from level 11,*4,,To +1G0,, level. <br />On grid line A.8 between line 7 and 7. from level 11L4,, To +16{,, level <br />Shopping cart wallfrom level 0'-0,,To +40, level <br />lnspected masonry unit for conformance to specification and Code. <br />lnspected masonry mortar for proper mixing and handling. <br />lnspected reinforcing steer for size, grade, type, rab sprice, secured rocations and crearance, <br />All above work is still in progress as per approved plans and code. <br />-lnspected the laying up of 8,, <br />On grid line A between line 7 <br />CMU wall in the following locations; <br />and 7.4 from level 11'-4,, To +160, level. <br />R EWO KR PAS RE ENc T o ALL KWOR oT DA 0o/o CENTPER P R cOJE T co PLt\,t ET E <br />cc <br />Certifcaton t: I c 4457 4 <br />oar", 09/r5/2017 <br />-