]IIIG t
<br />Corporate
<br />2992 E L. PalnE A\ro. Sts. A
<br />AnatEim. CA 92806
<br />T.l: 7'14.632.29S
<br />Fa\i 71 1-6n.2.2971
<br />DEpatcir: 8@.491.299O
<br />San OiGgonnpe.ial County
<br />6295 F.rris Squaro St€. C
<br />San Di.go, CA 9212t
<br />T6l: 854.537.39S9
<br />Far: 858.537.3990
<br />oispsrch: 88E.E{4.5060
<br />lnland Emplrc
<br />1445-7 Moririan Ptoll.y., BldO 2A
<br />RiveBiro, CA 92516
<br />Tel: 951.653.,4999
<br />Far:961.63.4606
<br />Dispetch: Em.49l.29SO
<br />lrdio
<br />4491 7 Golt Cenbr Pkvy., Sto. 1
<br />lndb, CA 92201
<br />f el:7@.34,2.$n
<br />Fax:760.342.rl5:l5
<br />Dbpadr: 600.491.2SO
<br />MrGl PRo..,Ecrt: 5403A1 9
<br />Pemft, 10191322-17509
<br />Repoi, ? Pag€ 1 of I
<br />DAILYINSpECTION DsArcrwFiror_
<br />REPORT osA/osHpo Appr.,
<br />DSA/LEA
<br />'
<br />-
<br />uE FrtEs l6Ed Elor wlrcn 14 datE cl the rsFctrc't Fllpots or nonarnptari co.dnirE must be dtsrtr-ted mme(frtyot speoar r6pecron on a dairy bssE Ea<rr ,Epdd 3hJ e ;;r,O&iiji,a 6E i,iiiJiE]ifri:aor -,"*,,g r.
<br />Sp€c]al lnspectoo REporE mud be
<br />Separate repo.lB shal be prepared
<br />rHE WORK WAS WAS NOT TTIE WORX INSPECTEO MET OID NOT MEETlnspedod in accordance with th€ requirements of the OSA,/OSpHD/r.KUJtc I approved doqJments.The requirements of the PROJECT dooJrnenb
<br />Samples taken:
<br />Clear remp: 72 fMATERIAL SAMPLING wAS E wAs NoT E I,I/A Et V\hA0lEC
<br />Performed in accordance lvith DSA,iOSpHD/pROJECT approved documentB.
<br />Project Architecl
<br />Strudural Emin€€r
<br />DSA ReCional Ofrce
<br />School Distrid
<br />ConEaclor
<br />Buildiog D€parbnern
<br />otrnaa
<br />of Spcial lnspedor
<br />Maged Saad
<br />Prlnt Name
<br />PROJECT NAME: AIdi Mor Store f 34
<br />ARCHITECT APD TIME ARRIVED: 7:00 AM TIME DEPARTED: 3:00 PM
<br />ENGINEER: B&B Associates TRAVEL TIME LIJNCH TIME: -
<br />coNTRAcroR: ED GRUSH SUB CONTRACTOR
<br />INSPECTI ON ADORESS AODRESS OF pRoJECr: 2830 S. Bristot St, Santa Ana, Ca
<br />OF INS
<br />BACK FILL
<br />E] ENGINEERED FILLE Fou NoATtoN
<br />o
<br />D
<br />BATCH PLANT
<br />PT C'NCRETE
<br />SHOTCRETE
<br />CONCRETE
<br />RY
<br />E HlGH STRENGTH EoLTINGfl v'lelorr'rc
<br />E SHOPvvELD
<br />FI
<br />a ANCH OR/DOI/VEL
<br />NDE FIELD
<br />NOE SHOP
<br />CEILING WlRE
<br />tr
<br />DSA/OSH PROJECT
<br />APPROVEO DOCU MENTS
<br />VAJLABLE APFROVED
<br />PLANS Y N
<br />SOIL REPORT N
<br />N
<br />SPECS: Y N
<br />APPROVED SHOP DRAWNG Y
<br />EQEUIPi'ENT USED BY CONTRACTOR:
<br />! DRKAREA First and foundation Floor
<br />MATERIAL ST RE NoryEl \ leight Concrete , Hi-ri6de Mix
<br />MATERIALS USED BYCONi (INCLUDE RESEARC H REPORT NO
<br />On grid line 7.4 between line A and A.8 from level 11,*4,,To +1G0,, level.
<br />On grid line A.8 between line 7 and 7. from level 11L4,, To +16{,, level
<br />Shopping cart wallfrom level 0'-0,,To +40, level
<br />lnspected masonry unit for conformance to specification and Code.
<br />lnspected masonry mortar for proper mixing and handling.
<br />lnspected reinforcing steer for size, grade, type, rab sprice, secured rocations and crearance,
<br />All above work is still in progress as per approved plans and code.
<br />-lnspected the laying up of 8,,
<br />On grid line A between line 7
<br />CMU wall in the following locations;
<br />and 7.4 from level 11'-4,, To +160, level.
<br />R EWO KR PAS RE ENc T o ALL KWOR oT DA 0o/o CENTPER P R cOJE T co PLt\,t ET E
<br />cc
<br />Certifcaton t: I c 4457 4
<br />oar", 09/r5/2017
<br />-
|