My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
40130574 - Permit
PBA
>
Building
>
Permits
>
B
>
Bristol St
>
2830 S Bristol St
>
40130574 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 9:39:54 AM
Creation date
7/28/2021 9:39:43 AM
Metadata
Fields
Template:
Permit
Permit Number
40130574
Full Address
2830 S Bristol St
Permit ID
224583
Master ID Number
2016-132727
Project Name
Aldi Market TI
Street Number
002830
Street Direction
S
Street Name
Bristol
Street Suffix
St
Building Use Code
Retail/Service
Job Types
Tenant Improvement
Permit Type
Mechanical
Applied Date
11/8/2016
Issued Date
6/29/2017
Finalized Date
11/29/2017
Flood Zone
X-0602320259J
Description of Work
Note: Walk-in coolers are not part of this plan check and will require a separate permit
Nature of Work
TI
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TUIIG 1 <br />Corporatc <br />2992 E La PalnE Avo. Sto. A <br />Anaheim, CA 92EOo <br />Tel: 71,{.632.2999 <br />Fax 714.6ts.22374 <br />Dbp6rch: 8m.49129S <br />San OiegorlmF.rial County <br />6295 Ferri6 Squs.e St6. C <br />Sa.l Oiego, CA 92121 <br />Tel: 858.537.3999 <br />Fax: 85E.537.3990 <br />Dbpstch: 8aa.8.t4.506o <br />lnl.nd Empirc <br />1 4467 M.rilbh Pkn y. , Btdg 2A <br />Rivel6lde. CA 82516 <br />Tel: 951.653.4999 <br />Fax: 951 .653.4666 <br />Oisp.tch: 800.491.2960 <br />Irdio <br />449'17 Golt Conbr FJts,y., Ste.1 <br />lrdio. CA 92201 <br />f al:7@.U2.4677 <br />Fa\,?@342.15?5 <br />Dipobh: 8oo./tgt.2SO <br />MTGL PROJECT': 5t103A19 <br />perma r 10191322-17fl19 <br />RepodaaPag6 Iof1 <br />Speoal ln6pedlon Repo.E mut f,e d,strtuted to <br />Sepaaate leforls $all be paeparpd fo. eadl ttpe <br />Proied Arrhnect <br />Structural Englneer <br />DSA Regional Ofice <br />Sdtool oisfid <br />*P5-lgtq y .*l 1a 6nlr u* ,,eeao,' R!eo.t! or Do.t-coiplEnt 60nd1irE mult be dErribur.d immedEreryc' speod rl6pdrdl on a cbiy basE Edr rcpo.i 3hrI b. co.nptdd ard lUn€d by the cpec&i ,upecto. osrd,j@ng rE <br />'HE <br />WORK WAS WAS NOT THE WORK INSPECTED MET DID NOT MEETlnspectcd in accordance with tt|e requirements ofthe DSA./OSPHO/ <br />PROJECT approved doqrments. <br />Tha lgqulroments ol llro PROJECT doqrmontB <br />Samplos taken: <br />lrr,reather: <br />MATERIAL SAMPLING WASE WASNOTD N/A Et <br />Pertomed in accordance with DSI,/OSpHD/pROJECT app,oved documents. <br />Clear temp: 72 f <br />Contra(lor <br />Building Departrnert <br />oixnet <br />Signature of Special lnspedor <br />Maged Saad <br />Pnnt Name <br />1 <br />PRoJECT NAME: Aldi Mor Store # 34 Date: 09/ 14/2017 <br />ARcHITECT:APD TIME ARRIVED: 8:OO AM TIME DEPARTED: 5:OO PM <br />ENGINEE R: B&B Associates TRAVEL TIME LUNCH TIME,. <br />coNrRAcroR: ED GRUSH SU8 CONTRACTOR <br />INSPECTION ADDRESS ADDRESS OF PROJECT: 2830 S.Bristol St, Santa Ana, Ca <br />AACK FILL <br />TYPE OF INSPECTION <br />E ENGINEERED FILL <br />B FoUNDATToN E sHorcRETE <br />E coNcRETE <br />BATCH PLANT <br />PT CONCRETE <br />MASONRY <br />HIGH STRENGTH EIOLTING <br />O wELDTNG <br />SHOP WELD <br />otr <br />FIRE NG <br />ANCHOR/DOWEL <br />NDE FIELD <br />NDE SHOP <br />CEILING WRE <br />OS'r'OSHPD PROJECT <br />APPROVED DOCUMENTS PLANS Y N <br />AVAILABLE APPROVED SOIL REPORT Y N <br />N <br />N <br />APPROVED SHOP DRAW]NG Y <br />NonialWbight , Hi€radeMATERIALS USEO BY CONTRACTOR (INCLT.'lDE RESEARCH R EPORT NO, OR MATERIAL ]EST RE <br />2,500 PSl, ready mix # RS250G41 in the following locations: <br />m level 6'-8" To +11-4" level. <br />On grid line 7.4 between line A and A.8 from level 5,-8,,To +11-4,, level. <br />On grid line A.8 between line 7 and 7.4trom level 6"-8,, To +11-4,, level <br />One set of 3 grout samples was taken <br />Grout was mechanically vibrdted. <br />lnspected the placement of 4 yard grout <br />On grid line A between line 7 and 7.4 fro <br />ODAYREWOKRASPERNTCEALOFLWOTRK 0 PERCENT PROJECT COMPLETE <br />C ertr,icatio n <br />DAILYINSPECTION Ds^/crryFibr_ <br />REPORT DSArosHpDAppr I <br />osA,/LEA r _ <br />EOEUIPUENT USEO BY @NTRACTORi <br />u/oRK AREA: First and foundation Floor
The URL can be used to link to this page
Your browser does not support the video tag.