Laserfiche WebLink
TTITG t <br />Corporata <br />2S2 E La tulnt Aw. Sls. A <br />Anahsim. CA 92E06 <br />Tel: 71a.632.2999 <br />Fax:711.8.22371 <br />Obp.tch: 8@ ,49'1.2990 <br />San Oiagonrp.ri8l Courty <br />6295 Fenis Squar. $e. C <br />San Dego. CA 92'12'l <br />T6l:854.$7.3999 <br />F6x: 858.537.3990 <br />Oispatch: aaa.A44.5m <br />lndb <br />,{49i 7 Go[ Conb r Plo.ry-, sto.1 <br />lndb, CA 92201 <br />T.l'.7@.312.16 <br />Fix:760.342.21525 <br />CXrFdr: Ax).zlgl -2990 <br />lnla.d Empla! <br />14467 Meruian PktYy.. Adg 2A <br />R ivoEilo , CA 9251 E <br />T.l: s51 .653.,()90 <br />F.x: 951.63.,0886 <br />DtsFtcll: 8O0.491.2SO <br />MrcL PRoJEcTtr 5403A19 <br />Permiu 10191 322-175119 <br />Report t 2 Pag€ l of1 <br />DAILY INSPECTION <br />REPORT <br />osArctw Fib a _ <br />DSA/OSHPD Appl. t <br />DSA/LEA r _ <br />THE WORK INSPECTED MET DID NOT MEET <br />The requlrements ofthe PROJECT dooJments <br />Sampbs takcn: <br />Clear Temp: 72 f <br />Special lnsp.dot <br />Maged Saad <br />nnl Name <br />THE WORK WAS WAS NOT <br />lnspecled in accordance y,ith lhe rcqulrcments of the DSA/OSPHD/ <br />PROJECT approved doqrments. <br />\i/eather: <br />MATERIAL SAMPLING WASO WASNOTO N/AE <br />Performed in accordance Mth ostuosPHD/PROJEcT approved doclrnents. <br />Contrac{ot <br />Building Deparlment <br />Owner <br />Date: 09/13/2017PRoJECT NAME: Aldi Mor Store # 34 <br />TIME DEPARTEO: 3:00 PMARCHTIECT: APD TIME ARRIVED 08:00 AM <br />TRAVEL TIME LUNCH TIME: -ENGINEER: B&B Associates <br />SUB CONTRACTORcoNrRAcToR: ED GRUSH <br />ADDRESS oF PRoJECT. 2830 S. Bristol St, Santa Ana CA <br />CEJLING v\,/lREtrtrTYPE OF INSPECTION <br />E ENGINEERED FILL <br />E FoUNDATIoN <br />El BACK F|LL <br />trutrtr <br />BATCH PLANT <br />PT CONCRETE <br />SHOTCRETE <br />CONCRETE <br />tr <br />EIu <br />E MASONRY <br />}IIGH STRENGTH BOLTING <br />WELDING <br />SHOPWELO <br />E FIREPRooFING <br />E ANcHoR/Doti\rEL <br />E NDE FIELD <br />El NDE sHoP <br />AVAILABLE APPROVED <br />PLANSYENEI <br />SOIL REPORT Y E] N E]SPECS:YENE <br />APPROVEO SHOP DRAWNG Y E] N E] <br />OSIJOSHPD PROJECT <br />APPROVED OOCUMENTS <br />MATERIALS USEO BY CONTRACTOR (NCLUDE RESEARCH REPORT I{O, OR MATERTAL TEST REPORTS): NoT'TBIVV.(Ih CoNqEtO, HH3TAdE MiX <br />EOEUTpMENT USEO By coNTRAcTOR: BOOm lift, Harness, chipping hammers, wire brush and welding machines. <br />r,l/oRK AREA: First Floor roof <br />Completed welds were visually inspected in the following locations: <br />Canopy framing % " fillet weld between the L6X5X5/15 and HSS LOx4x7/4 as per detail 42 on sheet # 5-402 <br />for connection at grid lines F&7 and F&5.8. <br />Welds were inspected for size, len6h, location and free of visible defects. <br />Verified welders certificates as: christopher Ponce LA license #P031279 expire date 03/2018 and Rafael <br />De Paz LA license #P030500 expire date 05/2020. <br />All welding was performed as per approved plans and code. <br />All work detailed above is still in progress as per approved plans and code. <br />PERCENT PROJECT COMPLETEREWORK AS PERCENT OF ALL WORK TODAY: O% <br />Projec't Architect <br />Strudural Engineer <br />DSA R6gional Ofice <br />Sdrool tHrlct 479 <br />INSPECTION ADORESS: <br />Ce(ilication,