Laserfiche WebLink
MIG t <br />CoDorate <br />2992 E La PalrrE Av6. 516. A <br />Anahoim CA 92E06 <br />Tol:714.632.2999 <br />Fa,:7u.6322371 <br />Oispotcfi: 800.491.2SO <br />San Diegoilllp€rial Coutty <br />6295 Fsrris Squ.rs Sls. C <br />San Di€go. CA 92121 <br />Tel:858.537.39S <br />Fax: E5E.537.3990 <br />Dispatc*!: 888.844.5060 <br />lnland Emdre <br />14467 M.ridi.n Pkvay., Bdg 2A <br />Riv6rsilo. CA 92518 <br />T6li 951 853.4)99 <br />Fax: $1 .853-{686 <br />Okpatch: 4m.491.29X) <br />lrdio <br />4491 7 GoI Ccnter Pl$ay.. Ste.i <br />lndio. CA 9220'l <br />Tql]. 76 342.6n <br />Fe\-7al 312 1525 <br />CIsFbtr: 800.491.2SO <br />MTGL PRoJEcTI: 5403A19 <br />Pen tr'10191322-17509 <br />Reponr A Page I o, I <br />Specral lrEp€aton Report mul b€ disbtbubd to [le parE lded bebfl srlhtn 14 da)s ot the rmFad'o.l Repo.ts d norFcarnplort cdrdtivE mrd be dffirt€d mmadobly <br />THE WORK WAS WAS NOT THE WORK INSPECTED MET DID NOT MEET <br />DAILY INSPECTION <br />REPORT <br />OSA/CITY Fil6 I _ <br />OSA/OSHPO Appl. , <br />DSI,/LEA ' <br />- <br />lnspected in accordance with th€ requirem€nb oftho DSA./OSPHD/ <br />PROJECT approved dooJmenb. <br />\ily'aatheri <br />MATERIAL SAMPLING WAS E WAS NOT f] t.I/A E <br />Pcrformed in accordance with DSA,/OSPHD/PROJECT appDved docum€nts <br />The requirements ofthe PROJECT doqrments <br />Samples taken: <br />Clear temp. 7 2 I <br />re of Special lngpector <br />lraged Saad <br />Prinl Name <br />cerlifEation #: ICC{457479 <br />-.---2 <br />PRoJEcr NAME] Aldi Mor Store # 34 oate:0911212017 <br />ARcHrrEcTr APD TIME ARRIVEDT 08:00 AM TIME DEPARTED: 3:00 PM <br />ENGINEER, B&B Assoc.ates TRAVEL TIME LUNCH TIME: - <br />CONTRACTOR: ED GRUSH SUB CONTRACTOR <br />INSPECTION AODRESS ADORESS oF PRoJECTT 2830 S. Bristol St, Santa Ana CA <br />TYPE OF INSPECTION <br />O ENGINEERED FILL <br />E FoUNDATToN <br />E BACK FILL <br />tr <br />D <br />tr <br />E coNcRETE <br />BATCH PLANT <br />PT CONCRETE <br />SHOTCRETE <br />E MASo RY <br />E HIGH STRENGTB BoLTING <br />E V\TELDTNG <br />fl sHoPwELo <br />E FIREPRooFING <br />E ANCHoR/DoV€L <br />D NDE FrELo <br />E NDE SHoP <br />E cErLrNG r^tREtr_D-tr <br />OSA.IOSHPD PROJECT <br />APPROVEO OOCUMENTS <br />AVAILABLE APPROVED <br />PLANSYEINE <br />SoIL REPoRT Y E] N Ef SPECS:YENE <br />APPROVEDSHOP ORAWNGYE N E <br />MATERIALS USED BY COTITRACTOR 0NCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): Nonml\ l.ight Concrete, Hi6red6 Mix <br />EQEUTPfTTENT usED BY coNTRAcToR: Boom lift, Harness, Chipping hammers, Wire brush and welding machines. <br />vloRK AREA: Finst Floor roof <br />Completed welds were visually inspected in the following locations: <br />Canopy framing % " fillet weld between the L5X5X5/15 and HSS 10x4x1/4 as per detail A2 on sheet # 5-402 <br />for connection at grid lines F&5.4. <br />Welds were inspected for size, length, location and free of visible defects. <br />Verified welders certificates as: Christopher Ponce LA license f,P031279 expire date 03/2018 and Rafael <br />De Paz LA license fP030500 expire date O5/2O2O. <br />All welding was performed as per approved plans and code. <br />All work detailed above is still in progress as per approved plans and code <br />REWORK AS PERCENT OF ALL WORK TODAY: O%PERCENT PROJECT COMPLETE <br />cc Prolect Arch ecr <br />Structuaal Enoineer <br />DSA Regional Offce <br />Sdlool Didricr <br />Cont!'aclot <br />BuildkE DeFrfne <br />O ner <br />Verilied by