Laserfiche WebLink
TUIIG t <br />MTGL PRoJECTT: 3f03A19 <br />Penhit, 10191322-17309 <br />ReportrlPa0elof'l <br />Speqd hsFaioi Repo.E musl be <br />S€paBte reports riali be <br />THE WORK WAS WAS NOT <br />DAILY INSPECTION <br />REPORT <br />Corporalc <br />2992 E La hlrns Aw. Sls. A <br />An.h6in. CA 92806 <br />Tolr 711.632.2999 <br />F.x:714.6i2.2371 <br />oisp.ich: 6q).491.2990 <br />Contrador <br />Buildhg Dep6ftner{ <br />Owner <br />San Diagormperi.l County <br />6295 Forris Squ!.. sl.. C <br />Sen t ego. CA 92121 <br />Tel: 85E.537.3999 <br />Fax: 856.537.3()90 <br />Dispatch: E88.a?ta.5060 <br />lnlend EmFir. <br />14467 frori,an plffy., BldO ZA <br />Rive6{re. CA 9251S <br />T€l: 951.653.,1990 <br />Fax: 951.853.{686 <br />oisP.tct: aoo.4g.t.2g9o <br />l.rdlo <br />'1491 7 Gotr Cenbr ptwy.. Ste. 1 <br />lndio- CA 92201 <br />lel 7il.U2.6n <br />Fax:?@.342.4525 <br />Oispolclt: 800.,191.2990 <br />dEtrituEd to OE p6rt€6lded beb, <br />lor e6dl ttIE ca sp€aat <br />'nsped,on on <br />wthin 14 daF d the rEpedo.l.Rlro.ts d nqlcqnplbri co.ldituis mu< b€a d&ly ba.!. E cfi rsro.t stEfl be co.npt t€d a.!d .{rEd by tle specral r6pe0lcx cfid(Etng UE <br />THE WORK INSPECTED MEr DID NOT MEETlnspected i <br />PROJECT <br />n ac.ordance with th€ requtrements otthe DSAJOSpHD/ <br />approved doqJment6. <br />The requiEm€nb ofthe pROJECT doqrments <br />Sampbs taken: <br />Clear Temp: 77 tMATERIAL SAMPLING WAS E] WAS NOT E iI/A E <br />\4/€AthCT: <br />Porformed in accordance with DSA/OSPHD/PROJECT a;roved documents, <br />cc Proied Ar.fiitecl <br />SkucturEl Er€ineer <br />DSA Regionat Ofice <br />School Disldct <br />srg of SIEcal lnspedor <br />Maged Saad <br />Pnnt Name <br />Certification #: ICC 79 <br />Verified <br />PRoJECT NAMEi Aldi Mor Store # 34 Date. 09/08/2017 <br />ARCHITECT: APD TIME ARRTVED: 08:00 AM TIME DEPARTED: 3:OO PM <br />ENGINEER B&B Associates TRAVEL TIME LUNCH TIME: . <br />coNTRAcTOR: ED GRUSH UB CONTRACTORs <br />INSPECTI ON ADDRESS ADORESS OF PROJECT.2830 S.Bristol St,Santa Ana CATYP <br />EeE OF INSPECTION <br />NGINEEREO FILL <br />E routonrrolr <br />BACK FILL <br />TCH PLANT <br />PT CONCRETE <br />D sHorcRETE <br />CONCRETE <br />MASONRY <br />HIGH STRENGTH BOLTING <br />El wELorNG <br />SHOP WELO Dtr <br />REPROOFING <br />E ANcHoR/DowEL <br />NOE FIELO <br />NDE SHOP <br />G TA4REcEr <br />APPROVEO OOCUMENTS <br />HPD PR LE APPROVED <br />PLANS Y Nfl SOIL R N <br />NAPPROVED SHOP DRAwlNG Y <br />SPECS:N <br />MATE USE HR <br />\ r'oRK AREA First Floor roof <br />BYCONTRACTOR (INCLUDE RES NO, OR MATERIAL TEST R lYveight Concreto, Hi-rsrade <br />A & B and lines 5 & 6.4 to angel and f/2,,rod as per detail C2 on sheet # S_ <br />Welds were inspected for size, length, location and free of visible defects. <br />Verified welders certificates as: christopher ponce LA ricense #p031279 expire date 03/201g.All welding was performed as per approved plans and code exceot the followlnq item is innoncomoliance with plans: <br />As per sheet # S-111 '? joists should be reinforced which are located between lines A & B and lines 5 &6.4" Welding contractor is only reinforcing the middle 2 joists. <br />Engineer need to be notified with the above mentioned issue. <br />All work detailed above is still in progress as per approved plans and code. <br />Completed welds were visually i <br />-Reinforcing joist between lines <br />405. <br />nspected in the following locations: <br />TODAYREWORKPERCNTEOFALLRwoK lo0 P E CR NE T PR OJ EC cT OM PLETE: <br />DSA/CITY F'lo a _ <br />DSAOSHPO AIf{. , <br />OSA/LEA ' <br />EQEUTpMENT usEo sycoNrRAcroR: Boom rift, Harness, chipping hammers, wire brush and werding machines.