Laserfiche WebLink
[IIG 1 <br />Corpo.aL <br />2992 E L. Prlfta Aw. Ste. A <br />Araheim, CA 92606 <br />Tol:7t4.(xi2.2999 <br />F^\:714.6.2?g71 <br />Oisp€tch: 86 ,{91.2990 <br />San DiegonnFcrial Cou,rty <br />6295 Fsms Squars St . C <br />San Diogo, CA 92'121 <br />T6li 858.537.3999 <br />Fa!: &58.537.3990 <br />Dbpalch: 884.844.5060 <br />lnlsnd Eillt ire <br />tzl467 Meridian Pkyar., Btdg 2A <br />Riversiio, CA 92518 <br />Tel: 951.653.,1999 <br />Fax: 961.663.4566 <br />DisF.tchr 0@.491.2990 <br />lndb <br />rgl917 colt Cent r Pkry),.. S1e_I <br />lndio. CA 92201 <br />r*.7@.312.46n <br />Fax:7@.U2.4525 <br />oisFbn: 8fi).49.t 2SO <br />MTGt- PRoJEcrr: 5403A19 <br />Pem* r 10191322-17509 <br />RcporttlFage I o{ 1 <br />special lnspectjon Reports mir$ be dlstituted tc the partres lisH beki, r{thio 14 da}6 of the in€pedi,t ReportE ot Doo-comptaant coodrt|orls must b. dlsuuledS€perrte reports $all be prepared to. e&h lype ol6peo3l nspediyl on s dary b6s6 E d1 repo.t stlall be coanpl€ted ard sqned !y th€ Epectal rcpedd <br />THE WORK WAS WAS NOT THE WORK INSPECTED OID NOTlnspecled in accord6nce with the requirements of the DSA,/OSPHO/ <br />PROJECT approved document8. <br />WeEther: <br />MATERIAL SAMPLING WASO WAS NOT E] N/AE <br />Perlormed in accordance with DSA"/OSPHD/PROJECT approved documents. <br />Th€ rgquirements ofthe PROJECT dodrmcnts <br />Sampbs taken: <br />Clear Temp: 77 I <br />s ofs pecial lnspector <br />Maged SaadContractor <br />Buildlng Oepanmern <br />Osrner Print Name <br />cenificatron #: ICC{457t179 <br />PROJECT NAME AIdi Mor Store # 34 oate: 09/06/2017 <br />ARCHJTECT: APD TtME ARRIVED, 07:OO AM TIME DEPARIED: 3:OO PM <br />ENGINEER: B&B Associates TRAVEL TIME LUNCH TIME . <br />CONTRACTOR, ED GRUSH SU8 CONTRACTOR <br />INSPECTION AODRESS ADORESS OF PROJECT: 2830 S. Brislol St, Santa Ana CA <br />INSPECTION <br />BACK FILL <br />O ENGINEERED FILL <br />E FoUNDATToN <br />trtr <br />BATCH PLANT <br />PT CONCRETE <br />SHOTCRETE <br />CONCRETE <br />MASON <br />HlGH STRET{GTH BOLTING <br />IAiELDING <br />SHOP YVELO <br />o <br />FIREPR@FING <br />ANC HOR/DOiA,/EL <br />NDE FIELO <br />NDE SHOP <br />CEILING WREtrtr <br />OSfuOSH PROJECT <br />APPROVED DOCUMENTS PLANS Y N <br />AVAILABLE APFROVID SOIL REPORT Y N <br />Ntr <br />SPECS: Y N <br />APPROVED SHOP ORAWNG Y <br />EoEUTPMENT usED By coNrRAcroR, Boom lift, Hamess, chipping hammers, wire brush and $relding machines. <br />MATERIALS D BY CONT (rNcLU RE NO OR MA TEST RE <br />l ioRK AREA: First Floor roof <br />hl Concrste. Hiarad6 Mix <br />welds were visually inspected in the following locations: <br />-Reinforcing joist between lines ! & Q and lines Q & !.1[ to angel and !/2" rod as per detait C2 on sheet # S- <br />405. <br />Welds were inspected for size, length, location and free of visible defects. <br />All welding was performed as per approved plans and code. <br />Verified welders certificates as: Jeffery Rodgers license #PSF 046, Boris euinanilla AWS and Divan Michell <br />license # PSF 149. <br />All work detailed above is still in progress as per approved plans and code. <br />Completed <br />ER RWO ASK ERP ENC oT ALLF KWOR DATOY 1Yo PERCENT PROJECT COMPLETE: <br />Verified <br />DAILYINSPECTION DSArcrwFirer_ <br />REPORT D€A/osHpo Appr., <br />DSAr'LEA 4 _ <br />Proied Arrhite.t <br />Structural ErEinee, <br />OSA Regional Ofrce <br />Scfiool Dislrid