Laserfiche WebLink
**SNTA <br />NAffi <br />Planning E Building Agency <br />Building Salety Divlslon <br />20 Clvic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />-sol-01 cBc 2013 <br />2 <br />3 <br />Solar Photovoltaic (PV) Checktist for Detached SINGLE FAMILy RESIDENCES Onty <br />lnstructions: The licensed contractor of record shal complete aI sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to oach of rwo sets of plans, of <br />minimum 1 1" x 17" size. lf a ino NO to anv of the ouestion .D lan check sh all be req uired <br />Project Address: 904 S. SHANNON ST, SANTA ANA, CA 92704 <br />conlractor cornp"nf N <br />Conlractor a,""n"" nr]nOrr, <br />YES NO Ara the followlng applicable to the proposod projsct? <br />Will the PV system layout provide the raquired thrge-foot wid6 clear access pathways <br />per Section 605.'l 1 of the Catifomia Fire Code, and is this shown on the roof ptan? <br />Will the PV system bs installed on a roof having only one roofing layer with no <br />overlays? <br />Will th8 PV array be flush mounted to the existing roof so thal the plane of the <br />modules (panals) are parallel to th€ plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system bs installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will ths PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors bs installed wilh a maximum horizontat anchor spacing of 6 feet <br />and is this maximum horizontal spacing sho\ rn on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof raftsrs (with pre{rilled holes) and is this minimum emb€dment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stampsd and signad by a California <br />licensed professional engineer? (including project specific sile plan, pV layout, <br />anchorage spacing, anchorage details and manufacture/s pV support information.) <br />AD <br />a c <br />10 E tr <br />I certify under penalty of perjury under the laws of lhe State of California th ovo is lrue <br />ED <br />tsD <br />tsD <br />tstr <br />Etr <br />Eltr <br />4 <br />5 <br />6 <br />7 <br />8 <br />I trE <br />Print Name: TRANG CONG PHAM <br />phone Number: 714 582 3909 <br />Signature <br />Oate: <br />Email Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />Rev: 8/1712015 <br />ea <br />lt