Laserfiche WebLink
,,.-SANTA <br />NA,',il,*ffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Cenler Plaza <br />P.O. Box 1988 (M-ig) <br />Santa Ana, CA 92702 <br />(7r4) 647-5800 <br />www.sanla-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below, A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1 1" x '17" size. lf answerinq NO to anv of the questions. plan check shall be required. <br />Project Address:L \.i tl t <br />Contractor Company Name: <br />Contractor License Number: <br />YES NODg <br />Etr <br />Etr <br />r\c <br />6 9qb <br />Are the following applicable to the proposed project? <br />wirr the pv system rayout pro".";";";ffi;#.", -,0" oim\..[h]"* <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />ovedays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minjmum of 2-112 incn <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Signature <br />Date 1 <br />\ <br />*y Fir< <br />*pgu''-\ <br />4 <br />2 <br />3 <br />6 <br />7 <br />8 <br />Etr <br />tstr <br />&tr <br />Etr <br />Etr <br />Ettr <br />9 <br />10 trtr <br />I certify under penalty of periury under the laws of the Stale of California at the abo ue <br />PrintName:@ <br />Phone Number: 7tq -115' F1o\ <br />Email Address: \6:.\u^r-a \ ,.c.L 77 @ c "^^.\ <br />', Lau- <br />t- <br />J J <br />Rev: 11/19/2015 <br />1.