My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
40131628 - Permit
PBA
>
Building
>
Permits
>
T
>
Towner St
>
924 N Towner St
>
40131628 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 9:41:20 AM
Creation date
7/28/2021 9:41:19 AM
Metadata
Fields
Template:
Permit
Permit Number
40131628
Full Address
924 N Towner St
Permit ID
236490
Master ID Number
2017-140195
Project Name
Miscellaneous Counter1 Permit
Street Number
000924
Street Direction
N
Street Name
Towner
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Miscellaneous
Permit Type
Mechanical
Applied Date
11/29/2017
Issued Date
11/29/2017
Finalized Date
8/27/2019
Flood Zone
X-0602320144J
Description of Work
Furnace change out, ductwork.
Nature of Work
HVAC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTITICATE OF INSTALTATION cF2R-MCH-20-H <br />Duct Leakage Oiagnostic Test (Page 2 of 3) <br />c. Additional Requirements for Compliance <br />01 System was tested in its normal operation condition. No temporary taping allowed <br />02 <br />Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage <br />testing. OA ducts used for Central Fan lntegrated (CFl) lndoor Air Quality ventilation systems, or Central Fan Ventilation <br />Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA i5 not required, <br />may configure the OA damper to the closed position durang duct leakage testing. <br />03 <br />BuildinS cavities were not used as plenums or platform returns in lieu of ducts <br />05 lf cloth backed tape was used it was covered with Mastic and draw bands <br />06 All connection points between the air handler and the supply and return plenums are completely sealed <br />Visual lnspedion at Final Construction Stage (applicable if syitem was tested at rough-in). <br />After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must <br />be performed <br />07 Hil#f:r,#. <br />return residers, verify that tirefft:BtF*n the resister boot and the interior finishins wall are <br />08 <br />lf the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points <br />between the air handler and the supply and return plenums to verify that the connection points are properly sealed. <br />09 lnspect alljoints to ensure that no cloth backed rubber adhesive duct tape is used <br />Registration Date/f ime: 2017-12-08 14:35:41Registration Number: <br />417-A020133 1004-000-001-M20002A-0000 <br />CA Building Energy Efficiency Standards <br />2016 Residential Compliance <br />Report Version: 2016.1-006 <br />Schema Versioni rev 03/15 <br />Report Generated: 2017-12-08 14:35:43 <br />All supply and retu.n register boots were sealed to the drywall <br />04 <br />The responsible person's signature on this compliance document affirms thal all applicable r€quirements in this table have <br />been met. <br />HERS Providen CHEERS
The URL can be used to link to this page
Your browser does not support the video tag.