Laserfiche WebLink
CERTITICATE OF INSTALTATION cF2R-MCH-20-H <br />Duct Leakage Oiagnostic Test (Page 2 of 3) <br />c. Additional Requirements for Compliance <br />01 System was tested in its normal operation condition. No temporary taping allowed <br />02 <br />Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage <br />testing. OA ducts used for Central Fan lntegrated (CFl) lndoor Air Quality ventilation systems, or Central Fan Ventilation <br />Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA i5 not required, <br />may configure the OA damper to the closed position durang duct leakage testing. <br />03 <br />BuildinS cavities were not used as plenums or platform returns in lieu of ducts <br />05 lf cloth backed tape was used it was covered with Mastic and draw bands <br />06 All connection points between the air handler and the supply and return plenums are completely sealed <br />Visual lnspedion at Final Construction Stage (applicable if syitem was tested at rough-in). <br />After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must <br />be performed <br />07 Hil#f:r,#. <br />return residers, verify that tirefft:BtF*n the resister boot and the interior finishins wall are <br />08 <br />lf the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points <br />between the air handler and the supply and return plenums to verify that the connection points are properly sealed. <br />09 lnspect alljoints to ensure that no cloth backed rubber adhesive duct tape is used <br />Registration Date/f ime: 2017-12-08 14:35:41Registration Number: <br />417-A020133 1004-000-001-M20002A-0000 <br />CA Building Energy Efficiency Standards <br />2016 Residential Compliance <br />Report Version: 2016.1-006 <br />Schema Versioni rev 03/15 <br />Report Generated: 2017-12-08 14:35:43 <br />All supply and retu.n register boots were sealed to the drywall <br />04 <br />The responsible person's signature on this compliance document affirms thal all applicable r€quirements in this table have <br />been met. <br />HERS Providen CHEERS