My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10177791_2102 N. TUSTIN - Plan (2)
PBA
>
Building
>
Plans
>
T
>
Tustin Ave
>
2102 N Tustin Ave
>
10177791_2102 N. TUSTIN - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2026 3:33:39 AM
Creation date
10/25/2020 9:41:16 PM
Metadata
Fields
Template:
Plan
Permit Number
10177791
Full Address
2102 N Tustin Ave
Street Number
2102
Street Direction
N
Street Name
Tustin
Street Suffix
Ave
Fully Linked
True
Document Relationships
10177791 - Permit
(Permit - Plan)
Path:
\Building\Permits\T\Tustin Ave\2102 N Tustin Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Job Truss Truss Type Qty Pty <br />R36138892 <br />12889 B02 SLOPING FLAT 45 1 <br />Tin,co Truss and Framing Supply, HESPERIA CA 92345 <br />IJob Reference (optional) <br />7.250 s May 11 2011 MiTek Industries, Inc. Wed Mar 27 10:03:27 2013 Page 2 <br />ID:aWQIhHladRB#Iqyp2LMTIxysDYG-__004gSQ6'jirr_je2dxtHdtrivCidGiNVlp_hzWk<U <br />LOAD CASECS) Standard <br />1) Regular: Lumber Increase=1.25, Plate Increase=1.25 <br />Uniform Loads (pif) <br />Vert: 1-3=-80(F=-10), 4-10=-70, 11-18=-10 <br />Concentrated Loads (lb) <br />Vert: 8=-1657=-165 <br />f <br />WARMING · Verify design parameters and READ NOTES ON THIS AND INCLUDED MIl'EK REFERENCE PAOB MI!-7473 BEFORE USE. <br />Design valid for use only with MiTek connectors. This design is based only upon parameters shown. and Is foran individual building component. <br />Applicabinty of design parameters and proper incorporation of component b respons[bBity of building designer - not truss designer. Bracing shown <br />is for lateral support of Individual web members only. Additional temporary bracing to insure stability during construction is the responsibmly of.the <br />erector. Additional permanent bracing of the overall structure Is the responsibmly of the building designer. For general guidance regarding <br />fabrication. quality control, storage. delivery, erection and bracing, consutt ANSI/!Pll Quatily Crtle,la. DSB-89 and BCSI Building Componenl <br />Salety Information available from Truss Plate Institute, 781 N. Lee Street. Suite 312. Alexandria. VA 22314. <br />If Southern Pine(SP) lumbe, 1, specified, the design values ire those effective 06/01/2013 by ALSC <br />ie ' <br />7777 Greenback Lane, Suite 109 <br />Citrus Heights, CA, 95610
The URL can be used to link to this page
Your browser does not support the video tag.