Laserfiche WebLink
City of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, c492702 <br />Permit Counter: (714) 647 -5800 lnspection Requests: (714) 667-2738 <br />Electrical Permit #: 20132731 <br />lnspector's Section: (714) 647-5853 <br />Project Address: 1345 N Cabrillo Park Dr <br />Assessor'sParcel: 400-141-06 Lot: 1 <br />Suite: 6 <br />Block: NA <br />Bldg: B <br />Tract: 10823 <br />Suite Range: <br />Zoning: R4 <br />Owner: <br />Address: <br />Phone <br />Tenant Name: <br />Tr <br />1345 N Cabrillo Park Dr 6 <br />Santa Ana, CA 927013106 <br />Young Kim lnc. <br />16814 Marilla st <br />Northridge, CA 91343 <br />(818) 892-6280 <br />Fee Type <br />Receptacle <br />Switch <br />Light Fixture <br />Trust Applied <br />Min Fee Adj <br />lssuance <br />Notes: pd on M-48095. <br />Qty <br />8.00 <br />7.00 <br />5.00 <br />1.00 <br />1.00 <br />1.00 <br />PAID <br />FEB 23 2006 <br />Amount <br />0.84 <br />0.84 <br />0.84 <br />-52.50 <br />3.20 <br />32.50 <br />Fee <br />$6.72 <br />$5.88 <br />$4.20 <br />$-52.50 <br />$3.20 <br />$32.50 <br />$0.00 <br />$0.00 <br />$0.00 <br />Phone <br />State Lic #: 684052 <br />Lic Type: B, B, C-33, C-33 <br />Bus. Lic #: 315'114 <br />Workers' Compensalion lnsurance:Carrier: State Fund <br />Policy #: 1823737 <br />Expires: 05/01/2005 <br />,1.'.tY-\ <br />Building Use: {"ttt+rt-lyti"-fficcupancy: <br />Job Type: Alteration \!t U-(Uponstr type <br />Nature of Work: Kitchen Remodel 6 6ryr61311 Code: <br />r <br />I <br />City Sanra <br />R-1 <br />V.N <br />cEc 2001 <br />Planning Conditions: No Exterior Work <br />Planning Approval By <br />Plan Checked By: <br />Permit lssued By: <br />Subject lo Field: <br />Ahangian, Kathy <br />Date <br />Date <br />Date 02t24t2006 <br />l\i]isc. Receipt: <br />lVisc. Receipt: <br />lvlisc. Receipt: <br />Building Permit #Fee Total: <br />Paid to Date: <br />Balance Due <br />Account#: 01 1-01-5913 lnspector lVllD#: 2006-67704 <br />Address Range: <br />Historic: No <br />Contractor: <br />Address: <br />This pemit shall expire by limitation and become null and void if the wotu authoized by this pemit <br />is not commenced within 180 days from the date of this pemit, or if the wo* authoized by this <br />pemit is suspended or abandoned at any time after the wot* is commenced for a peiod of 180 days. <br />Before such wotk can be recommenced, a new pemit shall be first obtained to do so.