Laserfiche WebLink
*-SANTA <br />NA-"'FiI <br />Planning & Building Ag0ncy <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.orq <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />soL-01 cBC 2013 <br />Project Address:+k <br />Contractor Company Name: <br />Contractor License Number: <br />Sor.r RO <br />2 <br />\Es No <br />UD <br />utr <br />Es <br />Are the following applicable to the proposed project? <br />\Mll the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />\Mll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />\Mll the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />\Mll the PV system weigh maximum 4 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />\Mll the PV system be installed with a space of 2" minimum to 10,, maximum between <br />the underside of modules and the surface of the roof? <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Vvill the minimum 5/16" lag screws be installed with a minimum ol Z-llZ inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Catifornia <br />licensed professional engineer? (including pro.iect specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's pV support information.) <br />3 <br />4 Ntr <br />tr <br />tr <br />6 Ntr <br />, Ntr <br />8 Ntr <br />, Etr <br />'10 g D <br />I certify under penalty rjury under the laws of the State of California that the above is true: <br />Print Name Signature: <br />Date: \oPhone Number \\Lo <br />Email Address <br />Rev 8/1712015 <br />,(taaalhr^I 4.r m. fl^r- <br />Solar Photovoltaic (PV) Checktist for Detached STNGLE FAMtLy RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the ce(ification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1 1 " x 17" size. lf answerinq No to anv of the questions. plan check shall be required. <br />d\