Laserfiche WebLink
*,,SANTA <br />NA-Iffi, <br />Plannlng & Bullding Agency <br />Buildlng Srloty Divislon <br />20 Clvlc Cont€r Plsza <br />P.O. Box 1988 (M-19) <br />Sant. Ana, CA 92702 <br />(71'l) 647-s800 <br />www.santa.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 csc 2013 <br />Solar Photovoltalc (PV) Checklist for Detached STNGLE FAMtLy RESTDENCES Onty <br />lnslructlons: Ths licensed contractor of record shall complete all soctions, answer the ten queslions and <br />sign the certification seclion below. A copy of this form shall b6 attachod to 6ach of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerlnq NO to anv of the ouestions. ol an check shall be required. <br />Project Address 2510 W. CHANDLER AVE, SANTA ANA, CA 92704 <br />conlractor company tlame: SOUTHWEST SUN SOLAR, INC <br />contractorLlcenseNumber: 1004667 <br />YES NO <br />tr tr <br />Etr <br />g. tstr <br />Rov:8/1712015 <br />4 <br />5 <br />2 <br />3 <br />6 <br />7 <br />I <br />Etr <br />Ettr <br />atr <br />Ero <br />atr <br />atr <br />Are the followlng applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the rool plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay b€ flush mount€d to the existing roof so that th€ ptane of the <br />modules (panels) are parallel to the plane of the roon <br />Will the PV system weigh maximum 4 pounds per square feel or less? <br />Will the PV system be installed where the modulos do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizonlal anchor spacing of 6 feet <br />and is lhis maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16'lag screws bo installed with a minlmum of 2-112 inch <br />embedment into roof rafters (with pre-drillsd holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California10Etr <br />licensed professional engineer? (including project specific site plan,layout, <br />anchorage spacing, anchorage details and manufaclure/s PV su rt information.) <br />I cerlify under penalty of perjury under the laws of the State of Californi that e above is true <br />Print Name. TRANG CONG PHAM <br />phone Number: 714 582 3909 <br />Signature <br />Date: <br />Emait Address: PERMIT@SOUTHWESTSUNSOTAR.COM <br />I