Laserfiche WebLink
*-SANTA <br />NAffi <br />Planning & Building Agency <br />Building Salqty Division <br />20 Clvic Cont€r Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647.5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 c8c 2013 <br />Solar Photovoltaic (PV) Checklist tor Detached STNGLE FAMtLy RESTDENCES Onty <br />lnslruclions: The licensed contractor of record shall complete alt sections, answer the ten questions and <br />sign the certification section below. A copy ol this form shall be attached to sach of TWO sets of plans, of <br />minimum 11" x 17" size n NO f the uestions shall be ut <br />Proiect Address:1 830 W, FLORA ST, SANTA ANA, CA 92704 <br />contractorLicenseNumber: 1004667 <br />1 <br />YES NO <br />EO <br />Etr <br />tstr <br />tstr <br />Etr <br />EID <br />atr <br />atr <br />tstr <br />Eltr <br />Are lhe following applicabl€ to lhe proposod project? <br />Will the PV system layout provide th€ required three-foot wide clear access pathways <br />per Section 605.'l 1 of the Califomia Fire Code, and is this shown on the roof ptan? <br />Will the PV system be installsd on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounled to the existing roof so that the plane of the <br />modulss (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not ovsrhang any roof edges <br />(such as eaves, gabled ends, ndges and hips)? <br />Will the PV system be installsd with a space of 2" minimum to 10" maximum between <br />the undeBide oI modules and the surlace of the roof? <br />Will the PV system be installed without using any ballast system or counler-weight <br />system? <br />Will the anchors be installed wilh a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-i12inch <br />embedment into roof raflers (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />I <br />10 <br />licensed professional engineer? (including project specific site plan, <br />anchorage spacing, anchorage details and manufacture/s PV supp <br />PVI <br />rmation.) <br />I certify under penalty of perjury under the laws ot th€ State of California above is true <br />print Name: TRANG CONG PHAM signature <br />phone Number: 714 582 3909 Date: <br />Ema i Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />Rev' 6/17120r5 <br />t <br />6 <br />contractor company Name: SOUTHWEST SUN SOLAR, INC