Laserfiche WebLink
*-SANTA <br />ANA <br />Itr\\t\c <br />t[til.0r\[ <br />1[L\il <br />Planning & Bullding Agency <br />Building Safety Diyision <br />20 Civic Cenler Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol4l CBC 2013 <br />Solar Pholovoltaic (PV) Checklist for Detached SINGLE FAMILy RESIOENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the len questions and <br />sign the certiflcation section below. A copy of this form shall be attached to each of TWO s ets of pians, of <br />minimum 1 'l " x 1 7" size. lf answerin NO to anv of the oues tions, Dlan check shall be required. <br />Project Address:l*o I /\/ h/esn r,/t)o b /AvC f A^-TA 4*A qL'?o 6 <br />Contractor Company Name: 9Ut"t+/t t O€ tcto*n / p a <br />Contractor License Number; /OOz 4/ + <br />2 <br />YES NO{o <br />Ertr <br />WE <br />ETEI{a <br />{a <br />{a <br />m <br />da <br />{s <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required threeJoot wide clear access pathways <br />per Section 605.11 ofthe California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV systom be installed with a space of 2" minimum to lO" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counler-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16" lag screws be installed with a minimum of Z-1tZ inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's pV support information.) <br />3 <br />4 <br />6 <br />7 <br />8 <br />9 <br />10 <br />I cortify under penalty of perjury under the laws of th <br />Pnnt Name Ltl W PAlc <br />e State of <br />Signature <br />Date: <br />Calif ornia thr/rha abore,%.4 <br />Phone Number:213-tr1-0(g 1 lu/zr /r <br />Email Address <br />Rev 11/19/2015 <br />t/1 LUtr'r e SuNtu't &rOLtAn, ltc 1 <br />1 <br />is true <br />1.