Laserfiche WebLink
Planning & Building Agoncy <br />Bullding Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(71'+) 647-5800 <br />www,santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructlons: Th€ licensed <br />sign the certification section <br />contraclor of record shall complete all sections, answ€r the ten questions and <br />b€low. Acopyof this form shall be attached to each of TWO sets of plans, of <br />n n NO of the ues n check shall be re <br />Project Address:S anta Ana, CA 92706, US <br />Contractor Company Name:Solar City Corporation <br />Contractor License Number:t3tilJ104 <br />YES NO <br />Eltr <br />2 trtr <br />trtr <br />trtratr <br />tro <br />au <br />3 <br />4 <br />5 <br />6 <br />7 <br />B Etr <br />I EO <br />10 AD <br />I cortiry undor penalty oI periury undor the laws of the State of lifo <br />print Name: Melissa Foxx Sign <br />Phone Number: <br />Email Address: <br />702-785-2998 <br />R6v: &1712015 <br />mfoxxsarmiento@tesla.com <br />oajr-. 11t14t17 <br />ia that is truo: <br />*-SANTA <br />IL$X\G <br />lct\ii <br />minimum tt'x \Zi4ig. <br />Ara the followlng appllcable to the Proposed project? <br />Will the PV systom layout provide the required three'foot wide clear access pathways <br />per Sec'tion 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />ov6days? <br />Will the PV anay be flush mounted to the existing roof so that the plane of th€ <br />modules (panels) are parallol to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do nol overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16" lag scrows be installed with a minimum ol 2-112 inch <br />embedment into roof rafters (with preirill€d holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including proiect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.)