Laserfiche WebLink
Title Page <br />Building code analysis <br />1.Description of use-Warehouse/Storage <br />2.Occupancy-S-1 <br />3. Whether separated or unseparated <br />4. number of stories-1 <br />5. Type of construction-Type V-B <br />6. sprinklers-Yes <br />7.Floor area-21,864 square feet <br />8. height-35-ft to deck <br />9. 2022 CBC Codes Applied <br />10. 2022 CEC Codes Applied <br />11. 2022 CFC Codes Applied <br />12.2022 CEBC Codes Applied <br />13.Deferred submittal for fire alarm plan <br />14.2022 NFPA-13, Section 11.1.7 Applied <br />Tabel of contents: <br />PG. 1 –Title Page <br />PG. 2 –Site Plan <br />PG. 3–Electrical <br />PG. 4–Fan Cut Sheet <br />PG. 5--Structural <br />SITE ADDRESS <br />1900 E. Deere Ave <br />Santa Ana CA 92705 <br />CONTRACTOR <br />DRB ELECTRIC <br />Owner: Jonathan P Burnett <br />13127 Point reyes pl <br />Cerritos ca 90703 <br />PH 5622152794 <br />drbelectric@live.com <br />PG.1 <br />Scope of work: <br />Install 1 ceiling fan, BIG ASS FAN,24’, <br />Model ‘PFD’ , 480 volt , 3 phase <br />Run power from (panel 2) ,crt #13, <br />20 amp breaker, 4 conductor, <br /># 12 thhn wire. <br />This page Designed <br />By Jonathan P Burnett <br />____________________ <br />C10 License # 846308 <br />Date signed 11/25pp/25 <br />-Including the following <br />1.The maximum fan diameter shall be 30 feet. <br />2.The high velocity fan must be centered approximately between four adjacente fire sprinklers. <br />3.The vertical clearance from the HVLS fan to fire sprinkler deflector shall be a minimum of 3 feet <br />4.All HVLS fans shall be interlocked to shut down immediatley upon receiving signal from <br />sprinkler flow, smoke detectors, and pull station from FACP in accordance with the NFPA-72