Laserfiche WebLink
professional TileTrac®SOLAR <br />products;Installation Manual <br />Date Modified: 09/12/07 <br />Installation steps overview <br />1) System layout & chalk line marking <br />2) Locating roof rafters along chalk lines <br />3a)Scaling/attaching TileTrac®(S-Tile Roof) <br />3b)Sealing/attaching TileTrac® (Composition Shingle Roof) <br />4) Clean up/Quality Inspection <br />Step 1: System layout & chalk line marking <br />Chalk line - to reference <br />Prior to beginning attachment work, the system ,0>1 ...-1-5\ support rail placement <br />..4< 1 <br />roof layout should be defined. <br />-.. <br />A drawing or sketch, prior to roof work, is . ......\ .....7. <br />...... .....3-<2 / <br />recommended.44.- ..><-, <br />Upon finalizing layout, use chalk lines to mark <br />support rail locations. The chalk lines will be <br />used to align TileTrac® attachment points. <br />Note: All support rails should be placed 48" <br />apart along the module length. The rail dis- <br />tance from the end of the module will vary <br />based on module size. <br />4/ -- <br />)222- 0:22 .<.. ....E <br />/ <br />Note: When configuring .......GA <br />-i-*/ayout account for a 0.6"inter- - . >0 <br />module clamp space between <br />modules and 2" for each end of <br />the modu/e array for end clamp <br />spacing. <br />*k The 48" grid design is based on 12", 16" or 24" on center (o/c) rafter spacing. <br />- (12" x4= 48", 16" x3= 48", 24" x2= 483 <br />All product specifications are based on 48" paired support rail spacing. <br />Proper module/rail orientation-single array sample Clamps must secure the module on the <br />/ong end of the frame. The span of the two <br />support rails should be 48". <br />3¢%588*:***Di EXAMPLE: (Using a 64" long module) <br />A <br />IV -V- t <br />29<P<>C><>05 7 <br />48" 64" <br />' 2.0" End ClampO.6" Intermodule U.02< ... _- --v vspacing1 1 <br />clamp spacing 11 ,- 8" vPage 2 of 8 <br />V