My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10179443_3102 S. BAKER - Plan (2)
PBA
>
Building
>
Plans
>
B
>
Baker St
>
3102 S Baker St
>
10179443_3102 S. BAKER - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2022 12:03:24 AM
Creation date
10/25/2020 9:44:15 PM
Metadata
Fields
Template:
Plan
Permit Number
10179443
Full Address
3102 S Baker St
Fully Linked
True
Document Relationships
10179443 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Baker St\3102 S Baker St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
professionalSOLAR TileTrac® <br />products Installation Manual- <br />Date Modified: 09/12/07 <br />STEP 6 <br />STEP 6: Thread the short cup head <br />stud into the upper carriage with a <br />hex key and tighten to 14 ft/lbs. <br />The nut/washer combination will <br />be installed after the support rail is <br />in place. <br />Repeat steps 1-6 until all TileTrac® <br />attachments are installed, then <br />refer to the RoofTrac® installation <br />guide for the support rail and mod- <br />ule clamping installation steps. <br />STEP 4 <br />STEP 4: Install the lag bolt and <br />washer into the roof (cordless im- <br />pact wrench recommended) using <br />a 1/2" socket drive until the lag bolt <br />is seated. DO NOT OVERTIGHTEN. <br />The Ejbalant should flow outward <br />sealing any holes that were made <br />to loc·*te the after. <br />STEP 5 <br />STEP 5: After bolting TileTrac® to <br />the roof, slide the upper carriage <br />into the desired position. <br />Step 5: Clean up / Quality Inspection <br />Clean-Up: <br />Account for all tools and clean area as necessary. <br />Quality Inspection: <br />Contractors are advised to perform a final attachment <br />quality inspection prior to installing the Rooffrac® <br />mounting system to ensure all attachments are properly <br />fastened. <br />Page 7 of 8 <br /> Make sure all installation crewmembers on the roof are mind- <br />ful of protruding roof attach- <br />ments to prevent tripping. All <br />installation crew members <br />should utilize proper safety <br />equipment when installinga <br />solar system.
The URL can be used to link to this page
Your browser does not support the video tag.