Laserfiche WebLink
Soilartity R ECEIVE <br />AUG 2 9 2013 <br />3055 Clearview Way <br />San Mateo, CA. 94402 <br />(888)-SOL-CITY (765-2489) 1 www.solaicity.com City of Santa Ana <br />August 27, 2013 <br />Project/Job # 927403 <br />RE:COVER LETTER <br />Project:Schwartz Residence <br />1123 Cabrillo Park Dr <br />Santa Ana, CA 92701 <br />To Whom It May Concern, <br />A jobsite survey of the existing framing system was performed by an audit team from SolarCity. The attached structural calculations are <br />based on site observations and the design criteria listed below: <br />Design Criteria: <br />- Applicable Codes = 2010 CBC, ASCE 7-05, and 2005 NDS <br />- Roof Dead Load = 15 psf (All MPs) <br />- Roof Live Load = 20 psf (All MPs) <br />- Ground Snow Load = O psf <br />- Risk Category = II, Wind Speed = 85 mph, Exposure Category C <br />- Solar modules = As indicated in attached drawings. <br />On the above referenced project, the structural roof framing has been reviewed for loading from the PV system on the roof. The <br />structural review, including the plans and calculations only apply to the section of roof that is directly supporting the PV system and its <br />supporting elements. After review it was determined that the existing structure is adequate to carry the PV system loading. <br />The structural roof framing and the new attachments that directly support the gravity loading from PV modules have been reviewed <br />and determined to meet or exceed requirements of the 2010 CBC. <br />Please contact me with any further questions or concerns regarding this project. <br />Sincerely, <br />Abe De Vera, P. E. <br />Civil Engineer <br />Main: 888.765.2489, x7526 <br />email: adevera@solarcity.com lim|m A <br />lie < N 22 <br />OF CA\3 <br />Digitally signed by Abe De Vera <br />Date: 201 3.08.28 13:50:05 <br />-07'00'