Laserfiche WebLink
Quick Mount PV® <br />Your Solution in Mounting Products <br />Solar • H20 ' Conduit • HVAC • Custom <br />Composition Mount Specifications - Wle' - Pv. <br />Quick Mount PV ® is an alkin-one waterproof flashing and mount to anchor photovottalc racking systems, solar thermal panels, <br />air conditioning units, satellite dishes. or anything you may need to secure to a new or existing roof. It is made In the USA of all <br />aluminum and includes stainless steel hardware. It works with all standard racks, installs seamlessly and saves taborby not need- <br />Ing to cut away any roofing, will out live galvanized 2 to 1, and is a better low-profile mount. <br />irr <br />Split Lock Washer SS 5/18* (1101 a theft- <br />prevention feature) <br />Fender Washer SS 5/16' x 1' ------______ <br />EPOM Rubber Washer 60 Durometer 5/16' - <br />Scaling Washer SS 5/16' - <br />Manger Bolt SS 5/16' x 6' --- <br />1 1/4'Machine, 1 3/4' Spacer, 3' Lag <br />MountS Flashing Aluminum - <br />Mount 1 1/4' x 1 1/4' x 2 1/4' Beveled Block --·.. <br />Flashing .05- thick ,\ <br />For standard composition roofs: <br />Bashing is 12' x 12- <br />mount is attached 3' off center <br />ESR-2835 <br />. 121 Hex Nuts SS 5/16' <br />Lag pull-out (withdrawal) capacities (lbs) in typical lumber: <br />Lag Bolt Specifications <br />Specific 5/16' shaft 5/16- shaft <br />gram per 1' <br />trwead depth thread depth <br />Douglas Flr, Larch m 798 <br />Douglas FIr, South .48 705 <br />Engehnanr, Spruce. Lodgepole Pine <br />(MSR 1650 f & Ngher).48 705 <br />Hem, Ar 6 <br />Him, Fir. (No,th).48 705 <br />Southern P&.5S 921 <br />Sen,ce, Pine, Fk .42 615 <br />Spruce, Pim, Ft (E of 2 miton pil and hwher <br />grades of MSR and MEL)..50 798 <br />Souoes: Unitorm Building Code: American V,tod Counct <br />Notes: <br />1) Thread must be embedded In a fafter or other ettuctural roof member. <br />2) Se, IBC for required edge disk,ncea 936 Detroit Ave Suite D, Concord, CA 94518 <br />Phone: (925)687-6888 Fax· (925)687-6689 <br />Email: info@quickmountpv.corn -w.quickmountpv.corn <br />144 Aug 2011 <br />Know Your Roof <br />N h a good Idea to do a thor=Gh roof evatuatin prior to your project *tattation. Al this tine you ihould do a layod or, the roof corrihiklg eve,ye# on the drowing <br />%¥11 Reitti,Irtended. Ally trrewartiessholldbe noted now. " '. - ' .The quaily of the roonrg,howld be deter-ed, <br />ete man,hcturer, the age 01 roof, thetypeo,substrate (ply-d orollerm,d Itrund board IOSBD, the ialter stze, the spact,g and :pan, the age of roofucture, who <br />rooled It, who bum It etc. <br />-- '..Tuicalthebulldnwne,canlookina Beand find the conposition manulactuler. If not, takea plecetothe room,ya,6. theycan usually recognlze 018 makerand therot,h vhtige. ttl,theneasy <br />·' I . the roonle materials you ar® de@!tre wlth. The mant,Itact-/ Ineuctlons wit spel out exectiywhat <br />does und does notvoldthewarrarly ofthet roonng product. Moithave e clause about roofter,wue. Thts 1,©or•nonly nased. bdcan easty be noted 0 you rcid <br />theinstruction;. 0111ciallr, 11 - . ' ' p " .= ouproduct isweavlt·, Nother;. Itis alloirrwtart to have Bet <br />inanuctions In tholob fle, b any Uln relerence. If the menuicturer cannot be lound, there h obvlously no war,unty in ptace. <br />On a roof th,1 hai e material and labor warrer¢y h place (newrooD. 1118 reconinended to al least conia the roolerot record. ORen the roofir, contractor will vold the <br />labor portion of thclrwarrer#y lf another trade modines e,elr work. Glve th, rooN, contracto, the option of hander,the 100#ng modincations.oral kast glve them the <br />oppottidtytilnspect andapprovethemodme*lon*you make. 11 - - ' ' ' ··· ' ' " - ·wanar,tyltehotild begoodmoneyspent. <br />Product Selection <br />The Composmon Motrit b Intended to 111 w!!Nn most composilon and wood shtngle <br />mof .ystams. bu not an. Spacincatly It Is .tzed to m within a standard 5 to 5 12 <br />m or courie. To confirm Out the Comp Mount will match your roof, meas,08 the <br />courge exposure of yot, roof. The ·exposed- Iurtace course 1,04ht should Ineastie <br />no more than 5 34'. If n turns out the roof tlles are o nonitandard stze greater <br />than 5 3/41 me altern,Uve method 1* to use a Quick MOL,1 Stake Mouri <br />kim:ead. In this case, bilow the directions for tho Quick Mount <br />Shake Mod (See Compodon Mot.rd Ir=tructional <br />Video al quickmot„tpv.con/tech.php, Cheri --==0e- <br />Sha,Ce'"pol-VWJety. LM <br />High Definltion Comp- Presidential <br />trregidal surtace - 11 tho penetration lands Ina low between t .0 highs, It 19 be,t to ohtm <br />the low tr*der the nashing •,th extra asphalt b Imvel OL, the surtace. <br />trr,glt' tooth pattem- If the *1*·*s have a tooth pattern wherein the bottom edge <br />Jogs up and down to give It a higher prome look, It h Important to undermand that the <br />exce# shingle that h-gs lower thantho res,ofthe slingle 1, for loolm oNy. The 5· rule <br />starts altha top of the tooth. Ifitooth Interfere, with the mowlt block, cl¢the tooth of'L <br />=U <br />...1. 0 <br />How Many Mounts Per Module? <br />There gre two quettion: that mull bo ank,d when Iddlng unythir, to u roof. <br />1. Cantheroof/building / Roundition handle the additional load? <br />2. What 13 lo keep the new load nom blowlf, away? <br />1! li assumed that e 11©ensed solar Ini:aler can answer e,ese questtons. If he / she <br />cant he/shewlneedtomdeornebodythatcan. Al©emedegheertioheeaslest <br />Ilas Idl. Many varblcs mus bo el,ilidefu and -mo mmplate tl <br />calculation. Thespad, between mozlts hasthe v,rtable, ot strwuth of rail, ditEnce <br />betveen parole! raii cantilever of modi„ over ralb, pull out Crength of mo slope <br />of roof, height of roof, ¥And zone, roof type. ductural knegrety Of mof frarrmg, cte. TIle <br />-I·YOUWiln <br />priect .. . . <br />Further Resources <br />In the proces, of d the research I. him done, we came up with what we -0 the <br />-,eel of Accourtabir,!f. It l" gmphicillook at the many officlai enities t:al govern <br />how waterproollng Iholdd be dore. Al ou web eite you can dickoniny wedge of the <br />Please don't helitite to use d to your edvarge. And of coue if you have any feed <br />back p,0 or con, let u. have it Thke photos of your jobs u.4 Ch"* Mount P,oducts <br />and ktmU them to us at Inlo@quiclanouritpv.com, we'l pd thern W in our web galery. <br />FU Photo Galery Inthe Stdlect Hne. <br />Product Includes <br />Each box Mitudes an necessary m-Ino hardware, moult,wlth IlashIng, <br />and wmen Instructions <br />Alternative Attachment Methods <br />The Composmon Mourt 18 trgended to be attached Irto e tim ber later. <br />Mo„# /re usua/y laid od based on the locaton of the raton. In some <br />cales it h desired lo place a mourd where there h no r•ter. tnthlscase 11 <br />is po=Ibleto place a blockbet-nranets, then bg bto 8,8 block. In Ihe <br />calo of metal raftero, turrber bloclag the rafters il a *ok*lon, b.1 should <br />be done per the buidine enghee, 01 recold. <br />Shared Rail & 5' Rule <br />Or a st=rud rm@ 6,1:Im, where 0- Inour mu,t be b I mid *01, a 11 <br />Irnportar to make stre he unn Is nashed properly. Normaly the vertical <br />placement b guided by the exposed frol edge of the shlnete. 12 (en a 5• <br />expostre comp) the Itashir, 11 flmh /0 thia, then you have 9 of flasht,e <br />over courie 1,5 of flashing undercot- 2,end 2 of M=hingunder cot- <br />4 2 and a Th!: 18 k:lportard because If there 18 a ve:tlcal Joint In cou rse 2 <br />0 1 .. .1.-/- 1 . . <br />courle 1 Whenthe MashN must be shmed b catcha Ihared rail, R / ad· <br />viled to shin the mourt up the roofordy, leaving len fahlr, over course <br />1. and mom Mashir, under colige 3. Il it h noce=ry to shlft dowinvard, <br />It Is advised to move down a whole courle and ther, shot up accordingly. <br />Sealants <br />It le *rvotantto> pa a compatNe scalard Into any and d hole, drmed Into <br />a roof. Most roof# frunuhdires 111 i qgested, approved siabird In <br />their specincation, in the treeze·thaw zones, it h importar¢ to follow the <br />I•nutict.Ners' rules for freezo·thaw conditions. Use the properly rated <br />eeitard tr each specme app[Ication Ind condRIon. Some that may be <br />more appropriate lor ./phatfoofr,po,Rion roofs inch,de Gloce, 2300 and <br />Chemlilk 1.*-1 bd be min to do yop own remearch to confrm, con,t <br />ble and appropriate scalart wah the materials you are val,brle wlh. <br />_ 1 Code / 5,•le1 - /1 <br />=11CE- U-n) EZ- g79.==1 OSHA <br />bw.... <br />Code <br />Card <br />t=:= 45, <br />*P UL <br />2014 <br />. I.