Laserfiche WebLink
CITY OF SANTA ANA <br />Planning and Building Agency <br />Rooftop Loading Comparison <br />PROJECTr <br />r <br />USID <br />253185 <br />FA Number <br />12844672 <br />Site Name <br />BUDGET INN HOTEL <br />KH Project # <br />KHCLE-80917 <br />PREVIOUS ANALYSIS <br />Equipment <br />DEAD LOADS (2021DESIGN) <br />I quantity I Unit Weight (Ibs) <br />I Total Weight (Ins) <br />Antenna (Generic) <br />1 9 1 68 <br />612 <br />DC Unit <br />1 2 34.9 <br />69.8 <br />Radio (Generic) <br />1 36 72 <br />2592 <br />Total Appurtenance Weight (Ibs) <br />3274 <br />+ <br />PROPOSED <br />Equipment <br />REMAINING <br />Quantity <br />DEAD LOADS <br />Unit Weight (Ibs) <br />Total Weight (Ibs) <br />RRUS-8843 62/1366A <br />3 <br />75 <br />225 <br />RRUS-4449 65/612 <br />3 <br />73 <br />219 <br />RRUS-4478 B14 <br />3 <br />59.4 <br />178.2 <br />RRUS-E2 B29 <br />3 <br />52.9 <br />158.7 <br />RRUS-4415 B30 <br />3 <br />47.4 <br />142.2 <br />DC Unit <br />3 <br />34.9 <br />104.7 <br />Commscope NNH4-65A-R6H4 <br />3 <br />86.5 <br />259.5 <br />Ericsson AIR6472 B77G/B77M <br />3 <br />67.1 <br />201.3 <br />Quintel QS4658-3E <br />3 <br />67.9 <br />203.7 <br />Quintel4658-7 <br />3 <br />68 <br />204 <br />Total Appurtenance Weight (Ibs) <br />1896 <br />Proposed Equipment <br />SUMMARY <br />DEAD LOAD <br />Previous SA Dead Load <br />3274 <br />Proposed+Existing Dead Load <br />1896 <br />Percent Increase <br />1 -42.1% <br />Note: Equipment is fully shielded by existing concealment structure; <br />therefore, there is negligible change in lateral wind loading. <br />Seismic loading directly correlates to dead load; therefore, there is a <br />similar percent increase in lateral and vertical seismic loading. <br />Kiml <br />Approved <br />OW*n ISSUANCE <br />Master ID: <br />Date: <br />