My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10179726_2800 N. MAIN 704 - Plan (2)
PBA
>
Building
>
Plans
>
M
>
Main St
>
2800 N Main St Unit# 704
>
10179726_2800 N. MAIN 704 - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2021 11:51:22 AM
Creation date
10/25/2020 9:45:34 PM
Metadata
Fields
Template:
Plan
Permit Number
10179726
Full Address
2800 N Main St Unit# 704
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 80 <br />Planning & Building Agency <br />Building and Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www. santa-ana.orq <br />ELECTRICAL SIGN <br />REQUIREMENTS <br />8*-4-'failyt¢€Zitta2:%:LA,35.29, t.i,r.j#234#bl.':,2%.A;:3.TEL,.'"·A?:49*21,1- 12.21244-k#,P€*< 1+3211'ASWMe,ti-te#Niy,9 2f#32?212. Fi/;i<a -c·4%/,5Vab€5-:A.e,L'i?V*,'1401 <br />Code references are to the 2010 California Electrical Code (CEC) <br />All signs require Planning Department approval. <br />All electrical signs require electric plancheck and permit. <br />1. Manufacturer's instructions are required at the time of submittal <br />C-11: 3-21-2011 <br />2. Submit detailed installation instructions including diagrams to the Building Department <br />for plan review at the time of submittal. Plans must include appropriate items noted by <br />this bulletin. <br />3. Cash or surety bond in the amount of $200.00 is required at time of issuance for each <br />address. The cash or surety bond will be refunded after all required finals. <br />A building permit is also required - except for open or highlight neon lighting. <br />Installation Requirements: <br />CONTACT FIELD INSPECTOR PRIOR TO SIGN INSTALLATION. <br />(SEE SECTION G OF THIS BULLETIN) <br />1. Conductors and equipment shall comply with California Electric Code Article 600. <br />2. All metal parts of a sign shall be bonded in the manner specified in Article 250. Isolated <br />metal parts are permitted to be bonded by using an external green insulated conductor. <br />Equipment grounding & bonding conductors must be sized by 110.26 and protected from <br />physical damage. Minimum size is 14 AWG. CEC 600.7 <br />3. A listed disconnect switch in the power supply primary, shall be installed within sight of <br />sign or have permanently installed means for locking in an "OFF" position. This is also <br />true for a transformer enclosure. CEC 600.6 <br />4. A listed receptacle or an approved termination device shall be used for each neon <br />electrode. To relieve stress at terminations, tubing shall be supported with listed tube <br />supports in an approved manner within six inches·of electrode connection. <br />CEC 600.41 & 600.42 <br />5. Every electric sign of any type shall be listed by an approved testing laboratory and shall <br />be installed in conformance with this listing. That includes "1 of x", "2 of x" labeling for <br />each separate unit of a multi-unit sign. CEC 600.3 <br />6. All "can" letters and transformers housings shall have section labels that are readily <br />visible after installation. CEC 600.4 <br />7. Transformers shall be located where accessible and be securely fastened in place. <br />Page 1 of 2 <br />O 0 <br />m P <br />5
The URL can be used to link to this page
Your browser does not support the video tag.