Laserfiche WebLink
*-SNTA <br />NAJhffi <br />I <br />Planning & Building Agency <br />Building Safety oivision <br />20 Civic Center Plaza <br />P.O. Box '1988 (M-'19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />soL-0r c3c 2c rl <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11 ' x 17" size. lf answerinq NO to an v of the ouestions. olan chec k shall be required. <br />Vc.n"e S",Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO,4J <br />z. VJ <br />tr <br />e ]o.4 q)-7ol <br />C\ <br />3 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum betlveen <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including prolect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />4gtr <br />5 Ertr <br />6 EI-tr <br />?wa <br />8wJ <br />e Ertr <br />10 Va <br />Phone Number: <br />Email Address: <br />q 5t- <br />I certify under pen of pe jury under the laws of t <br />Print Name <br />California that the above is true:r,15 <br />State of <br />ignatu re <br />Dateqc <br />Rev 1 1/19/2015 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />I