My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10179928_2505 N. DEODAR - Plan (2)
PBA
>
Building
>
Plans
>
D
>
Deodar St
>
2505 N Deodar St
>
10179928_2505 N. DEODAR - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 8:34:20 AM
Creation date
10/25/2020 9:46:08 PM
Metadata
Fields
Template:
Plan
Permit Number
10179928
Full Address
2505 N Deodar St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5Y5 I tIVI UVERVIEW <br />Lay in equipment ground conductor and <br />torque bolt to 7 ft-lbs / 10 N-m. <br />Use one WEEB-Lug-8.2 assembly per rail to <br />connect system to equipment ground conductor. <br />Torque fastner to 12 ft-lbs / 16.3 N-m. <br />Use WEEB-OCR to bond <br />solar modules to module mounting rail. <br />Torque fastner to 12 ft-lbs / 16.3 N-m. <br />Important notes: <br />1. These installation instructions are identical for both landscape and portrait oriented PV <br />modules. Refer to module's installation instructions for clamping recommendations. <br />2. Use general purpose anti-seize compound on fastener threads when installing WEEBs. <br />3. The NEC section 690.43 states · Exposed non-current carrying metal parts of module <br />frames, equipment, and conductor enclosures shall be grounded in accordance with <br />250.134 or 250.136(A) regardless of voltage·: <br />4. WEEBs are intended for SINGLE USE ONLY. Functionality will not be guaranteed if reused. <br />1 . 11 1 Al 1 £1. ..1 01.......Document Number 104-0404-000095-000
The URL can be used to link to this page
Your browser does not support the video tag.