My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20165051 - Permit
PBA
>
Building
>
Permits
>
O
>
Oakfield Ave
>
4909 W Oakfield Ave
>
20165051 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 8:08:23 AM
Creation date
8/3/2021 8:08:21 AM
Metadata
Fields
Template:
Permit
Permit Number
20165051
Full Address
4909 W Oakfield Ave
Permit ID
237891
Master ID Number
2018-141059
Project Name
Miscellaneous Counter1 Permit
Street Number
004909
Street Direction
W
Street Name
Oakfield
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/24/2018
Issued Date
1/24/2018
Finalized Date
3/13/2018
Flood Zone
A-0602320143J
Description of Work
Installation of roof mounted PV system. 14 panels, 4.55kw. Worksheet attached to plans. All fees paid on #10195369
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Show annotations
View images
View plain text
EXPEDITED PTRMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations <br />are simple. needing only a basic review and when an installation is more complex. lt is likely that 5O%-75% of all residential <br />systems will comply with these simple criteria. For projects rhat fail to meet the simple criteria. resolution steps have been <br />suggested to provide as a parh to permit approval. <br />Required lt{ormation for Permit: <br />1. Site plan showing location of major components on the property. This drawing need not be exactly to scale. but it <br />should represent relative loca(ion of componenls at site (see supplied example site plan). PV arrays on dwellings <br />with a f perimeter space at ridge and sides may not need separate frre service review. <br />2. Electrical diagram showing PV array connguration, wiring system, overcurrent protection, invertet disconnects. <br />required signs. and ac connection to building (see supplied standard electrical diagram). <br />3. Specihcation sheets and installation manuals (iI available) for all manufactured components including, but not <br />limited to. PV modules. inverter(s), combiner box, disconnects, and mounring system. <br />Step 1 : Structural Review of PV Array Mounting System <br />ls the array to be mounted on a defrned, permitted roof structure?Yes E no <br />I No due to non-compliant rot{ or a grourul mount, submit completed worksheet lor the structure WKSI <br />Roof InJoftnotion: <br />l ls the roohng type lightweight (Yes = composition. lightweight masonry, meEl. etc...)YES <br />ry No. submit completed worksheet for roof sffucture WI(SI (No = heavy masonry, slate. etc. . .) <br />2. Does the roof have a single roof coveringZ ElVes Ino <br />If No, submit completed worksheet ror roof sffucture wKSl . <br />3 Prov,de method and rype of wearherproohng roof penetrations (e.g. flashing. caulk)Flashing, geocell sealant <br />M ount ing Sy st en I nIorfi at i on : <br />I Is the mountinq structure an engrneered producl desrqned to r'nount PV modules wrth no more than an I8" gap <br />benearh lhe mJdule frames? EIv". E r.io <br />If No, provide detaik of sffuctural attachment certifed by a design proJessional. <br />2 For manufactured mounting systems. nll out information on the mounting system below <br />a. Mounting Sy srem Manufacturer ZeP roducr Name and 11466g1X Comp V4 w Flashing-lnsert <br />b Total Werg ht of PV Modules 3n6 P1115 741 lbs <br />c Total Number of Attachment Point 21 <br />d weighr per Attachment Point (b .- c) 35.29 lbs (ii greater than 45 lbs. see wKS I ) <br />e Maximum Spacing Between Attachment Points on a Rail 48 inches (see product manual For <br />maximum spacing allowed based on maximum design wind speed) <br />f. Total Surface Area of PV Modules (square feet)257 <br />g. Distributed Weight of PV Module on Roof (b -i' l)3.0 lbs/ftl <br />Il distributed weight oJ the PV system ts greater than 5 lbstf , see WKSI. <br />Step 2: Electrical Review o[ PV System (Calculations lor Eleckical Diagram) <br />ln order for a PV system to be considered for an expedited permit pmcess, the following must apply: <br />I PV modules. utility-interactive inverters. and combiner boxes are identihed for use in PV systems. <br />2. The Pv array is composed of 4 series strings or less per inverter. <br />3. The total invefler capacity has a conrinuous ac power ourput 13.440 Watts or less <br />4. The ac interconnect,on point is on the load side of service disconnecting means (690.64(8)). <br />5. One of the standard electrical diagrams (El.l, El.la. El.lb, or El.lc) can be used ro accurately represent the PV <br />system. lnreractive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicanf <br />understand each blank to jU in. If the electrical system is more complex than the standard electrical diagram can elJectively <br />communicdte. provide an alternative diagram with appropriate detail. <br />2 EXPEDITED IERMIT PROCESS FOR PV SYSTEMS
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).