Laserfiche WebLink
,-,,SANTA <br />NAIHffi <br />Planning & Buildin$ Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />sol,01 c8c 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contractor's <br />ltcenstng information and answer questions '1 -10 below. Complete and sign the certification section <br />'.lf answering NO to any of the questions, plan check shall be requi.ed." <br />Proj ect AddreSS: 280e NORTT{ Ot.IYL LANL.SANIA ANA,(iA e2706 <br />Contractor Company Name: suNLUx <br />Contractor License Number: jl008l7.l (C.10) <br />NO <br />tr <br />YES Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the ptane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to lO" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition of "Guideline for Fire Safety Elements of Solar Photovoltalc Sysfems" <br />by OCFA? (Guideline available on the OCFA website: htto //www.ocfa.oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ot 2-112 tncn lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />2 <br />3 <br />4 <br />5 <br />trtrtrtr <br />trtr <br />trtr <br />tr <br />tr <br />tr <br />tr <br />8E <br />9E <br />10 El <br />6 <br />7 <br />trtr <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print name Karissa Munoz Srgnature Kdr;rz7?L-rz"a< <br />phone Number: 909-214-3929 Oate 1112120'18 <br />EmailAddress operations@sunlux.com <br />Re\r 211712015 <br />a