Laserfiche WebLink
soL-01 cBC 2013 <br />RESIDENTU\L <br />PHOTOVOLTAIC <br />CHECKLIST <br />YEs t{o Are the following +pli.-*.le b tfie proposGd project? <br />tr tr Will the PV array be flush mounled to the existing roof so that the plane of the <br />modules (panels) are parallel to lhe plane of lhe roof? <br />tr Will the PV system weigh maximum 3 pounds per square feet or less? <br />tr Will lhe PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />tr Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />Solr Photovoltdc (PV) Cheddist for Detacfted Slt{GLE FAI\i ILY RESDENGES Only <br />hstuc'lions: The licensed contractor of record shall fill in the address of the project, contractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification seclion**lf arsrcring i.() to any of the questions, plar crrec* shdl be required.* <br />Project Address: 316 EAST PON,IONA STREET SANTA AN A,. CA 92707 <br />Contractor Coqpany l{aIE RoCK MoUN.I.AIN I-,I-EC.].RIC <br />Cont'actor License l,fun$er tl00lJ9l2 (C l(ll <br />I certify under penaltSt of perjury under the lalr\is of the State of Cal a that lfie *ove is bue: <br />Prinr name: Fran YflOfAflls zz3- zsq b Date <br />fra-n@knosolor .(o/,4 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />the underside of modules and the surface of the roof? <br />tr Will lhe PV system be installed without using any ballast system or counter-weight <br />tr Do the plans show a minimum ot 2-112 tnch lag screw embedment into roof rafters? <br />system? <br />tr Will the PV system be installed on a roof having only one rooling layer with no <br />overlays? <br />D Will the PV system layoul provide a three-foot wide clear access pathway per the <br />latest edition ol "Guideline for Fire Safety Elemenls of Solar Pholovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: htto://www.ocfa.orq) <br />tr Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />)i <br />q <br />8.8 <br />e. El <br />10. El tr Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Phone Number <br />Email Address: <br />Rev 211712015 <br />*-SNTA <br />NA-ffi <br />x <br />x <br />Platning & BJildng dgen"y <br />Building Sdety Division <br />20 CMc Cenbr Plza <br />P.O. Box '1988 (ltiLlg) <br />Sanb Ana, CA f02 <br />c7t4) 647-s8q) <br />r,wrr\,\r.satta-!a.org <br />1. <br />Signature: