Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />sol 01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answeranq NO to anv of the questions, plan check shall be required. <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO1 EID <br />2 EItr <br />3 Eitr <br />6 Etr <br />7 Eltr <br />8 Etr <br />9 Etr <br />10 EIE <br />lolo lr,+y( z rlf,SI <br />S...r <br />4 Eltrtrtr <br />7 <br />Are the following applicable to the proposed project? <br />Wll the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system weigh maximum 4 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-112 inch <br />embedment into roof raflers (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify und <br />Print Name: <br />Phone Number: 1W. qb0.3'/ <br />of perjury under the laws of the State of Califo <br />A4itA A$roD <br />er,penetyta Signature <br />Date: <br />L. <br />Rev:8/1712015 <br />ol <br />93 <br />Q-9On <br />t,( .r( <br />above is true: <br />Email Address <br />*-SANTA <br />ANA-'ffi <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />aau