Laserfiche WebLink
10/09/2013 <br />4 12/05/26'13 4 MCPeras, Farel 4.0 kWDC PHOTOVOLTAIC SYSTEM Revisions By <br />12/05/2013 MC <br />12/050013 &MC <br />SHEET INDEX <br />SHEET No.DESCRIPTION <br />T-01 TITLE PAGE <br />PV-01 SITE PLAN <br />PV-02 ELECTRICAL <br />SINGLE LINE/ <br />PLACARDS / WIRE <br />AND CONDIUT <br />CHART <br />PV-03 MOUNTING DETAIL <br />CUSTOMER INFO: <br />NAME:Peras, Farel <br />ADDRESS:618 N MANTLE LN <br />CITY:SANTA ANA, CA. 92701 <br />PHONE:(714) 504-1023 <br />APN:40019119 <br />JURISDICTION:CITY OF SANTA ANA <br />COMPANY: <br />NAME:HELIOPOWER INC. <br />ADDRESS:25767 JEFFERSON AVE. <br />CITY:MURRIETA, CA 92562 <br />PHONE:951-677-7755 <br />FAX:951-677-9559 <br />CONTRACTOR 915598 CLASS C-46 VICINITY MAPNTS <br />LlC#: <br />CONSTRUCTION NOTES: <br />1. Key Manufacturers are: <br />- Inverter, Enphase Energy <br />1420 N. McDowell Blvd <br />Petaluma, CA 95051 <br />- Panels, ET Solar <br />4900 Hopyard Rd, suite 290 <br />Pleasanton, CA 94588 <br />- Racking, Snap N Rack <br />775 Fiero Ln, Suite 200 <br />San Luis Obispo, CA 93401 <br />- Solar PV System to be installed on a residential structure 2 story tall, <br />with 2X6 24" O.C. trusses. <br />- All components are UL listed and CEC certified, where warranted. <br />- The solar PV system will be installed in accordance with Article 690 of the 2010 <br />NEC based on 2008 NEC and the 2010 CEC- 2010 CBC. <br />APPLICABLE CODES: <br />-2010 California Building Code. <br />-2010 California Residential Code. <br />-2010 California Electrical Code. <br />- A ladder shall be in place for inspection in compliance with CAL-OSHA <br />regulations. <br />- This system is an utility interactive system with no storage batteries. <br />- The Solar PV installation shall not obstruct any plumbing, mechanical, or <br />building roof vents. <br />I Cabrillo Park <br />Z Mat point _.c.. <br />Tennis Academy f·*Q dwiIg:al Cabrillo - ts """'- Ladell Cir <br />C <br />0 <br />-10 <br />-i---E.6th St- <br />1700 f <br />t- Erniraid Pacific 1 t <br />Park C t Pl„ <br />1 <br />%t <br />lenee Alpert * <br />'sychologist = <br />>5 <br />:@ 1% 4 <br />25&% <br />A A > <br />ms **% <br />64 2 m B W <br />di. Iii i <br />UD <br />ry.--- J 1.--- <br />ARCH *URAL <br />ACCEf !FOR C <br />SERAmh/TO'4RMITS A <br />:TRICACM.,R't,9!NG • <br />set of planCY'.4 ·.Bocificata I times a!¥Itult, untanifu-trations,pr}'BREg, 2 ihout w <br />be an ap= <br />f Ordinan <br />Cconle @7 -------- <br />Oma CITY OF S <br /> FRONT VIEW 1 2*51 <br />NTS r - C:y'l='-'S----cz:42 <br />0- <br />- A grounding electrode system in accordance with NEC 690-47 and 250-50 -A DC disconnecting means shall be installed at a readily accessible <br />through 60 and 250-166 shall be provided. Per NEC, grounding electrode location either outside of a building or structure or inside nearest the point of <br />system of existing building may be used and bonded to at the service entrance.entrance of the system conductors as per section 690-14 of the CEC. <br />If existing system is inaccessible or inadequate or is only metallic water piping, -Height of Integrated AC/DC Disconnect shall not Exceed 6'-7" per NEC 240.24 ON <br />Z N Oa supplemental grounding electrode will be used at the inverter location -The Grounding Electrode Conductor shall be protected from physical damage -i _J 8 -- (3) -26 <br />consisting of a UL listed 8 ft ground rod with acorn clamp. Grounding electrode between the grounding electrode and the panel (or inverter) if smaller than #6 LU U.1 2% P <br />conductors shall be no less than #8AWG and no greater than #6AWG copper and copper wire per NEC 250.64B. The Grounding Electrode Conductor will be M IJ 4 M co <br />bonded to the existing grounding electrode to provide for a complete system. continuous, exceptfor sellfes, oints at busbars willin listed equipment per '. g· g- Each module will be grounded using the supplied connections points identified NEC 250.64C. FIKs n O cd % IC W6 <br />on the module and the manufacturer's installation instructions. -Photovoltaic mol!,st**to be.agnsidered non-comlmstible.<v.M- Exposed non-current carrying metal parts of module frames, equipments, and -<C==Z-====4 1 8 <br />conductor enclosures shall be grounded in accordance with 250.134 or 250.136 0 8 <br />(A) regardless of voltage.Z W U.1 39 O 1 go O g £¤ZO <br />-SCE will be notified prior to use and activation of any solar installation. System Q O * 0@ 2 -<I <br />will be commissioned by owner per utility interconnection agreement.IU 22 cr mow m <do 0 0-B <br />Z <br />- Proper access and working clearance around existing and proposed electrical 0- >5 - CK 0 91-.equipment will be provided as per section 110.26 CEC.n 0 C X W 9 <br />LU h E (3up.we opulupe||CZ:l::toi:;i= 2notrrne color 3 .l ,Of <br />approved method. If exposed to sunlight, it shall be UV resistant.146 m ECEIV]V <br />- Where metallic conduit containing DC conductors is used inside the building, it EL 22 92 <br />shall be identified as "Caution: High Voltage DC Circuit" every 5 feet.4 a r- All plaques and signage reg. by 2010 CEC will be installed as reg. <br />216.007 -0 <br />DEC 1 0 2013 Tme TITLE PAGE <br />-Signage and Labeling Specifications shall be: Red background with white O Project Number:lettering, 3/8" letter heights, all capital letters, Arial or similar font, weather = ct fli g C#kef*&34,resistant material (i.e. engraved plastic).ill LL - ··r Sheet:5 W 00 W . -T-01 Qd < 43 2 1-. 01 . 1- C U 02 -10 4 LUD UJ -%ii 0 1 + LILI Z Drulco <br />0 <br />orte <br />0 fl <br />Paper size V <br />B <br />' .-·,TCH - E PLANS <br />Scale <br />D NTS <br />Drawn by <br />MC <br />33 9 <br />0 <br />00