Laserfiche WebLink
-,-SANTA <br />NA-,ffii <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, C492702 <br />(714) 647-5800 <br />www.santa-ana,org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed conlractor of record shall fill in the address of the project, contraclor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section.**lf answering NO to any of the questions, plan check shall be required.** <br />Project Address:strthM7'{1 <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO <br />$r tc, <br />1 <br />2 <br />3 <br />trF <br />tr <br />tr <br />E <br />P <br />8 EEIe.,aE <br />10. EI E <br />Are the following applicable to the proposed project? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV syslem be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition of "Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: htto://www.ocfa.oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112inch lag screw embedment into roof rafters? <br />Are ALL the struclural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including pro.iect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />4 EEI <br />5 gfl <br />6 Ptr <br />? Etr <br />I certify un <br />Print name <br />Phone Number '2^ <br />Email Address: 5 ( <br />der penalty of rjury under the laws of the State of California that the above is true: <br />rn( <br />Signature: <br />Date:1 <br />Rev:211712015 <br />0 3r