My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
423 S Center St - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Center St
>
423 S Center St
>
423 S Center St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/25/2025 5:00:13 AM
Creation date
12/25/2025 5:00:08 AM
Metadata
Fields
Template:
Plan
Permit Number
101124253
Full Address
423 S Center St
Street Number
423
Street Direction
S
Street Name
Center
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FRAMING SCHEDULE <br />PAD SCHEDULE <br />PAD <br />2'-0" SQ. X 24" DEEP PAD W/ (3) #4 E.W. <br />SYM. <br />F2.0 <br />2'-6" SQ. X 24" DEEP PAD W/ (3) #4 E.W. <br />3'-0" SQ. X 24" DEEP PAD W/ (3) #4 E.W. <br />F2.5 <br />F3.0 <br />LEGEND <br />3'-6" SQ. X 24" DEEP PAD W/ (3) #4 E.W.F3.5 <br />DESCRIPTIONSYM. <br />F2.0 <br />POST OR TRIMMER AS NOTED <br />SDX <br />X <br />PAD NUMBER <br />DETAIL NUMBER <br />DETAIL SHEET NUMBER <br />DROP IN SLAB (VERIFY PRIOR TO <br />CONSTRUCTION) <br />SHEAR PANEL LENGTH AND NUMBER, STRAP & POST EACH THE END <br />SHEARWALL PER SHCEDULE & PLAN. <br />REFER TO SD-0 FOR PANEL TYPE, MIN. 2-2x4 @ EA. END. <br />INDICATES ROOF TRUSSES BY <br />TRUSS SUPPLIER <br />INDICATES FLOOR JOISTS BY JOIST SUPPLIER,OR U.N.O PER SCHEDULE & <br />PLAN <br />INDICATES DECK JOIST OR ROOF RAFTER PER SCHEDULE & PLAN <br />X BEAM NUMBER, REFER TO REPORT <br />CALCULATIONS <br />KEY NOTE NUMBER <br />BEARING WALL <br />CALIFORNIA FRAMING <br />XX <br />GREATE BEAM @ FOUNDATION SEE PLAN FOR SIZE <br />KEY NOTES <br />FJ <br />RR <br />RT <br />X NUMBER OF ANCHOR BOLTS <br />LINE OF 2X FLAT BLOCKING W/ EDGE NAIL. & CONTINUOUS CS16 STRAP OVER U.N.O. <br />SEE PLAN FOR NUMBER OF BAYS. <br />BLOCKED FLOOR DIAPHRAGM W/ 10d's @ 4" O.C. B.N., 4" O.C. E.N. & 12" O.C. FIELD. <br />BLOCKED ROOF DIAPHRAGM W/ 8d's @ 4" O.C. B.N., 4" O.C. E.N. & 12" O.C. FIELD. <br />PROVIDE SOLID BLOCKING <br />TRUSS HANGER BY TRUSS SUPPLIER <br />CONTINUOUS FULL HT. BLKG. W/E.N. SEE PLANS FOR NUMBER OF BAYS ( U.N.O.) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />EXISTING SLAB & FOOTING <br />INDICATES CEILING JOIST PER SCHEDULE & PLANCJ <br />NEW FOOTING <br />SYMBOL SIZE MAX. SPACING U.N.O <br />RR 2X6 RR 16" O.C. <br />4'-0" SQ. X 24" DEEP PAD W/ (3) #4 E.W.F4.0 <br />4'-6" SQ. X 24" DEEP PAD W/ (3) #4 E.W.F4.5 <br />NEW SLAB <br />CONSTRUCTION NOTES <br />1.REFER TO STRUCTURAL GENERAL NOTES AND DETAIL SHEETS (S0.0 & S0.1) FOR <br />MORE INFORMATION. <br />2.CONTRACTOR IS RESPONSIBLE FOR VERIFYING PREFABRICATED SHEAR WALLS <br />AND MATCH TOP PLATE HEIGHT AND WALL WIDTH AND NOTIFY ENGINEER OF <br />RECORD IF DIFFERENT THAN PLANS. <br />3.AS AN ALTERNATE TO USING SIMPSON PRODUCTS OTHER CONNECTORS CAN BE <br />USED, AS LONG AS THEIR CAPACITIES ARE EQUAL TO OR BETTER THAN <br />SIMPSON'S. <br />4.USE SIMPSON " IUS " HANGERS FOR CONNECTION OF I-JOISTS TO OTHER <br />FRAMING MEMBERS (U.N.O.) AND " LUS " HANGERS FOR CONNECTION OF SOLID <br />JOISTS. <br />5.USE ST6224 STRAP FOR THE TOP PLATES SPLICE AT ROOF FRAMING LEVELS <br />(5B/SD2.0), UNO ON PLANS. <br />6.USE ST22 STRAP FOR LEDGER SPLICES, UNO. <br />7.USE (1)CS16 X 3'-0" STRAP AT RIM JOISTS SPLICE, U.N.O ON PLANS. 1¼” MIN. LVL <br />RIM JOISTS SHOULD BE USED AT ALL FLOOR FRAMING EDGES. <br />8.PLYWOOD IS APPLIED ON EITHER SIDE OF SHEAR WALLS <br />9.INTERIOR NON-BEARING WALLS MAY BE FRAMED WITH 2X STUDS AT 24" O.C., <br />MAX. <br />10.HEARDER AT OPENING AT EXTERIOR & INTERIOR BEARING WALL SHOULD BE MIN. <br />4X6 ,U.N.O <br />11.HEADER AT NON-BEARING WALLS, USE 2X4 FOR OPENINGS UP TO 3'-0" MAX., <br />(2)2X4 FOR OPENINGS UP TO 6'-0" MAX., 4X6 FOR OPENINGS UP TO 12'-0" MAX., <br />(UNO). <br />12.2X6 WALL SHOULD BE AT PLUMPING WALL. <br />13.TOTAL MINIMUM NUMBER OF ANCHOR BOLTS. REQUIREMENTS. FOR NON-SHEAR <br />WALLS, MASA/MASAP MUDSILL ANCHORS CAN BE USED IN LIEU OF ANCHOR <br />BOLTS WITH END DISTANCE OF 4" MIN. PER ESR #2555. <br />14.FOUNDATION ANCHOR BOLTS IN CONTACT WITH PRESSURE TREATED SILL PLATE <br />SHALL BE OF HOT DIPPED ZINC-COATED GALVANIZED STEEL, STAINLESS STEEL, <br />SILICON BRONZE OR COPPER. <br />15.SIMPSON ET-3G EPOXY ESR-5334 SPECIAL INSPECTION REQUIRED <br />CJ 2X8 CJ 16" O.C. <br />X <br />X'-X" <br />2 <br />HD <br />U <br />2 <br />2 <br />6'-0" <br />2 <br />HD <br />U <br />2 <br />2 <br />2 <br />6' <br />- <br />0 <br />" <br />HDU2 <br />HDU2 <br />LIVING ITCHEN <br />9' 0" CLG <br />WOOD <br />ADU- BED #1 <br />9' 0" CLG <br />WOOD <br />ADU- BATH#1 <br />9' 0" CLG <br />TILE <br />ADU- BED #2 <br />9' 0" CLG <br />WOOD <br />ADU- BATH#2 <br />9' 0" CLG <br />TILE <br />AD <br />U <br />- <br /> <br />C <br />L <br />O <br />S <br />E <br />T <br />ADU- CLOSET <br />ADU- HALLWA <br />9' 0" CLG <br />WOOD <br />ADU- LAUNDR <br />9' 0" CLG <br />TILE <br />2 <br />2 <br />6' <br />- <br />0 <br />" <br />HDU2 <br />HDU2 <br />2 <br />5'-9"HD <br />U <br />2 <br />HD <br />U <br />2 <br />F2.0 <br />SLAB AREA <br />MIN. 4" THK. CONC. SLAB <br />w/ #4 @ 16" O.C. EA WAY <br />OVER 3" SAND <br />OVER 15 MIL. VAPOR BARRIER <br />OVER 4" AGGREGATES OF 1/2" OR LARGER <br />5 <br />SD1 <br />TYP. <br />1 <br />SD1 <br />2 <br />SD1 <br />1 <br />SD1 <br />2 <br />SD1 <br />1 <br />SD1 <br />2 <br />SD1 <br />1 <br />SD1 <br />2 <br />SD1 <br />5 <br />SD1 <br />5 <br />SD1 <br />5 <br />SD1 <br />3 <br />SD1 <br />TYP. <br />4 <br />SD1 <br />TYP. <br />9 <br />SD1 <br />9 <br />SD1 <br />CB <br />S <br />Q <br />4 <br />4 <br />10 <br />SD1 <br />12" <br />12" <br />12 <br />" <br />12 <br />" <br />12 <br />" <br />12" <br />4X <br />4 <br />4X <br />4 <br />2 <br />6'-0" <br />2 <br />6' <br />- <br />0 <br />" <br />LIVING ITCHEN <br />9' 0" CLG <br />WOOD <br />ADU- BED #1 <br />9' 0" CLG <br />WOOD <br />ADU- BATH#1 <br />9' 0" CLG <br />TILE <br />ADU- BED #2 <br />9' 0" CLG <br />WOOD <br />ADU- BATH#2 <br />9' 0" CLG <br />TILE <br />AD <br />U <br />- <br /> <br />C <br />L <br />O <br />S <br />E <br />T <br />ADU- CLOSET <br />ADU- HALLWA <br />9' 0" CLG <br />WOOD <br />ADU- LAUNDR <br />9' 0" CLG <br />TILE <br />1 2 <br />A <br />B <br />2 <br />6' <br />- <br />0 <br />" <br />4X4 <br />4X4 <br />4X6 <br />2X <br />1 <br />0 <br /> <br />R <br />I <br />D <br />G <br />E <br /> <br />B <br />O <br />A <br />R <br />D <br />4X <br />8 <br />4X8 <br />4X <br />6 <br />4X <br />6 <br />4X64X6 <br />4X <br />6 <br />4X4 <br />4X4 <br />2 <br />5'-9" <br />4X <br />4 <br />4X <br />4 <br />RR RR <br />CJ <br />R1 <br />R2 <br />R1 <br />4X <br />6 <br />CJ <br />4X4 <br />5A <br />SD2 <br />5A <br />SD2 <br />5A <br />SD2 <br />5A <br />SD2 <br />1 <br />2 <br />SD2 <br />1 <br />SD2 <br />1 <br />SD2 <br />8 <br />SD2 <br />8 <br />SD2 <br />8 <br />SD2 <br />TYP. <br />2 <br />SD2 <br />R/R W/E.N. <br />10 <br />S0.1 <br />TYP. <br />7 <br />SD2 <br />W/ST22 <br />12 <br />SD2 11 <br />SD2 <br />W/ECC <br />Q <br />4 <br />4 <br />S <br />D <br />S <br />R/R W/E.N. <br />FOUNDATION PLAN <br />SCALE : 1/4" = 1'-0" <br />©2024Sheet No. <br />Revisions <br />1 <br />25111Project No. <br />Date <br />Design by <br />Hu <br />n <br />t <br />i <br />n <br />g <br />t <br />o <br />n <br /> <br />E <br />x <br />e <br />c <br />u <br />t <br />i <br />v <br />e <br /> <br />P <br />a <br />r <br />k <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />P <br />h <br />o <br />n <br />e <br />: <br /> <br />( <br />7 <br />1 <br />4 <br />) <br /> <br />9 <br />2 <br />8 <br />- <br />2 <br />0 <br />0 <br />6 <br />16 <br />1 <br />6 <br />8 <br /> <br />B <br />e <br />a <br />c <br />h <br /> <br />B <br />l <br />v <br />d <br />, <br /> <br />S <br />t <br />e <br /> <br /># <br /> <br />2 <br />0 <br />1 <br />C <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />W <br />e <br />b <br />s <br />i <br />t <br />e <br />: <br /> <br />H <br />o <br />m <br />e <br />T <br />o <br />p <br />H <br />o <br />m <br />e <br />. <br />c <br />o <br />m <br />Hu <br />n <br />t <br />i <br />n <br />g <br />t <br />o <br />n <br /> <br />B <br />e <br />a <br />c <br />h <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />4 <br />7 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />E <br />m <br />a <br />i <br />l <br />: <br /> <br />i <br />n <br />f <br />o <br />@ <br />H <br />o <br />m <br />e <br />T <br />o <br />p <br />H <br />o <br />m <br />e <br />. <br />c <br />o <br />m <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />f <br />o <br />r <br />: <br />CE <br />N <br />T <br />E <br />R <br /> <br />S <br />T <br />- <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />42 <br />1 <br /> <br />S <br /> <br />C <br />e <br />n <br />t <br />e <br />r <br /> <br />S <br />t <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />C 69546 <br />Exp: 06/30/26 <br />TUNG THANH VO <br />C I V I LSTATE OF CALIFORNIA <br />REGISTERED PROFESSIONAL ENGINEER <br />August 8, 2025 <br />TUNG VO, M.S., P.E. <br />08/06/2025 BLDG CMNT. <br />02-S1.0 <br />FOUNDATION <br />& FRAMING PLAN <br />ROOF FRAMING PLAN <br />SCALE : 1/4" = 1'-0" <br />1
The URL can be used to link to this page
Your browser does not support the video tag.