Laserfiche WebLink
SHEET NAME <br />SHEET SIZE <br />SHEET NUMBER <br />ANSI B <br />11" X 17" <br />Signature with Seal <br />PROJECT NAME & ADDRESS <br />PV-5 <br />AN <br />D <br />Y <br /> <br />M <br />A <br />I <br />18 <br />3 <br />4 <br /> <br />W <br /> <br />3 <br />R <br />D <br /> <br />S <br />T <br />, <br /> # <br />3 <br /> <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br /> <br />PH <br />O <br />N <br />E <br /> <br /># <br />: <br /> <br />N <br />/ <br />A <br />REVDATEDESCRIPTION <br />REVISIONS <br />CONTRACTOR INFORMATION <br />GREEN HILL SOLAR INC <br />7020 MIDDLESBURY RIDGE CIR., <br />WEST HILLS, CA 91307 <br />CSLB 938682, C-46 (Exp 10/31/2025) <br />PHONE: (888) 902-3551 <br />ATTACHMENT <br />DETAIL <br />2 ATTACHMENT DETAIL (enlarged section view) <br />PV-5 SCALE: NTS <br />1 ATTACHMENT DETAIL <br />PV-5 SCALE: NTS <br />SEE (2/PV-5) FOR <br />ENLARGED VIEW <br />PV MODULE <br />(E) SINGLE LAYER OF COMP. SHINGLE <br />2"X6" RAFTERS @ 16" O.C. <br />5/16"x3-1/2" SS LAG SCREW <br />THREADED TOP 1 LAG PER <br />ATTACHMENT 2.5" MIN EMBEDMENT <br />IRONRIDGE SOLAR RACKING <br />UNIVERSAL END CLAMP (OR <br />GROUNDING MID CLAMP) <br />(N) IRONRIDGE XR10 <br />RACKING SYSTEM <br />FLASHING <br />(E) SINGLE LAYER OF COMP. SHINGLE <br />PV MODULE <br />IRONRIDGE FLASHFOOT 2 ATTACHMENT <br />4" <br />2"X6" <br /> RAFTE <br />R <br />S <br /> <br />@ <br /> <br />16" O.C. <br />NOTE: <br />1. PRIOR TO COMMENCEMENT OF WORK, THE <br />CONTRACTOR SHALL VERIFY THE FRAMING SIZES, <br />SPACINGS, AND SPANS NOTED IN THE STAMPED PLANS <br />AND ACCOMPANYING CALCULATIONS AND NOTIFY THE <br />ENGINEER OF RECORD OF ANY DISCREPANCIES PRIOR TO <br />STARTING CONSTRUCTION. <br />2. THESE PLANS ARE STAMPED FOR STRUCTURAL CODE <br />COMPLIANCE OF THE ROOF FRAMING SUPPORTING THE <br />PROPOSED PV INSTALLATION REFERENCED ONLY. THESE <br />PLANS ARE NOT STAMPED FOR WATER LEAKAGE. PV <br />MODULES, RACKING, AND ATTACHMENT COMPONENTS <br />MUST FOLLOW MANUFACTURER GUIDELINES AND <br />REQUIREMENTS. <br />3. PLEASE SEE THE ACCOMPANYING STRUCTURAL <br />CALCULATIONS REPORT FOR DETAILS REGARDING <br />CALCULATIONS AS WELL AS LIMITS OF SCOPE OF WORK <br />AND LIABILITY. <br />LICENSED CONTRACTOR SIGNATURE: <br />Simon Sayag