Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana. CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />soL{1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contractods <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section**lf answering NO to any of the questionsj plan check shall be required.** <br />Proj ect Address: TllZ P' Tit*fv\t"*, C"t't <br />a <br />3 <br />Contractor Company Name: <br />Contractor License Number <br />Eltr <br />7 trtr <br />I certify under <br />Print name <br />Phone Number: <br />Email Address: <br />Hosopo Corp DBA Horizon Solar Power <br />YES NO <br />Eltr <br />trtr <br />Eltr <br />Etr <br />Eltr <br />1004233 <br />Are the following applicable to the proposed project? <br />Will the PV anay be flush mounted to lhe existing roof so that the plane of the <br />modules (panels) are parallel to lhe plane of the roof? <br />Will the PV system weagh maximum 3 pounds per square feet or less? <br />VMll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of lhe roof? <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the PV system be installed on a roof having only one roofing layer wth no <br />overlays? <br />Wll the PV system layout provide a threejoot wde clear access pathway per the <br />latest edition of 'Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: http.i iw!n/v. ocfa. orq) <br />Do the plans show a maximum honzontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />ljcensed professional engineer? (including project speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturefs PV support information.) <br />a yofpe laws of the State of Californ t the above is true: <br />4 <br />5 <br />6 <br />8 Eltre Eltr <br />10 EE <br />,,HM'IP <br />Signature <br />Date: ? <br />Rev Z17ln15 <br />( <br />;-,,SANTA <br />NA-'[Hi <br />1