Laserfiche WebLink
GENERAL REQUIREMENTSSPECIAL INSPECTIONS <br />EXCEPTION: CONCRETE FOOTINGS SUPPORTING WALLS OF LIGHT-FRAME WOOD BUILDING OF <br />3-STORIES OR LESS AND THE STRUCTURAL DESIGN OF FOOTINGS IS <br />BASED ON A SPECIFIED COMPRESSIVE STRENGTH f'c NO GREATER THAN 2500 psi. <br />SPECIAL INSPECTION TABLE FOR CONCRETE <br />CONSTRUCTION <br />SPECIAL INSPECTIONS AND VERIFICATIONS BY A SPECIAL INSPECTOR ARE REQUIRED FOR CONCRETE <br />CONSTRUCTION AND SPECIFIED IN THE FOLLOWING TABLE <br /> 1. Inspect reinforcement, including prestressing <br />tendons, and verify placement <br />PERIODIC <br />SPECIAL <br />INSPECTION <br />CONTINUOUS <br />SPECIAL <br />INSPECTION <br />Reference <br />Standard <br />CBC/IBC <br />ReferenceTYPE <br />2. Reinforcing bar welding: <br /> a. Verify weldability of reinforcing bars other than <br />ASTM A 706; <br />b. Inspect single-pass fillet welds, maximum 5/16"; <br />and <br />c. Inspect all other welds <br /> 3. Inspect anchors cast in concrete. <br /> 4. Inspect anchors post-installed in hardened concrete <br />members. <br />a. Adhesive anchors installed in horizontally or <br />upwardly inclined orientations to resist sustained <br />tension loads. <br />b. Mechanical anchors and adhesive anchors not <br />defined in 4.a. <br /> 5. Verify use of required design mix. <br /> 6. Prior to concrete placement, fabricate specimens <br />for strength tests, perform <br /> slump and air content tests, and determine the <br />temperature of the concrete. <br /> 7. Inspect concrete and shotcrete placement for <br />proper application techniques. <br /> 8. Verify maintenance of specified curing temperature <br />and techniques. <br /> 9. Inspect prestressed concrete for: <br />a. Application of prestressing forces; and <br />b. Grouting of bonded prestressing tendons. <br /> 10. Inspect erection of precast concrete <br />members. <br /> 13. Verify in-situ concrete strength, prior to stressing <br />of tendons in post-tensioned concrete and prior to <br />removal of shores and forms from beams and <br />structural slabs. <br /> 14. Inspect formwork for shape, location and <br />dimensions of the concrete member being formed. <br />ACI 318 <br />Ch. 20,25.2,25.3, <br />26.6.1-26.6.3 <br />AWS D1.4 <br />ACI 318: 26.6.4 <br />ACI 318: 17.8.2 <br />ACI 318: 17.8.2.4 <br />ACI 318: 17.8.2 <br />ACI 318: Ch 19, <br />26.4.3, 26.4.4 <br />ASTM C 172 <br />ASTM C 31 <br />ACI 318: 26.5, 26.12 <br />ACI 318: 26.5 <br />ACI 318: <br />26.5.3-26.5.5 <br />ACI 318: 26.10 <br />ACI 318: 26.9 <br />ACI 318: 26.11.2 <br />ACI 318: <br />26.11.1.2(b) <br />1904.1,1904.2 <br />11. For precast concrete diaphragm connection or <br />reinforcement at joints classified as moderate or <br />high deformability elements (MDE or HDE) in <br />structures assigned to Seismic Design Category <br />C, D, E or F, inspect such connections and <br />reinforcement in the field for: <br /> a. Installation of the embedded parts <br />b. Completion of the continuity of reinforcement <br />across joints. <br />c. Completion on connection in the field. <br /> 12. Inspect Installation tolerances of precast concrete <br />diaphragm connections for compliance with ACI <br />550.5 <br />ACI 318: 26.13.1.3 <br />ACI 550.5 <br />ACI 318: 26.13.1.3 <br />LARR Report list <br />CMST 12 <br />CMST 14 <br />LABC/ICC-ESR 2105 <br />CS 14 <br />CS 16 <br />CMST 16 <br />ST 6224 <br />ST 6236 <br />MST 48 <br />MST 60 <br />MSTC 52 <br />ST 22 <br />MST 37 <br />HTT 5 <br />HDU 4 <br />HDU 8 <br />HDU 11 <br />HDU 14 <br />HHDQ 11 <br />HHDQ 14 <br />HDQ 8 <br />HD 12 <br />HD 19 <br />MASA/ MASAP <br />SET-XP <br />TITEN HDPARALLAM (PSL) <br />TIMBERSTRAND (LSL) <br />Simpson <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />LABC/ICC-ESR 2105 <br />PDPAWL-MG <br />MPBZ <br />Simpson Strong Wall <br />SSW <br />LABC/IAPMO-ER 130 <br />LABC/ICC-ESR 2330 <br />LABC/ICC-ESR 2330 <br />LABC/ICC-ESR 2330 <br />LABC/ICC-ESR 2330 <br />LABC/ICC-ESR 2330 <br />LABC/ICC-ESR 2330 <br />LABC/ICC-ESR 2330 <br />LABC/IAPMO-UES ER 143 <br />LABC/IAPMO-UES ER 143 <br />LABC/ICC-ESR 2555 <br />LABC/ICC-ESR 2508 <br />LABC/ICC-ESR 2713 <br />LABC/ICC-ESR 1679 <br />LABC/ICC-ESR 1387 <br />LABC/ICC-ESR 2138 <br />LABC/ICC-ESR 3050 <br />HTS22 LABC/ICC-ESR 2105 HDC10 LABC/ICC-ESR 2330 <br />LTP/A35/LS/H2.5 LABC/ICC-ESR 3096 <br />SPECIAL INSPECTION: <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />1. <br />Site visits by the structural engineer do not constitute an inspection. <br />In addition to the regular inspection the following items will also require special inspection in accordance with <br />Sec.1704, unless exempted by the exceptions of Sec.1704.2, of the Building Code <br />Soils compliance prior to the foundation inspection, post-tensioned foundation, high strength steel and concrete. <br />All inspections and tests shall be performed by a qualified testing agency retained by the owner. <br />The special inspector shall be qualified and approved by the building department and acceptable to the architect. <br />The special inspector shall observe work assigned for conformance to the approved design drawings and <br />specifications. <br />The special inspector shall furnish an inspection report to the building department, engineer and architect of record. <br />Copies of the report shall be available at the job site at all times. <br />Final reports for all inspections and testing must be provided by the special inspector. Final reports shall document <br />completion of all inspections and correction of all noted discrepencies. <br />The duties of the special inspector shall be in conformance with the requirements of section 1704 of the latest edition of <br />the CBC/ IBC. <br />Contractor shall be responsible for all expenses due to any premature notification of inspection which results in <br />additional site visits. <br />Failure of notification by the contractor for inspection on a timely basis may result in complete removal and <br />replacement of all work performed at contractors expense. <br />SPECIAL INSPECTION BY A SPECIAL INSPECTOR FOR EXISTING SITE SOIL CONDITIONS, FILL <br />PLACEMENT & LOAD BEARING REQUIREMENTS SHALL BE PERFORMED PER THE FOLLOWING TABLE. <br />SPECIAL INSPECTION TABLE FOR EXISTING SITE SOIL <br />CONDITIONS <br />SPECIAL INSPECTION BY A SPECIAL INSPECTOR FOR THE CONSTRUCTION OF HORIZONTAL WOOD <br />DIAPHRAGMS, WOOD SHEAR WALLS & MANUFACTURED SHEAR WALLS ARE REQUIRED & SPECIFIED IN <br />THE FOLLOWING TABLE: <br />SPECIAL INSPECTION TABLE FOR WOOD DIAPHRAGM & <br />SHEAR WALLS <br />Exception: Special inspection for existing site soil condtions per table below is not required if allowable soil bearing <br />pressure used for design is ≤ 1500 psf, soils report is not required by building offical, and there is no <br />controlled fill placement on existing building site <br />11. <br />INSPECTION <br />TASK Continuous Periodically SECTION <br />Sec. 1705.13.2 <br />Sec. 1705.13.2 <br />Sec. 1704 <br />Sec. 1705.13.2 <br />Sec. 1705.13.3 <br />Horizontal wood <br />diaphragms with edge <br />nail spacing equal to or <br />closer than 4" o.c. <br />Wood shear walls with <br />edge nail spacing equal <br />to or closer than 4" o.c. <br />Sheathing types, grade <br />thickness, span rating, <br />and nail types, nail sizes <br />& spacing. <br />Sheathing types, grade <br />thickness, wall nail types, <br />nailing sizes and <br />spacing. <br />Sill nail types, size and <br />spacing. <br />Anchor bolt sizes & <br />spacing. <br />Holdown types & their <br />connections to shear <br />walls & <br />foundation/framing <br />Wall end post sizes. <br />Shear transfer connector <br />types & spacing. Drag <br />strut connections to <br />shear walls. <br />Panel types, nailing, <br />bolting, Anchoring, wall <br />top plate screw types, <br />sizes & spacing, <br />holddown & drag strut <br />connections to <br />walls/panels. <br />Manufactured shear <br />walls, Hardy panels, <br />Simpson steel & Wood <br />Strong walls. <br />REFERENCE FOR <br />CRITERIA <br />FREQUENCY OF <br />INSPECTIONNOT <br />APPLICABLE CBC/IBC <br />Sec. 1705.5.2 <br />Verify <br />that the installation of <br />the permanent individual <br />truss <br />member restraint/bracing <br />has been installed in <br />accordance <br />with the approved truss <br />submittal package <br />Metal-plate -connected <br />wood trusses with a <br />clear span of 60 feet or <br />greater <br />TYPE <br />1. Verify materials below shallow foundations are <br />adequate to achieve the design bearing <br />capacity per soils report. <br />2. Verify excavations are extended to proper <br />depth & have reached proper material <br />per soils report. <br />3. Perform classification & testing of <br />compacted fill materials per soils report. <br />4. During fill placement, verify use of proper <br />materials and procedures in accordance <br />with the provisions of the approved <br />geotechnical report. Verify densities and <br />lift thicknesses during placement and <br />compaction of compacted fill. <br />5. Prior to placement of compacted fill, <br />inspect subgrade & verify that site has <br />been prepared properly per soils report. <br />Periodic <br />Special Inspection <br />Continuous <br />Special Inspection <br />01/29/2025PC COMMENTS RESPONSE #1 <br />04/17/2025PC COMMENTS RESPONSE #2 <br />VE Revs 10/10/20251 <br />B <br />A <br /> <br />a <br />n <br />d <br /> <br />s <br />h <br />a <br />l <br />l <br /> <br />n <br />o <br />t <br /> <br />b <br />e <br /> <br />r <br />e <br />p <br />r <br />o <br />d <br />u <br />c <br />e <br />d <br /> <br />i <br />n <br /> <br />w <br />h <br />o <br />l <br />e <br /> <br />o <br />r <br /> <br />i <br />n <br /> <br />p <br />a <br />r <br />t <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />p <br />r <br />e <br />s <br />s <br /> <br />p <br />r <br />i <br />o <br />r <br /> <br />w <br />r <br />i <br />t <br />t <br />e <br />n <br /> <br />p <br />e <br />r <br />m <br />i <br />s <br />s <br />i <br />o <br />n <br /> <br />o <br />f <br /> <br />s <br />a <br />i <br />d <br /> <br />e <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />s <br />, <br /> <br />a <br />n <br />y <br /> <br />u <br />n <br />a <br />u <br />t <br />h <br />o <br />r <br />i <br />z <br />e <br />d <br /> <br />r <br />e <br />u <br />s <br />e <br /> <br />o <br />f <br /> <br />t <br />h <br />e <br />s <br />e <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />o <br />t <br />h <br />e <br />r <br /> <br />t <br />h <br />a <br />n <br /> <br />f <br />o <br />r <br /> <br />t <br />h <br />e <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />a <br />n <br />d <br /> <br />l <br />o <br />c <br />a <br />t <br />i <br />o <br />n <br /> <br />s <br />h <br />o <br />w <br />n <br /> <br />i <br />s <br /> <br />p <br />r <br />o <br />h <br />i <br />b <br />i <br />t <br />e <br />d <br />. <br />al <br />l <br /> <br />i <br />d <br />e <br />a <br />s <br />, <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />s <br /> <br />a <br />n <br />d <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />r <br />e <br />p <br />r <br />e <br />s <br />e <br />n <br />t <br />e <br />d <br /> <br />b <br />y <br /> <br />t <br />h <br />i <br />s <br /> <br />d <br />r <br />a <br />w <br />i <br />n <br />g <br /> <br />a <br />r <br />e <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />c <br />l <br />u <br />s <br />i <br />v <br />e <br /> <br />p <br />r <br />o <br />p <br />e <br />r <br />t <br />y <br /> <br />o <br />f <br />Go <br />u <br />v <br />i <br />s <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br />JOB NO. <br />SUBMITTAL <br />DATE <br />SHEET TITLE <br />SHEET NO. <br />CLIENT: <br />REVISION <br />DATE <br />21 <br />3 <br />0 <br /> <br />E <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br /> <br /># <br />2 <br />0 <br />0 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />BSB: MR230056; Gouvis: 66467 <br />1ST PLAN CHECK SUBMITTAL 08/20/2024 <br />2ND PLAN CHECK SUBMITTAL 01/29/2025 <br />3RD P.C. SUBMITTAL <br />04/17/2025 <br />3RD PLAN CHECK SUBMITTAL 04/17/2025 <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />T <br />I <br />A <br />L <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br />21 <br />5 <br />0 <br /> <br />E <br />. <br /> <br />F <br />O <br />U <br />R <br />T <br />H <br /> <br />S <br />T <br />. <br /> <br />& <br /> <br />2 <br />1 <br />6 <br />0 <br /> <br />E <br />. <br /> <br />F <br />O <br />U <br />R <br />T <br />H <br /> <br />S <br />T <br />. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />GENERAL NOTES <br />& REQUIREMENTS <br />SN1.1