Laserfiche WebLink
City of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CAg27o2 Electrical <br />Permit Counter: (714) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853 ffP <br />Permit #: 20{ 7O8OG <br />Pin #: 32908 <br />Project Address: 2029 N Flower St Bldg: <br />Tract 991 <br />Address Range: <br />Historic: Yes <br />Suite Range: <br />Zoning R1Assessor'sParcel: 002-082-25 Lot. POR 7 & POR 8 <br />Joe Weatherly <br />2029 N Flower St <br />Santa Ana, CA 92706 <br />(714) 869-8257 <br />Fee Type <br />01116002 5'1600 General Plan Update <br />01116002 57770 Microfilm Records <br />Amount <br />22.95 <br />3.91 <br />Qt) <br />0.00 <br />0.00 <br />Fee <br />50.00 <br />$0.00 <br />Phone <br />Tenant Name <br />Contractor <br />Address: <br />Semper Solaris <br />1805 John Towers Avenue <br />El Cajon, CA 92020 <br />(619) 715-4054P hone PAID <br />Slale Lic #: 978152 <br />Lic Type: B, C-10, C-39, C46 <br />Bus. Lic #: 365759 <br />Workers' Compensalion lnsurance:Carrier: State Fund <br />Policy #: 90292ts <br />Expires: 1Ol1Ol2O20 <br />JUN I 7 PAIO <br />$anta AnaCitY <br />Building Use: <br />Job Type: <br />Nature of Work <br />Single Family Dwelling <br />Solar <br />Solar <br />Occupancy: <br />Constr Type <br />Code: <br />R.3, U <br />VB <br />cEc 2019 <br />Notes Electrical for- lnstall new panels to existing solar PV <br />system. ALL SOLAR FEES PAID ON 101103'135 <br />Planning Approval By <br />Plan Checked By: <br />Permit lssued By: <br />Subject to Field: <br />Building Permil #: <br />Smith, Mark <br />Verduzco, Violel <br />101103135 <br />o2t20t2020 <br />o6t1712020 <br />Account# <br />Misc. Receipl: <br />Misc. Receipt: <br />Misc. Receipt: <br />Total <br />lnspector MID#: 2020-157769 <br />Fee Total: <br />Paid to Date: <br />Balance Due <br />$0.00 <br />$0.00 <br />$0.00 <br />/ <br />Unit: <br />Block: NA <br />Owner: <br />Address: <br />.l\ <br />Planning Conditions: <br />Date: <br />Date: <br />Dale: <br />Every pomit issued shall become invalid unless the wot* on lhe site <br />authotized by such permit is comnenced within360 days aftet ils <br />issuance, ot if the wo* aulhorized on lhe sile by such pefinit is suspended <br />or abandoned lor d peiod 01360 days attet tha tima the work is <br />commenced