Laserfiche WebLink
ZepSolar ZS COMP I GROUNDING AND BONDING <br />Ground Zep <br />Setscrew <br />, Key side <br />The Ground Zep providesa single point of connection for <br />the Equipment Grounding Conductor (EGC) from the array <br />to a building ground. <br />Ground wire channel <br />Part No. 850-1172 <br />UL Listed to UL 467 and UL 2703 <br />Ground Zep Installation <br />1 <br />29 <br />IiI-3 <br />Insert Ground Zep into Zep Groove of module frame, <br />on arrayperimeter <br />Use the Flat Too to rotate the Ground Zep 90 degrees, so that set screw <br />is pointing straight up. <br />Insert copper EGC into ground wire <br />channel. Tighten set screw using torque <br />values shown in the ZS Comp Instatta- <br />tion Manual. <br />Bonding Path - Array to Ground <br />Ground Zep <br />. Equipment Ground <br />/ Conductor <br />Bonding path <br />1 <br />Down-roof <br />Document 8004478-001 Rev A www.zepsolar.com <br />© 2013/EN Zep Solar, Inc. Zep Solar reservesthe right to make sped lications chnages without any prior notice. All rights reserved. <br />Date Last Exported: June25,20134:45 PM <br />PAGE: 5 of 5