My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10180824_2526 W. MANLY - Plan (2)
PBA
>
Building
>
Plans
>
M
>
Manly Ave
>
2526 W Manly Ave
>
10180824_2526 W. MANLY - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2021 11:51:20 AM
Creation date
10/25/2020 9:49:40 PM
Metadata
Fields
Template:
Plan
Permit Number
10180824
Full Address
2526 W Manly Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LepSolar ZS COMP I GROUNDING AND BONDING <br />ZepSolar <br />Interlock <br />Interlock ZepZS Comp™ 1 Grounding and Bonding <br />This document describes the mechanics of how the electrical bonding is accomplished between the UL <br />Listed hardware components used in Zep Solar's ZS Comp mounting solution for composition shingle <br />roofs. <br />Zep Compatible™ systems do not require running copper conductors to each module. The act of physically <br />installing each component simultaneously establishes an electrical bond, as described in the following <br />pages. <br />ULListedtoUL2703 <br />p Tongue side <br />1 <br />Key Side Bonding <br />1 . Cutting "tooth» <br />Side view <br />1 1 <br />4 4 •Module <br />Ground Zep Intertock (Key side shown) <br />,·roof <br />Intertock <br />Key sidein <br />closed position <br />Bonding locations <br />Zep Compatible module <br />with Zep Groove <br />Cutting -tooth-on Keyside Forced interference during rotation <br />of tnterlock Zep causes teeth to <br />cut through anodization on module <br />frame, resulting in robust and UL <br />certified bonding path <br />Ed Tongue Side Bonding <br />63 Tongue side in closed position <br />Leveling FootDown / <br />ZS Comp Cutaway Illustration -44 a <br />Cutting -teeth <br />lodule <br />Bonding location on - <br />Tongueside <br />Forced interference between mating parts from module <br />rock-in motion cuts into module frame, removing <br />anodization and resulting in robust and ULcertified <br />bonding path <br />Document 800-1478-001 Rev A www.zepsolar.com <br />© 2013/EN Zep Sotar, Inc. Zep Solar reserves the right to make speci fications chnages without any prior notice. All rights reserved. <br />Date Last Exported: June 25,2013 4:45 PM <br />PAGE: I of 5 <br />Document 800-1478·001 Rev A www.zepsolar.com <br />© 2013/EN Zep Sotar, tnc. Zep Solar reserves the right to make specifications chnage5 without any prior notice. All rights reserved. <br />Date Last Exported: June 25,2013 4:45 PM <br />PAGE: 2 of 5
The URL can be used to link to this page
Your browser does not support the video tag.