Laserfiche WebLink
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! <br />**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. <br />For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org <br />Inland Empire Truss <br />275 West Rider St <br />Perris CA 92571 <br />(951)300-1758 <br />155 Harlem Ave <br />North Building, 4th Floor <br />Glenview, IL 60025 <br />Loading <br />Truss transfers a maximum horizontal load of <br />7939 # ( 240.00 plf ) along top chord, from either <br />direction, to supports where indicated. Diaphragm and <br />connections are to be designed by Engineer of Record. <br />Drag Loads: Force(#) (PLF) Mbr Start End <br />Case 1: 7939 240.00 TC 0.00 33.08 <br />7939 314.92 BC 0.00 25.21 <br />Truss designed to support 1-0-0 top chord outlookers <br />and cladding load not to exceed 10.00 PSF one face <br />and 24.0" span opposite face. Top chord must not be <br />cut or notched, unless specified otherwise. <br />Truss passed check for 20 psf additional bottom <br />chord live load in areas with 42"-high x 24"-wide <br />clearance. <br />Bottom chord checked for 10.00 psf non-concurrent <br />live load. <br />Job Number:RE1652_DV <br />OLIVE CREST <br />Truss Label:A2 <br />Ply: 1 <br />Qty:1 <br />SEQN:48400 GABL <br />FROM: <br />Page 2 of 2 <br />Cust: R 6852 JRef:1Yef68520007 T58 <br />DrwNo:295.25.1159.42040 <br />/RTT 10/22/2025 <br />**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! <br />**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. <br />For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org <br />Inland Empire Truss <br />275 West Rider St <br />Perris CA 92571 <br />(951)300-1758 <br />155 Harlem Ave <br />North Building, 4th Floor <br />Glenview, IL 60025 <br />Loading <br />Truss transfers a maximum horizontal load of <br />7939 # ( 240.00 plf ) along top chord, from either <br />direction, to supports where indicated. Diaphragm and <br />connections are to be designed by Engineer of Record. <br />Drag Loads: Force(#) (PLF) Mbr Start End <br />Case 1: 7939 240.00 TC 0.00 33.08 <br />7939 314.92 BC 0.00 25.21 <br />Truss designed to support 1-0-0 top chord outlookers <br />and cladding load not to exceed 10.00 PSF one face <br />and 24.0" span opposite face. Top chord must not be <br />cut or notched, unless specified otherwise. <br />Truss passed check for 20 psf additional bottom <br />chord live load in areas with 42"-high x 24"-wide <br />clearance. <br />Bottom chord checked for 10.00 psf non-concurrent <br />live load. <br />Job Number:RE1652_DV <br />OLIVE CREST <br />Truss Label:A2 <br />Ply: 1 <br />Qty:1 <br />SEQN:48400 GABL <br />FROM: <br />Page 2 of 2 <br />Cust: R 6852 JRef:1Yef68520007 T58 <br />DrwNo:295.25.1159.42040 <br />/RTT 10/22/2025 <br />10/22/2025