My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1303 N Bristol St - Sign - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bristol St
>
1303 N Bristol St
>
1303 N Bristol St - Sign - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 5:00:12 AM
Creation date
1/21/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20187025
101125204
Full Address
1303 N Bristol St
Street Number
1303
Street Direction
N
Street Name
Bristol
Street Suffix
St
Rectangle
ID:
1
Creator:
Import Agent
Created:
1/21/2026 5:00 AM
Modified:
1/20/2026 4:54 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 FOUNDATION DETAIL <br />PLATE DETAIL <br />L <br />P <br />E <br />R <br /> <br />S <br />C <br />H <br />E <br />D <br />. <br />ANCHOR ROD SUBSTITUTION SCHEDULE <br />SPECIFIED EUIALENT ASSEBL <br />SIPSON ROD S. EBED. <br />PAB 1,2 DIA. ASHER SIE 3 L <br />PAB4(H)-12 1 12 S. 3 11 <br />PAB5(H)-5 1 3 4 S. 12 1 3 <br />PAB6(H)-3 4 2 14 S. 12 1 12 <br />PAB(H)- 2 14 S. 12 1 5 <br />PAB(H)- 1 3 S. 5 1 <br />PAB9(H)- 1 1 3 12 S. 5 2 <br />PAB10(H)- 1 14 3 12 S. 3 4 214 <br />NOTES: <br />1. HERE SPECIFIED AS HIGH STRENGTH <br />(H), USE w/ GR. 105 (U.N.O.) IF NO <br />(H), USE GR. 36 IN. <br />2. IS THE TOTAL ROD LENGTH. <br />3. ASHER SIES ARE INIUS. <br />4. ASHERS AND BASE PLATES TO HAE <br />STD. HOLES. <br />DHOLE DBOLT 116 or DBOLT 1 <br />DHOLE DBOLT 1 or DBOLT 1 <br />HEA HE <br />LEELING NUT <br />STD. ASHER <br />U.N.O. <br />HEA HE NUT <br />HEA HE NUT <br />EBED. <br />ASHER <br />DBL. HEA <br />HE NUTS <br />STD. ASHER <br />U.N.O. <br />ID <br />E <br />N <br />T <br />I <br />F <br /> <br />A <br />N <br />C <br />H <br />O <br />R <br /> <br />P <br />E <br />R <br /> <br />P <br />L <br />A <br />N <br />FO <br />R <br /> <br />E <br />U <br />I <br />. <br /> <br />S <br />U <br />B <br />S <br />T <br />I <br />T <br />U <br />T <br />E <br />THE PURPOSE OF THE SUBSTITUTION TABLE IS TO PROIDE FOR AN EUIALENT <br />FABRICATED ANCHOR ASSEBL TO THE SIPSON PAB SPECIFIED IN THE PLANS. <br />REFER TO PLANS FOR SPECIFIED ANCHOR BEFORE USING SUBSTITUTION TABLE. <br />HO TO USE THE SUBSTITUTION TABLE <br />1. IDENTIF THE SPECIFIED ANCHOR IN THE PLAN OR DETAILS. <br />2. LOCATE THE SPECIFIED ANCHOR IN THE FIRST COLUN OF THE TABLE. USE ONL <br />THIS ENTR. <br />3. IDENTIF THE CORRESPONDING ANCHOR COPONENTS FOR AN EUIALENT <br />ASSEBL. <br />4. HERE THE PLANS INDICATE (H), REFER TO TABLE NOTES. <br />PAB SUBSTITUTION SCHEDULE <br />3/4 PL. <br />OE <br />R <br />T <br />U <br />R <br />N <br />3/16 <br />41. <br />0 <br />0 <br />1 <br />TUBE PER ELE. <br />L <br />( <br />I <br />N <br />. <br />) <br />BAR #D (IN)ET (IN)L (IN) <br />3 2.25 6.0 4.50 <br />4 3.00 .0 6.00 <br />5 3.5 10.0 .50 <br />6 4.50 12.0 9.00 <br /> 5.25 14.0 10.5 <br /> 6.00 16.0 12.0 <br />D <br />ET. <br />TPICAL 90 <br />REBAR HOO <br />6 <br />b <br />(3 <br /> <br />I <br />N <br />. <br />) <br />6 b <br />(3 IN. <br />) <br />6 <br />I <br />N <br />. <br />PER 90 HOO TABLE <br />(EA. HOO) <br />3 REBAR BEND DETAIL <br />2 HOOP HOO DETAIL <br />TP. SECTION <br />PIER DETAIL <br />2' <br />- <br />0 <br /> <br />I <br />N <br />. <br /> <br />E <br />B <br />E <br />D <br />. <br />T/ <br />O <br /> <br />A <br />S <br />H <br />E <br />R <br />2 <br />C <br />L <br />R <br />. <br />3 <br />CLR. <br />3 <br />CLR. <br />2'-0 <br />3 CL <br />R <br />. <br />(12) #4 ERT. BARS <br />(2) #4 HOOPS 2 TOP BT. <br />BALANCE 12 A. O.C.3' <br />- <br />0 <br /> <br />I <br />N <br />. <br />NOTE: <br />CONCRETE PIER IS TO BE POURED <br />TIGHT AGAINST UNDISTURBED SOIL. <br />BACFILL IS NOT ACCEPTABLE. <br />NOTE: <br />PIER NOT TO SCALE. <br />USE NOTED DIENSIONS. <br />NATURAL SOIL <br />(UNDISTURBED) <br />GRADE <br />HDG SIPSON PAB6-30 (L30) <br />ANCHOR RODS (OR 3/4 ALT. PER <br />SUB. SCHED.) <br />NON-SHRIN GROUT <br />PAD (OPTIONAL) <br />TUBE PER ELE. <br />PL. PER DETAIL <br />112 <br />A. <br />SLOPE FRO CENTER FOR DRAINAGE <br />(NOT RE'D. w/ GROUT PAD) <br />HOOPS PER <br />PIER DET. <br />3CLR. <br />R1'-0 <br />BASE PLATE AB. <br />1'-2 <br />ANCHOR w/ EBED. PL. <br />ASHER PER PIER DET. <br />1' <br />- <br />2 <br />ERTS. PER <br />PIER DET. <br />1'-2 <br />21 11516 <br /> S. <br />www.reverenceengineering.com <br />(619) 354-1152 <br />600 B STREET, STE 300 <br />SAN DIEGO, CA 92101 <br />PREPARED FOR: <br />PROJECT #: <br />AGI <br />2511019B <br />RA <br />I <br />S <br />I <br />N <br />G <br /> <br />C <br />A <br />N <br />E <br />' <br />S <br />PR <br />E <br />- <br />S <br />E <br />L <br />L <br /> <br />B <br />O <br />A <br />R <br />D <br />13 <br />0 <br />3 <br /> <br />N <br />. <br /> <br />B <br />R <br />I <br />S <br />T <br />O <br />L <br /> <br />S <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />0 <br />6 <br />No:Issue/Revision:Date: <br />----11-10-2025 <br />3 <br />2 <br />1 <br />4 <br />Initial Submittal <br />SHEET TITLE: <br />SHEET: <br />6-Jan-26 <br />1-6-2026PC Comments <br />STRUCTURAL <br />S.03 <br />Te esigns, etails an seciications containe in tis rawing are coniential. Te reciients o tis rawing ereb acnowlege an agree tat it is te sole roert o Reverence Engineering an tat te sall neiter use nor reveal an o te esigns, etails an seciications containe in tis rawing, outsie o te contractual agreement eresse written ermission rom Reverence Engineering. Deviations rom tis rawing sall not be mae <br />witout consulting Reverence Engineering. In case o incongruities between rawings, seciications, an etails inclue in contract ocuments, Reverence Engineering sall ecie wic inication must be ollowe an teir ecision sall be inal. Corigt Reverence Engineering. All rigts reserve. <br />ORIGINAL SHEET SIE: 111 <br />Li <br />m <br />i <br />t <br />s <br /> <br />o <br /> <br />l <br />i <br />a <br />b <br />i <br />l <br />i <br />t <br /> <br />e <br />t <br />e <br />n <br /> <br />o <br />n <br />l <br /> <br />t <br />o <br /> <br />t <br />e <br /> <br />w <br />o <br />r <br /> <br />e <br />t <br />a <br />i <br />l <br />e <br />, <br /> <br />o <br />r <br /> <br />t <br />e <br /> <br />u <br />a <br />n <br />t <br />i <br />t <br /> <br />o <br /> <br />a <br />s <br />s <br />e <br />m <br />b <br />l <br />i <br />e <br />s <br /> <br />i <br />n <br />i <br />c <br />a <br />t <br />e <br /> <br />( <br />1 <br /> <br />u <br />n <br />l <br />e <br />s <br />s <br /> <br />n <br />o <br />t <br />e <br /> <br />o <br />t <br />e <br />r <br />w <br />i <br />s <br />e <br />) <br />, <br /> <br />a <br />t <br /> <br />t <br />e <br /> <br />l <br />o <br />c <br />a <br />t <br />i <br />o <br />n <br /> <br />s <br />e <br />c <br />i <br />i <br />e <br />, <br /> <br />a <br />n <br /> <br />b <br /> <br />t <br />e <br /> <br />c <br />l <br />i <br />e <br />n <br />t <br /> <br />l <br />i <br />s <br />t <br />e <br /> <br />u <br />s <br />e <br /> <br />o <br /> <br />t <br />e <br />s <br />e <br /> <br />l <br />a <br />n <br />s <br /> <br />a <br />n <br />/ <br />o <br />r <br /> <br />c <br />o <br />r <br />r <br />e <br />s <br />o <br />n <br />i <br />n <br />g <br /> <br />s <br />t <br />r <br />u <br />c <br />t <br />u <br />r <br />a <br />l <br /> <br />c <br />a <br />l <br />c <br />u <br />l <br />a <br />t <br />i <br />o <br />n <br />s <br /> <br />i <br />n <br /> <br />v <br />i <br />o <br />l <br />a <br />t <br />i <br />o <br />n <br /> <br />o <br /> <br />e <br />i <br />t <br />e <br />r <br /> <br />v <br />o <br />i <br />s <br /> <br />a <br />l <br />l <br /> <br />l <br />i <br />a <br />b <br />i <br />l <br />i <br />t <br />.
The URL can be used to link to this page
Your browser does not support the video tag.