My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1501 N Ross St-REV 1 - Plan
PBA
>
Building
>
ProjectDox
>
R
>
Ross St
>
1501 N Ross St
>
1501 N Ross St-REV 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 5:00:11 AM
Creation date
1/27/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20185807
101123623
Full Address
1501 N Ross St
Street Number
1501
Street Direction
N
Street Name
Ross
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B (N) NGO METER SOCKET ≥ 400A <br />NTS <br />- NGO METER WORKING SPACE <br />TO BE MAINTAINED. <br />- EQUIPMENT ABOVE OR BELOW <br />NGOM WILL NOT EXCEED <br />DEPTH OF NGOM. <br />- NGOM TO BE MOUNTED ON <br />STRUT IF NEEDED TO <br />ACCOUNT FOR ANY DEPTH <br />DIFFERENCES. <br />- CENTER OF METER CAN NOT <br />TO EXCEED 6'-3" MAX, 4'-0" MIN. <br />-EQUIPMENT AND CONDUIT <br />SHOWN IS DIAGRAMMATIC <br />ONLY. SEE LINE DRAWINGS <br />FOR CONDUIT SIZING. <br />NOTES <br />(E) GRADE <br />6' <br />- <br />3 <br />" <br /> <br />M <br />A <br />X <br />4' <br />- <br />0 <br />" <br /> <br />M <br />I <br />N <br />FR <br />O <br />M <br /> <br />G <br />R <br />A <br />D <br />E <br />36" - OR - WIDTH <br />OF EQUIPMENT MIN. <br />(N) HOUSEKEEPING PAD <br />THE PAD SHALL BE FLUSH WITH <br />THE BOTTOM OF THE SERVICE EQUIPMENT <br />AND EXTEND A MINIMUM OF THREE FEET. <br />6' <br />- <br />6 <br />" <br /> <br />M <br />I <br />N <br /> <br />H <br />E <br />I <br />G <br />H <br />T <br />CL <br />E <br />A <br />R <br />A <br />N <br />C <br />E <br />FR <br />O <br />M <br /> <br />G <br />R <br />A <br />D <br />E <br />18" MIN. <br />10" <br />MIN. <br />10" <br />MIN. <br />MIN. CLEARANCE TO <br />EDGE OF WINDOW <br />OR DOOR <br />MIN. CLEARANCE TO <br />PLUMBING FIXTURES <br />EXTENDING 6" OUT <br />FROM WALL SURFACE <br />A (N) AC DISCONNECT <br />(E) GRADE <br />6' <br />- <br />7 <br />" <br /> <br />M <br />A <br />X <br /> <br />H <br />A <br />N <br />D <br />L <br />E <br />HE <br />I <br />G <br />H <br />T <br /> <br />F <br />R <br />O <br />M <br /> <br />G <br />R <br />A <br />D <br />E <br />NOTES <br />- CENTER OF GRIP IN HIGHEST <br />POSITION MUST NOT EXCEED <br />6'-7" MAX. <br />-EQUIPMENT AND CONDUIT <br />SHOWN IS DIAGRAMMATIC <br />ONLY. SEE LINE DRAWINGS <br />FOR CONDUIT SIZING. <br />C INVERTER CLEARANCE - SOLAREDGE HOME HUB <br />MIN. CLEARANCE <br />BACK TO BACK <br />INVERTERS 8" MIN. <br />CLEAR <br />16" MIN. <br />CLEAR <br />8" MIN. <br />CLEAR <br />MIN. CLEARANCE <br />VERTICALLY <br />STACKED INVERTERS <br />8" MIN. <br />CLEAR <br />MIN. CLEARANCE <br />SIDE-BY-SIDE INVERTERS <br />- LISTED MIN. CLEARANCES FOR <br />INVERTER TO OTHER <br />OBJECTS, UNLESS NOTED <br />- MIN. CLEARANCES REQUIRED <br />FOR HEAT DISSIPATION <br />- CONDUIT MAY BE REQUIRE <br />ADDITIONAL CLEARANCE <br />-EQUIPMENT AND CONDUIT <br />SHOWN IS DIAGRAMMATIC <br />ONLY. SEE LINE DRAWINGS <br />FOR CONDUIT SIZING. <br />NOTES <br />8" MIN. <br />CLEAR <br />4" MIN. <br />CLEAR <br />4" MIN. <br />CLEAR <br />4" MIN. <br />CLEAR <br />46.4" <br />9.84" <br />BATTERY WEIGHT: 262LBS <br />31.1" 8" MIN. CLEAR <br />MIN. CLEARANCE <br />BATTERY SHOWN ON <br />OPTIONAL FLOOR STAND <br />KIT <br />SOLAREDGE ENERGY BANK <br />BAT-10K1P <br />D BESS CLEARANCE - SOLAREDGE ENERGY BANK <br />·LISTED MIN. CLEARANCES FOR ENERGY BANK TO OTHER <br />OBJECTS AS REQUIRED BY MANUFACTURER. NEC 110.3(B) <br />·BATTERY CAN BE WALL MOUNTED OR USE MANUFACTURES <br />FLOOR STAND KIT. <br />·8" MIN. CLEARANCES REQUIRED FOR HEAT DISSIPATION <br />·CONDUIT MAY REQUIRE ADDITIONAL CLEARANCE. <br />·EQUIPMENT AND CONDUIT SHOWN IS DIAGRAMMATIC ONLY. <br />·WORKING CLEARANCES SHALL BE IN ACCORDANCE WITH NEC <br />110.26 FOR ANY COMPONENTS THAT ARE LIKELY TO REQUIRE <br />EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE <br />WHILE ENERGIZED. <br />·BATTERIES SHALL NOT BE INSTALLED IN DIRECT SUNLIGHT <br />WITH OUT SHADE COVER <br />NOTES <br />8" MIN. <br />CLEAR <br />8" MIN. <br />CLEAR <br />8" MIN. <br />CLEAR <br />SOLAREDGE ENERGY BANK <br />WITH 4 BATTERIES ON FLOOR STAND KITS <br />53.15" <br />MIN. <br />6.3" <br />13.78" <br />1ST BATTERY FLOOR <br />STAND TO BE ANCHORED <br />TO WALL/RACK <br />SIDE BRACKETS <br />FOR <br />ATTACHING <br />BATTERIES <br />MIN. CLEAR IF <br />WALL MOUNTING <br />DC <br />CONNECTION <br />LOCATION <br />AC DISCONNECT <br />GENERAL NOTES <br />·FIELD VERIFY ALL MEASUREMENTS <br />·ALL WORK SHALL COMPLY WITH ALL STATE AND LOCAL CODES AND ANY OTHER REGULATING AUTHORITIES <br />WHICH HAVE AUTHORITY OVER ANY PORTION OF THE WORK. <br />·DRAWINGS HAVE BEEN DETAILED IN COMPLIANCE WITH UL LISTING REQUIREMENTS, OSFM SOLAR <br />PHOTOVOLTAIC INSTALLATION REQUIREMENTS, AND BUILDING CODES FOR THE MATERIALS SPECIFIED. PRIOR <br />TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND NOTIFY THE <br />DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE FROM SUNRUN OF ANY DISCREPANCIES. ANY WORK <br />PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT THE <br />SUBCONTRACTORS SOLE EXPENSE. <br />·SUBCONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO SUNRUN FOR APPROVAL BEFORE <br />MAKING ANY CHANGES OR DEVIATION FROM PLANS BEFORE WRITTEN APPROVAL FROM SUNRUN PLACES <br />LIABILITY ON THE SUBCONTRACTOR. <br />·ALL EQUIPMENT SHALL BE MOUNTED AS SHOWN. WHERE DETAILS ARE NOT PROVIDED, CONTRACTOR SHALL <br />USE STANDARD CONSTRUCTION PRACTICES. <br />·ALL SURFACES SHALL BE PATCHED AND PAINTED AROUND NEW DEVICES AND EQUIPMENT TO MATCH EXISTING <br />FINISHES. ANY METAL SHAVINGS FROM SITE WORK SHALL BE CLEANED FROM ALL SURFACES WHERE OXIDIZED <br />OR CONDUCTIVE METAL SHAVINGS MY CAUSE RUST, ELECTRICAL SHORT CIRCUITS, OR OTHER DAMAGE. <br />·APPROVALS FROM BUILDING INSPECTORS SHALL NOT CONSTITUTE AUTHORITY TO DEVIATE FROM THE <br />DRAWINGS. <br />·AREAS WITHIN 10 FEET (3048 MM) ON EACH SIDE OF OUTDOOR ESS SHALL BE CLEARED OF COMBUSTIBLE <br />VEGETATION AND OTHER COMBUSTIBLE GROWTH. SINGLE SPECIMENS OF TREES, SHRUBBERY OR CULTIVATED <br />GROUND COVER SUCH AS GREEN GRASS, IVY, SUCCULENTS OR SIMILAR PLANTS USED AS GROUND COVER <br />SHALL BE PERMITTED TO BE EXEMPT PROVIDED THAT THEY DO NOT FORM A MEANS OF READILY TRANSMITTING <br />FIRE. <br />OPENING INTO PARKING GARAGE <br />VEHICLE ENTRY <br />WALL SPACE <br />116"255" <br />6"6" <br />6" <br />6"8" <br />16 <br />" <br />8" <br />8" MIN 8"3' <br />36" <br />48 <br />" <br />14.6" <br />21 <br />. <br />0 <br />6 <br />" <br />31.1" <br />46 <br />. <br />4 <br />" <br />51 <br />" <br />27.88" <br />36" <br />42 <br />" <br />27.88" <br />51 <br />" <br />95 <br />" <br />101.25" <br />18" <br />OPENING INTO PARKING GARAGE <br />GRATED, NO ACCESS <br />(N) AC LOAD CENTER <br />CONDUIT ROUTING FOR <br />REFERENCE ONLY <br />(N) (4) SOLAREDGE ENERGY BANK <br />BATTERY WALL MOUNTED <br />(N) PV SYSTEM UTILITY DISCONNECT (FUSED) <br />(N) UTILITY OWNED PV PRODUCTION METER <br />(E) EQUIPMENT ENCLOSURE <br />(E) TENANT METERS <br />(E) MAIN DISCONNECT <br />(N) (4) SOLAREDGE ENERGY BANK <br />BATTERY WALL MOUNTED <br />(N) (4) SOLAREDGE ENERGY BANK <br />BATTERY WALL MOUNTED <br />(E) UTILITY PULL SECTION <br />(N) PV SYSTEM UTILITY DISCONNECT (NON-FUSED) <br />(N) PV INVERTER <br />C:\USERS\BSCHULZE\DESKTOP\ROSS & DURANT II\2317_ROSS&DURANTII_CAD_VB\ROSS&DURANTII_VB.DWG <br />ELECTRICAL PLAN VIEWS <br />CONTRACTOR: <br />ENGINEERING APPROVAL: <br />600 CALIFORNIA ST #1800, SAN <br />FRANCISCO, CA 94104 <br />CA CL #750184 <br />UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN <br />PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT <br />LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. <br />ROSS & DURANT II <br />1501 N ROSS ST, SANTA <br />ANA, CA 92706, USA <br />APN:005-112-07 <br />DEVELOPER: <br />C&C DEVELOPMENT <br />DESCRIPTION DATE REV <br />0ORIGINAL04/28/25 <br />ASYSTEM DOWN SIZE 07/16/25 <br />BAHJ COMMENTS 08/04/25 <br />CEQUIPMENT LOCATION 10/21/25 <br />PROJECT DETAILS: <br />PV SYSTEM: <br />·57.4 kW DC <br />·40 kW AC <br />·53.49 CEC AC <br />ENERGY STORAGE: <br />·40 kW AC <br />·116.4 kWH <br />E200 <br />SHEET SIZE: <br />REVISION: <br />SHEET TITLE: <br />36" X 24" (ARCH D) <br />DESIGNER: FINS_MK <br />C <br />CONTRACT NUMBER: <br />3003200672 <br />PJT #: PROP-002137 <br />(N) PV POINT OF INTERCONNECTION (POI-1) (EXTERIOR) <br />(N) PV PRODUCTION METER SOCKET <br />1501 N ROSS ST SOMAH1 PV <br />PRODUCTION METER (EXTERIOR) <br />REFERENCE METER NUMBER: <br />222012-787976 (EXTERIOR) <br />(N) UTILITY AC DISCONNECT <br />(ACDS-1.1) (EXTERIOR) <br />(N) MAINTENANCE AC DISCONNECT (ACDS-1.2) (EXTERIOR) <br />(N) AC LOAD CENTER (LC-1.1) (EXTERIOR) <br />(N) PV INVERTER & ESS AC <br />DISCONNECT (INV-1.1) (EXTERIOR) <br />(N) PV INVERTER & ESS AC DISCONNECT (INV-1.2) (EXTERIOR) <br />(N) PV INVERTER & ESS AC <br />DISCONNECT (INV-1.3) (EXTERIOR) <br />(N) PV INVERTER & ESS AC DISCONNECT (INV-1.4) (EXTERIOR) <br />(N) (8) SOLAREDGE BAT-10K1P BATTERY <br />MOUNTED ON FLOOR STAND KIT (EXTERIOR) <br />E EQUIPMENT PLAN - POI-1 (BLDG 1501) <br />SCALE: 3/8" = 1'-0" <br />(E)TENANT METERS (EXTERIOR) <br />(E)SERVICE EQUIPMENT (EXTERIOR) <br />G EQUIPMENT PLAN - SOUTH VIEW - POI-1 (BLDG 1501) <br />F EQUIPMENT PLAN - WEST VIEW - POI-1 (BLDG 1501) <br />(N) (4) SOLAREDGE BAT-10K1P BATTERY <br />MOUNTED ON FLOOR STAND KIT (EXTERIOR) <br />(E)WALL TO MOUNT EQUIPMENT (EXTERIOR) <br />C
The URL can be used to link to this page
Your browser does not support the video tag.