Laserfiche WebLink
GENERAL NOTES <br />1.BEFORE COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFY THE EXACT <br />LOCATIONS, ELEVATIONS AND CHARACTERISTICS OF ALL UTILITIES AND PIPING, AND <br />SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. <br />2.THE PLUMBING SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALL CONFORM TO <br />THE 2022 CPC AND AUTHORITIES HAVING JURISDICTION. IN CASE OF CONFLICTS WITH <br />CODES, DRAWINGS, OR SPECIFICATIONS, THE MOST STRINGENT SHALL PREVAIL. <br />3.THE DRAWINGS WERE PREPARED WITH THE BEST STRUCTURAL AND ARCHITECTURAL <br />INFORMATION AVAILABLE. IT IS UNDERSTOOD THAT EQUIPMENT LOCATIONS AND <br />ROUTING OF PIPING MAY VARY FROM THAT SHOWN ON THE PLANS AS CONSTRUCTION <br />PROCEEDS. IT IS THE CONTRACTORS RESPONSIBILITY TO: <br />a.NOTIFY THE MECHANICAL ENGINEER OF CONSTRUCTION RESTRAINTS WHICH MAKE <br />VARIATIONS FROM THE PLANS NECESSARY. <br />b.COMPLETE ALL WORK INCLUDING THE VARIATIONS WITHOUT CHARGING EXTRAS TO <br />THE BID CONTRACT. COMPLETION OF WORK MEANS THE JOB IS WORKING AND <br />MEETS ALL CITY, COUNTY AND UNIFORM MECHANICAL, PLUMBING AND BUILDING <br />CODE REQUIREMENTS. <br />4.THESE DRAWINGS DO NOT INCLUDE ALL NECESSARY SAFETY REQUIREMENTS. <br />CONTRACTOR TO COMPLY TO THE SAFETY REQUIREMENTS SET FORTH BY THE LOCAL <br />AUTHORITIES HAVING JURISDICTION. <br />5.THESE DRAWINGS ARE FOR BIDDING PURPOSES ONLY. THEY ARE ESSENTIALLY <br />DIAGRAMMATIC TO THE EXTENT THAT MANY OFFSETS, BONDS, UNIONS, SPECIFIC <br />FITTINGS AND EXACT LOCATIONS ARE NOT INDICATED. <br />6.THE PLUMBING CONTRACTOR SHALL PROVIDE THE WATER, SEWER AND STORM DRAIN <br />SYSTEMS AND CONNECT TO EACH DESIGNATED POINT OF CONNECTIONS 5'-0" OUTSIDE <br />OF THE BUILDING. ALL SEWER SYSTEM SHALL MEET THE REQUIRED INVERT ELEVATION <br />SHOWN ON THE CIVIL DRAWINGS. PIPING BEYOND THIS POINT IS SPECIFIED UNDER <br />ANOTHER SECTION OF THE SPECIFICATION AND SHALL BE AS SHOWN ON THE CIVIL <br />DRAWINGS. <br />7.THE OWNER SHALL MAKE ALL ARRANGEMENTS WITH UTILITY COMPANIES FOR SERVICE <br />AND CONNECTION AND SHALL MAKE APPLICATION FOR SERVICE AND PERMITS AND <br />SHALL PAY ALL FEES AND CHARGES INCLUDING THE COST OF VAULTS AND METERS. <br />8.ALL PLUMBING WORK SHALL BE INSTALLED SO AS TO AVOID INTERFERENCE WITH <br />ELECTRICAL EQUIPMENT, MECHANICAL EQUIPMENT AND STRUCTURAL FRAMING, <br />SKYLIGHT, ETC. <br />9.THE CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL CEILING ACCESS PANELS <br />WITH THE ARCHITECTURAL REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING PLAN. <br />10.COORDINATE ALL LOCATIONS, SIZES AND ELEVATIONS OF ALL SLEEVES THROUGH <br />WALLS, BEAMS, SLABS AND FOOTING WITH STRUCTURAL AND ARCHITECTURAL <br />DRAWINGS. ALL PIPES SLEEVING THROUGH FOOTINGS SHALL HAVE A SLEEVE DIAMETER <br />OF TWO PIPE SIZES OVER THE PIPE PASSING THROUGH THE FOOTING. <br />11.CONTRACTOR MUST NOT CUT, RELOCATE, COMPROMISE, DAMAGE OR OTHERWISE <br />ALTER THE ROOF STRUCTURE. THE JOISTS WHICH OCCUR THROUGHOUT ALL THE MECH. <br />BAY AREAS LIKE WISE MUST NOT BE ALTERED. <br />12.BEFORE FABRICATION OR INSTALLATION, THE CONTRACTOR SHALL VERIFY EXACT <br />LOCATIONS OF ALL MECHANICAL EQUIPMENT AND EQUIPMENT PROVIDED UNDER <br />ANOTHER SECTION OF SPECIFICATIONS. EXACT ROUGH-IN LOCATIONS AND <br />REQUIREMENTS SHALL BE COORDINATED IN FIELD. <br />13.CONNECTION BETWEEN INCOMPATIBLE MATERIALS ABOVE GRADE AND INSIDE BUILDING <br />SHALL BE MADE WITH TWO (2) DIELECTRIC UNIONS SEPARATED BY A TWELVE INCH (12") <br />SECTION OF RED BRASS PIPE. <br />14.ALL FLOOR AND WALL PENETRATIONS MUST BE SEALED WATERTIGHT AND VERMIN <br />PROOF. <br />15.ALL EXTERIOR GAS COCKS, WATER SHUTOFF VALVES AND/OR SEWER CLEAN OUTS <br />BELOW GROUND SHALL BE INSTALLED IN YARD BOXES WITH THE COVERS <br />CONSPICUOUSLY MARKED "GAS", "WATER", AND "SEWER" RESPECTIVELY. <br />16.EXACT LOCATIONS AND MOUNTING HEIGHTS OF PLUMBING FIXTURES SHALL BE <br />OBTAINED FROM THE ARCHITECTURAL DRAWINGS. <br />17.SEE ARCHITECTURAL DRAWINGS FOR HANDICAP FIXTURE LOCATIONS AND MOUNTING <br />HEIGHTS. INSULATE ALL EXPOSED HOT WATER AND DRAIN PIPING BELOW HANDICAP <br />LAVATORIES AND SINKS WITH INSULATING TAPE AND OFFSET P-TRAP AGAINST WALL. <br />ALL FLUSH VALVES FOR HANDICAP SHALL BE LOCATED ON HANDICAP WHEELCHAIR <br />ACCESS SIDE OF STALL. <br />18.ALL WASTE, SOIL AND VENT PIPING SHALL SLOPE AT 2% UNLESS OTHERWISE INDICATED. <br />19.ALL VALVES, TRAP PRIMERS, WATER HAMMER ARRESTORS OR OTHER EQUIPMENT <br />SHOWN IN WALLS OR ABOVE NON-ACCESSIBLE CEILINGS SHALL BE INSTALLED BEHIND <br />AN ACCESS PANEL. <br />20.PLUMBING CONTRACTOR SHALL VISIT THE JOB SITE PRIOR TO BASE BID. HE SHALL <br />FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS AND FUTURE WORK TO BE DONE. <br />HE SHALL INCLUDE ALL HIS SITE INFORMATION AND CONDITIONS WITHIN HIS BASE BID. <br />HE SHALL BE RESPONSIBLE FOR COMPLETE AND FULLY FUNCTIONING PLUMBING <br />SYSTEMS. <br />21.PLUMBING CONTRACTOR SHALL COORDINATE COMPLETE PLUMBING INSTALLATION AND <br />REQUIREMENTS PRIOR TO BASE BID WITH ALL LOCAL DISTRICTS AND GOVERNING <br />AUTHORITIES. INCLUDE ALL FINDINGS WITHIN THE BASE BID. <br />22.PROVIDE RECIRCULATION PUMP FOR HOT WATER WHEN THE HOT WATER PIPE IS OVER <br />50'. <br />23.PROVIDE TRAP SEAL PRIMER FOR FLOOR DRAIN SUBJECT TO INFREQUENT USE. <br />24.ALL PLUMBING, AND GAS LINES SHALL BE CONCEALED WITHIN THE BUILDING <br />STRUCTURE TO AS GREAT EXTENT AS POSSIBLE. ALL EXPOSED CONDUITS, PLUMBING, <br />ETC. SHALL BE INSTALLED AT LEAST 6" OFF FLOOR AND 3/4" FROM WALLS USING <br />STANDOFF BRACKETS. <br />25.PLUMBING OR PIPING CANNOT BE INSTALLED ACROSS ANY AISLE WAY, TRAFFIC AREA <br />OR DOOR OPENING. <br />26.MULTIPLE RUNS OR CLUSTERS OF PIPELINES SHALL BE FURRED IN OR ENCASED IN AN <br />APPROVED SEALED ENCLOSURE. <br />27.APPROVED BACKFLOW PREVENTION DEVICES SHALL BE PROPERLY INSTALLED <br />UPSTREAM OF ANY POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY AND A <br />SOURCE OF CONTAMINATION. HOSES SHALL NOT BE ATTACHED TO A FAUCET OR HOSE <br />BIBB UNLESS AN APPROVED BACKFLOW PREVENTER IS PROVIDED. <br />28.ALL SANITARY SYSTEM MATERIALS SHALL BE LISTED BY AN APPROVED LISTING AGENCY. <br />29.EACH VENT SHALL RISE VERTICALLY TO A POINT NOT LESS THAN SIX (6) INCHES ABOVE <br />THE FLOOD-LEVEL RIM OF THE FIXTURE SERVED BEFORE OFFSETTING HORIZONTALLY <br />OR BEFORE BEING CONNECTED TO ANY OTHER VENT. <br />30.EACH VENT SHALL TERMINATE NOT LESS THAN 10 FEET FROM, OR AT LEAST 3 FEET <br />FROM, OR NOT LESS THAN 3 FEET ABOVE, ANY OPENABLE WINDOW, DOOR, OPENING, <br />AIR INTAKE, OR VENT SHAFT, OR NOT LESS THAN 3 FEET IN EVERY DIRECTION FROM ANY <br />LOT LINE. <br />31.FIELD VERIFY ALL EXISTING PLUMBING CONDITIONS AND EXISTING/NEW HVAC PLUMBING <br />CONNECTIONS PRIOR TO BIDDING AND START OF WORK. <br />32.IN THE EVENT THAT THE PLANS DO NOT REPRESENT FIELD CONDITIONS, CONTACT THE <br />OWNER, ARCHITECT, OR DESIGNATED ENGINEER DESIGNER PRIOR TO START OF ANY <br />WORK. <br />33.CAP ALL DOMESTIC WATER PIPING THAT IS SERVING A PLUMBING FIXTURE THAT IS <br />BEING DEMOLISHED. <br />34.NEW OR REPAIRED POTABLE WATER SYSTEMS SHALL BE DISINFECTED PRIOR TO USE. <br />CONTRACTOR SHALL PROVIDE A SIGNED WRITTEN DECLARATION TO THE INSPECTOR AT <br />TIME OF INSPECTION THAT POTABLE WATER SYSTEM HAS BEEN DISINFECTED. <br />35.EXISTING BUILDING SEWERS AND BUILDING DRAINS MAY BE USED IF SUCH SEWERS <br />HAVE BEEN PROPERLY MAINTAINED AND FOUND UPON EXAMINATION AND TEST <br />PERFORMED BY THE OWNER OR OWNER'S DESIGNATED AGENT THAT THEY ARE IN <br />WORKING CONDITION AND FREE FROM ANY DEFECT. <br />36.CLEANOUTS SHALL BE INSTALLED AS PER SEC. 707.0 & 719.0 OF THE PLUMBING CODE. <br />PLUMBING FIXTURE SCHEDULE <br />MARK ITEM HW CW VENT WASTE DESCRIPTION <br />WH WATER HEATER 3/4"3/4"----A.O. SMITH DRE-52-24 ELECTRIC TANK TYPE WATER HEATER. 50 GAL. 24 KW INPUT. EXPANSION TANK <br />(ZURN MODEL XT-18, 4.8 GAL.) INSTALLED WITH WATER HEATER. EQUIVALENT FIXTURE ACCEPTABLE. <br />WC TANK TYPE <br />WATER CLOSET --3/4"2"4"AMERICAN STANDARD CADET PRO ELONGATED ADA COMPLIANT TANK WATER CLOSET WITH OPEN <br />FRONT ELONGATED TOILET SEAT. 1.28 GPF. EQUIVALENT ACCEPTABLE. <br />URL WALL MOUNTED <br />URINAL --1"2"2"AMERICAN STANDARD WALL MOUNTED URINAL WASHBROOK FLOWISE 0.125 GPF WITH MANUAL <br />FLUSH VALVE 6590.503. EQUIVALENT FIXTURE ACCEPTABLE. <br />LAV WALL MOUNTED LAVATORY 1/2"1/2"2"2" <br />AMERICAN STANDARD 0356.041 SINK W/ 6055.165. SELECTRONIC PROXIMITY FAUCET. 0.5 GPM. ADA <br />COMPLIANT. EQUIVALENT ACCEPTABLE. INSTALL WITH POWERS #LFG480 MIXING VALVE(ASSE 1070 <br />LISTED). <br />FD FLOOR DRAIN ----2"2"ZURN Z415B W/SEDIMENT BUCKET. TRAP PRIMER CONNECTION WHERE REQUIRED BY CODE. <br />EQUIVALENT FIXTURE ACCEPTABLE. <br />FS FLOOR SINK ----2"2"ZURN Z-1901, 12" SQUARE TOP, HALF GRATE COVER AND 8" DEEP WITH DOME STRAINER. <br />EQUIVALENT FIXTURE ACCEPTABLE. <br />WCO WALL CLEANOUT ------LINE SIZE ZURN Z1441 WALL CLEANOUT W/SMOOTH ACCESS COVER EQUIVALENT FIXTURE ACCEPTABLE. <br />FCO FLOOR CLEANOUT ------LINE SIZE ZURN Z1400-B FLOOR CLEANOUT EQUIVALENT FIXTURE ACCEPTABLE. <br />TP TRAP PRIMER --1/2"----WATTS SERIES TP300 TRAP PRIMER WITH INTEGRAL VACCUM BREAKER. MOUNT IN WALL WITH <br />ACCESS PANEL&SHUTOFF VALVE. EQUIVALENT FIXTURE ACCEPTABLE. <br />PRV PRESSURE REDUCING <br />VALVE --1-1/4"----ZURN MODEL 500XL WATER PRESSURE REDUCING VALVE WITH INTEGRAL BY-PASS CHECK VALVE. <br />EQUIVALENT FIXTURE ACCEPTABLE. <br />(E) GI GREASE INTERCEPTOR ------4"JENSEN PRECAST 1500 GALLON GREASE INTERCEPTOR .MODEL MU1500 EE-G2 . WITH EXISTING <br />SAMPLE BOX. EXISTING TO REMAIN. <br />SHEET INDEX <br />P000 <br />P001 <br />P002 <br />P100 <br />P200 <br />TP00 <br />·EXISTING SHELL BUILDING TO RESTAURANT CONVERSION. <br />·PROVIDE NEW PLUMBING FIXTURES/CONNECTIONS THROUGHOUT THE SPACE. <br />·NEW WATER HEATER TO BE INSTALLED. <br />PLUMBING NOTES & SCHEDULES <br />PLUMBING DETAILS <br />PLUMBING SPECIFICATION SHEETS <br />WASTE & VENT PLAN <br />TITLE 24 <br />P300 PLUMBING ISOMETRIC DIAGRAM <br />SCOPE OF WORK <br />WATER & GAS PLAN <br />PLUMBING SPECIFICATION <br />1.CLEANOUTS <br />PROVIDE CLEANOUTS WITH BRASS SCREW PLUG AT ALL CHANGES OF DIRECTION <br />TO PERMIT ROUTING OF ALL SEWERS. ALL CLEAN OUTS SHALL BE INSTALLED <br />WHERE READILY ACCESSIBLE. THE CONTRACTOR SHALL COORDINATE ALL CLEAN <br />OUT LOCATIONS OF EQUIPMENT, CABINETS, ETC., WITH THE ARCHITECT PRIOR <br />TO ANY INSTALLATION. <br />2.VALVES <br />EVERY PLUMBING FIXTURE SHALL BE INDEPENDENTLY VALVED. <br />3.TESTING <br />ALL SEWERS AND WATER PIPING SHALL BE PROPERLY TESTED TO THE <br />SATISFACTION OF THE ARCHITECT AND THE LOCAL BUILDING INSPECTOR. <br />4.EXCAVATION AND BACK FILLING <br />TRENCHES SHALL BE BACK FILLED AND SETTLED BY PUDDLING. NO PIPE SHALL <br />BE LESS THAN 12" BELOW FINISH GRADE. <br />5.PIPING SUPPORTS <br />ALL PIPING TO BE SUPPORTED WITH HANGERS AND BRACKETS WHICH PROVIDE <br />ISOLATION FROM FRAMING. CONTACT BETWEEN PIPE AND SUPPORT TO BE LINED <br />WITH PLASTIC OR FELT. <br />NOTE: <br />1.ABS AND PVC INSTALLATIONS ARE LIMITED TO NOT MORE THAN TWO STORIES OF <br />AREAS OF RESIDENTIAL ACCOMMODATION. <br />2.ABS/PVC VENT TERMINATIONS UP THROUGH THE ROOF EXPOSED TO SUNLIGHT ARE <br />REQUIRED TO BE PROTECTED BY WATER BASED SYNTHETIC LATEX PAINTS. <br />INSIDE <br />NATURAL <br />SANITARY <br />WASTE <br />SANITARY <br />GAS <br />VENT <br />INSIDE <br />OUTSIDE <br />EXPOSED <br />CONCEALED <br />OUTSIDE <br />CO <br />P <br />P <br />E <br />R <br />- <br />T <br />Y <br />P <br />E <br /> <br />" <br />M <br />" <br />WATER <br />DOMESTIC <br />SERVICE: <br />PIP <br />E <br /> <br />M <br />A <br />T <br />E <br />R <br />I <br />A <br />L <br />: <br />OUTSIDE <br />INSIDE <br />CO <br />P <br />P <br />E <br />R <br />- <br />T <br />Y <br />P <br />E <br /> <br />" <br />L <br />" <br />CO <br />P <br />P <br />E <br />R <br />- <br />T <br />Y <br />P <br />E <br /> <br />" <br />K <br />" <br />SC <br />H <br />E <br />D <br />. <br /> <br />4 <br />0 <br /> <br />P <br />V <br />C <br />, <br /> <br />D <br />W <br />V <br />REMARKS: <br />INDIRECT <br />WASTE <br />INSIDE <br />INSIDE* <br />PIPE MATERIAL SCHEDULE <br />*USE COPPER <br />TYPE "M" FOR <br />CONDENSATE <br />SC <br />H <br />E <br />D <br />. <br /> <br />4 <br />0 <br />BL <br />A <br />C <br />K <br /> <br />S <br />T <br />E <br />E <br />L <br />CA <br />S <br />T <br /> <br />I <br />R <br />O <br />N <br /> <br />S <br />O <br />I <br />L <br /> <br />W <br />/ <br /> <br />H <br />. <br />G <br />. <br />OR <br /> <br />" <br />I <br />D <br />E <br />A <br />L <br />" <br /> <br />F <br />I <br />T <br />T <br />I <br />N <br />G <br />S <br />SC <br />H <br />E <br />D <br />U <br />L <br />E <br /> <br />4 <br />0 <br />GA <br />L <br />V <br />A <br />N <br />I <br />Z <br />E <br />D <br /> <br />S <br />T <br />E <br />E <br />L <br />SC <br />H <br />E <br />D <br />. <br /> <br />4 <br />0 <br /> <br />A <br />B <br />S <br />, <br /> <br />D <br />M <br />V <br />GSOV <br />W/ <br />AUTOMATIC GAS SHUT-OFF VALVE <br />WITH <br />FLR <br />NTS <br />IE <br />CFH <br />DN <br />FF <br />POC <br />(N) <br />FCO/COTG <br />WCO <br />SOV <br />CUBIC FEET PER HOUR <br />FINISHED FLOOR ELEVATION <br />FLOOR <br />NOT TO SCALE <br />INVERT ELEVATION <br />DOWN <br />POINT OF CONNECTION <br />NEW <br />FLOOR CLEANOUT/CLEANOUT TO GRADE <br />WALL CLEANOUT <br />COLD WATER SHUT-OFF VALVE <br />ABBR. <br />PLUMBING LEGEND <br />HW <br />G <br />CD <br />T&P <br />V <br />GW <br />S OR W <br />CW <br />SYMBOL <br />DOMESTIC COLD WATER <br />SOIL OR WASTE BELOW FLOOR <br />LOW PRESSURE GAS <br />DOMESTIC HOT WATER <br />PRIMARY CONDENSATE DRAIN <br />TEMPERATURE & PRESSURE <br />VENT <br />DESCRIPTION <br />HWR DOMESTIC HOT WATER RETURN <br />C.V.CHECK VALVE <br />PRV PRESSURE REDUCING VALVE <br />BALANCING VALVE <br />SOC SHUT-OFF COCK (GAS) <br />TMV TEMPERATURE MIXING VALVE <br />VTR VENT TO ROOF <br />BLV <br />CP RECIRCULATION PUMP <br />CW COLD WATER STUB-IN <br />HW HOT WATER STUB-IN <br />XSS <br />XGW <br />EXISTING WASTE/SANITARY SEWER <br />EXISTING GREASE WASTE <br />XCW <br />FW <br />EXISTING COLD WATER <br />FILTERED WATER <br />(E)EXISTING <br />(R)RELOCATED, EXISTING <br />XG EXISTING GAS <br />XHW EXISTING HOT WATER <br />GREASE WASTE BELOW FLOOR <br />GSOV GAS SHUT-OFF VALVE <br />CWV COMBINATION WASTE & VENT BELOW <br />COLD WATER OUTLETCWO <br />DCO DOUBLE CLEANOUT <br />BACKFLOW PREVENTERBFP <br />SCW SOFTEN COLD WATER <br />IND INDIRECT WASTE <br />MPG MEDIUM PRESSURE GAS <br />HOT WATER OUTLETHWO <br />NONRESIDENTIAL NOTES <br />LAVATORIES IN RESTROOMS OF PUBLIC FACILITIES SHALL BE EQUIPPED WITH OUTLET <br />DEVICES THAT LIMIT THE FLOW OF HOT WATER TO A MAXIMUM OF 0.5 GPM OR WITH <br />SELF-CLOSING FAUCETS THAT LIMIT DELIVERY TO A MAXIMUM OF 0.2 GALLONS OF HOT <br />WATER FOR RECIRCULATING SYSTEMS, AND SHALL BE EQUIPPED WITH DEVICES THAT <br />LIMIT THE OUTLET TEMPERATURE TO A MAXIMUM OF 110 °F. <br />CA GREEN BUILDING NOTES <br />5.303.2 PLUMBING FIXTURES SHALL MEET THE MAXIMUM FLOW RATE VALUES SHOWN IN <br />TABLES A5.303.2.2. <br />5.303.3 WATER CONSERVING PLUMBING FIXTURES AND FITTINGS. PLUMBING FIXTURES <br />(WATER CLOSETS AND URINALS) AND FITTINGS (FAUCETS AND SHOWERHEADS) SHALL <br />COMPLY WITH THE FOLLOWING: <br />5.303.3.1 WATER CLOSETS. THE EFFECTIVE FLUSH VOLUME OF ALL WATER CLOSETS <br />SHALL NOT EXCEED 1.28 GALLONS PER FLUSH. TANK-TYPE WATER CLOSETS SHALL <br />BE CERTIFIED TO THE PERFORMANCE CRITERIA OF THE U.S. EPA WATER SENSE <br />SPECIFICATION FOR TANK-TYPE TOILETS. <br />NOTE:THE EFFECTIVE FLUSH VOLUME OF DUAL FLUSH TOILETS IS DEFINED AS THE <br />COMPOSITE, AVERAGE FLUSH VOLUME OF TWO REDUCED FLUSHES AND ONE <br />FULL FLUSH. <br />5.303.3.2 URINALS. THE EFFECTIVE FLUSH VOLUME OF WALL-MOUNTED URINALS <br />SHALL NOT EXCEED 0.125 GALLONS PER FLUSH.THE EFFECTIVE FLUSH VOLUME OF <br />FLOOR-MOUNTED URINALS SHALL NOT EXCEED 0.5 GALLONS PER FLUSH. <br /> 5.303.3.4.1 NONRESIDENTIAL LAVATORY FAUCETS. LAVATORY FAUCETS SHALL HAVE <br />A MAXIMUM FLOW RATE OF NOT MORE THAN 0.5 GALLONS PER MINUTE AT 60 PSI. <br /> 5.303.4.2 KITCHEN FAUCETS. KITCHEN FAUCETS SHALL HAVE A MAXIMUM FLOW RATE <br />OF NOT MORE THAN 1.8 GALLONS PER MINUTE AT 60 PSI. KITCHEN FAUCETS MAY <br />TEMPORARILY INCREASE THE FLOW ABOVE THE MAXIMUM RATE, BUT NOT TO <br />EXCEED 2.2 GALLONS PER MINUTE AT60 PSI, AND MUST DEFAULT TO A MAXIMUM <br />FLOW RATE OF 1.8 GALLONS PER MINUTE AT 60 PSI. <br />5.303.6 PLUMBING FIXTURES AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH <br />THE 2022 CALIFORNIA PLUMBING CODE, AND SHALL MEET THE APPLICABLE STANDARDS <br />REFERENCED IN TABLE 1401.1 OF THE 2022 CALIFORNIA PLUMBING CODE AND IN <br />CHAPTER 6 OF THIS CODE. <br />PIPE INSULATION THICKNESS <br />FLUID <br />TEMP. <br />RANGE <br />(°F) <br />CONDUCTIVITY <br />RANGE <br />(BTU-"/HR PER <br />SQFT/°F) <br />INSULATION <br />MEAN <br />RATING <br />TEMP. (°F) <br />NOMINAL PIPE DIAMETER (") <br />INSULATION THICKNESS REQUIRED (") <br /><1 1 TO <br /><1.5 <br />1.5 TO <br /><4 <br />4 TO <8 8 AND <br />LARGER <br />251-350 <br />350< <br />201-250 <br />141-200 <br />105-140 <br />40-60 <br /><40 <br />SPACE COOLING SYSTEMS (CHILLED WATER, REFRIGERANT AND BRINE) <br />SPACE HEATING, HOT WATER SYSTEMS AND SERVICE WATER HEATING SYSTEMS <br />0.32-0.34 <br />0.29-0.31 <br />0.27-0.30 <br />0.25-0.29 <br />0.22-0.28 <br />0.21-0.27 <br />0.20-0.26 <br />250 <br />200 <br />150 <br />125 <br />100 <br />75 <br />50 <br />4.5 <br />3.0 <br />2.5 <br />1.5 <br />1.0 <br />1.0 <br />5.0 <br />4.0 <br />2.5 <br />1.5 <br />1.5 <br />1.5 <br />5.0 <br />4.5 <br />2.5 <br />2.0 <br />1.5 <br />1.5 <br />5.0 <br />4.5 <br />3.0 <br />2.0 <br />1.5 <br />1.5 <br />5.0 <br />4.5 <br />3.0 <br />2.0 <br />1.5 <br />1.5 <br />EXCEPTIONS: <br />(1) FACTORY-INSTALLED PIPING WITHIN SPACE CONDITIONING EQUIPMENT; <br />(2) PIPING THAT CONVEYS FLUIDS THAT HAVE A DESIGN OPERATING TEMPERATURE <br />RANGE BETWEEN 60 DEGREES AND 105 DEGREES FAHRENHEIT; <br />(3) WHERE THE HEAT GAIN OR HEAT LOSS TO OR FROM PIPING WITHOUT INSULATION <br />WILL NOT INCREASE BUILDING SOURCE ENERGY USE; <br />(4) PIPING THAT PENETRATES FRAMING MEMBERS SHALL NOT BE REQUIRED TO HAVE <br />PIPE INSULATION FOR THE DISTANCE OF THE FRAMING PENETRATION. METAL PIPING <br />THAT PENETRATES METAL FRAMING SHALL USE GROMMETS, PLUGS, WRAPPING OR <br />OTHER INSULATING MATERIAL TO ASSURE THAT NO CONTACT IS MADE WITH THE <br />METAL FRAMING. <br />SPACE-CONDITIONING AND SERVICE WATER-HEATING SYSTEM SHALL BE <br />INSULATED IN ACCORDANCE WITH THE FOLLOWING TABLE: <br />NONRES 0.5 <br />RES 0.75 <br />1.01.0 1.0 <br />PIPE INSULATION <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />SHEET TITLE: <br />DATE: SCALE: <br />AR <br />T <br />E <br /> <br />R <br />E <br />S <br />T <br />A <br />U <br />R <br />A <br />N <br />T <br /> <br />03/03/2025 <br />PLOT DATE: 12/2/2025 12:13:03 PM <br />CD <br />I <br /> <br />Ci <br />r <br />c <br />a <br /> <br />D <br />o <br />m <br />i <br />n <br />i <br /> <br />I <br />n <br />t <br />e <br />r <br />n <br />a <br />t <br />i <br />o <br />n <br />a <br />l <br />, <br /> <br />I <br />n <br />c <br />. <br />En <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br /> <br />- <br /> <br />C <br />o <br />n <br />s <br />u <br />l <br />t <br />i <br />n <br />g <br />98 <br />9 <br />0 <br /> <br />R <br />e <br />s <br />e <br />a <br />r <br />c <br />h <br /> <br />D <br />r <br />. <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />1 <br />0 <br />0 <br />, <br /> <br />I <br />r <br />v <br />i <br />n <br />e <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />1 <br />8 <br />Ph <br />o <br />n <br />e <br /> <br />( <br />9 <br />4 <br />9 <br />) <br /> <br />3 <br />3 <br />6 <br />- <br />6 <br />6 <br />3 <br />6 <br /> <br />| <br /> <br />d <br />k <br />a <br />n <br />g <br />@ <br />c <br />d <br />i <br />e <br />n <br />g <br />. <br />c <br />o <br />m <br />10 <br />9 <br /> <br />E <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br />. <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />DRAWN: CHECKED: <br />PL <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br /> <br />R <br />E <br />V <br />. <br /> <br />0 <br />5 <br />/ <br />1 <br />2 <br />/ <br />2 <br />0 <br />2 <br />5 <br />FI <br />E <br />L <br />D <br /> <br />C <br />H <br />A <br />N <br />G <br />E <br /> <br />0 <br />9 <br />/ <br />0 <br />5 <br />/ <br />2 <br />0 <br />2 <br />5 <br />PL <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br /> <br />R <br />E <br />V <br />. <br /> <br />0 <br />9 <br />/ <br />2 <br />9 <br />/ <br />2 <br />0 <br />2 <br />5 <br />PL <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br /> <br />R <br />E <br />V <br />. <br /> <br />1 <br />2 <br />/ <br />0 <br />2 <br />/ <br />2 <br />0 <br />2 <br />5 <br />P000 <br />E.H.D.T. <br /> <br />N.T.S. <br />PLUMBING NOTES <br />& SCHEDULES