Laserfiche WebLink
•Note: For ASCE 7-10 the wind forces have been multiplied by 0.6 <br />LOADING COMBINATION #7:ZONE 1 <br />P5 := TA x (Pup - 0.6 x DLSolar X CoS (0 x deg)) <br />L) L2 <br />M5 := Pl x- 1- wDLU:2 x -i- x cos(e x deg)a) <br />212.77 <br />299.30 <br />12 <br />4* M x 0.95Fb x Cd\Vind x Cfx x Cr x CLS <br />S <br />%:= <br />X <br />x 100 <br />< < If equal to or more than 100% Code 322.47 <br />Sr Compliant, OK! <br />LIMITS OF SCOPE OF WORK AND LIABILITY <br />Existing deficiencies which may be readily observable, and conditions which may not be code <br />compliant, or may be in need of repair, or are concealed in any way that is not observable at the <br />time of any inspections, are not included in this scope of work. There is no implication that any <br />visual inspections, by the Solar Company or the Engineer of Record, are intended to be technically <br />exhaustive, or that such inspections indicate that every aspect of every component was analyzed, or <br />that every conceivable deficiency was reported. The calculations do not include an analysis of the <br />overall structural stability, and code compliance of an existing building, nor prediction of satisfactory <br />performance or life expectancy of any existing building. <br />1