Laserfiche WebLink
APPROVED <br />PHOTOVOLTAIC PERMI I MASTER 1.D. 20/4- /1357369 9174 Ran Fernando Road <br />PLANNING DIVISION S+LAa <br />Sun Valley, CA 91331 <br />SYSTEM SIZE: 4.8KW DC / 4.2KW AC CEC LIT Zone F -2-PH: (855) 277-7155 <br />F (818)337-7113 <br />PLANNER 1-0,DATE /1RACT0R: CA LIC# 8-477185 <br />SHEET INDEX <br />1 TITLE SHEET <br />2 SITE PLAN <br />3 ROOF PLAN <br />4 ELECTRICAL DIAGRAM / NOTES <br />5 ELECTRICAL SIGNAGE <br />SPECIFICATION SHEETS: <br />6 MODULE DATA SHEET <br />7 INVERTER DATA SHEET <br />8 RACKING DATA SHEET <br />SCOPE OF WORK <br />INSTALLATION OF A 4.8 KW ROOFTOP <br />PHOTOVOLTAIC SYSTEM INCLUDING <br />(18) MODULES AND (1) INVERTER. <br />GENERAL NOTES: <br />1. All equipment shall be installed in accordance <br />with the manufacturer's approved installation <br />method <br />2. All equipment and wiring shall be listed by UL or <br />a recognized testing agency by the local AHJ <br />3. Use minimum 8 AWG equipment grounding <br />conductor (EGC) when it is subject to sun <br />exposure and/or wet location, or install the <br />EGC in an approved raceway <br />4. All exposed wiring shall be sunlight resistant __ _ <br />and suitable for wet conditions 1 <br />5. A:SZ:la:acn;:g:2rgtARCM <br />110.266. The installation is only for utility irteractive g <br />systems as shown in the single pne diagram <br />7. The short circuit current for 120/240V, single <br />phase service that is 0 - 225A, i 10,000/1 A226 - 400A is 22,000A <br />PV EQUIPMENT LABELS AND NOTES: <br />1. All PV modules and associated equipment and <br />wiring material shall be protected from any <br />physical damage <br />2. All PV system components (equipment and <br />wiring) shall be listed by UL or a recognized <br />testing agency by the local AHJ <br />3. All wiring material shall be suitable for sun <br />exposure and wet locations <br />4. All field installed junction, pull and outlet boxes <br />located behind modules or panels shall be <br />accessible directly or by displacement of a <br />module(s) or panel(s) secured by removable <br />fasteners. <br />5. The roof mounted photovoltaic modules, panels, <br />or solar voltaic roll roofing material shall have <br />the same or better listed fire-resistance rating <br />than the building roof-covering material <br />6. Photovoltaic system installation shall comply <br />with the NEC 690.61 requirement, loss of <br />interactive system <br />7. Exposed non-current carrying parts of module <br />or module frames, equipment and conductor <br />enclosure shall be grounded in accordance <br />with NEC 250.134 or 250.136(A) regardless of <br />voltage <br />8. Removal of an equipment from the system shall <br />not disconnect the (equipment grounding) <br />bonding connection between the grounding <br />electrode conductor and exposed conducting <br />services by means of a bonding jumper, NEC <br />690.48 <br />9. A bonding jumper shall be installed prior to <br />removal of a DWP-interactice inverter or the <br />other equipment that does not disconnect <br />(remove) to maintain the system grounding, <br />NEC 690.49 <br />10. Live parts in PV source circuits and PV output <br />circuits over 150V to ground shall not be <br />accessible to other than qualified persons <br />while energized <br />DESIGN REQUIREMENTS FOR ROOF MOUNTED <br />SYSTEM: <br />1. Do not cover (mechanical or plumbing) vents <br />through the roof with the collector <br />2. When installed over a roof covering of wood <br />shakes or shingles with less than a Class B or <br />C rating, an aluminum or corrosion-resistant <br />iron substrate of 26 gauge minimum thickness- <br />----extenditig at leasf 6 in. beyond the outerft*%2244*%AL 3 <br />ig@sp@®dRONSTRUCTiON <br />THIS PROJECT SHALL COMPLY WITH THE 2013 1 <br />ENEM@VE'/'20rg, ¢41pe.0*I@**PLANS <br />-, ibis&-de601*N Afit¢obE',10*3 CA' .ne8132(2:*RIane•EM'15AydMA/Utif££402 keci on the ,01 <br />Em,1- St," E,1,0:,En S:-L S,C A,. Cal**,u UNI St,1,1 <br />ROAD \ <br />*ORK L a <br />AHE.AD <br />STREET VIEW <br />Plans Designed by:Derek BroschTRANSFERRED BY DATE <br />Dalo.3/19/2014 <br />PLANNING INSPECTION REQUIRED:Revision: 0 <br />ROI IGH FINAL .NONE gr r <br />,r*-AM Wi E NA/IE (714) -8 A iii j <br />E w-rle, Av,-1 RETAIN Pt*NE fOR FUTUREREVISIONS. <br />f D11 EZAECT TOilTEMS CHECKED AND CONDITIONS <br />..... f ,tor.*.O INTER;OR TI ONLY ; <br />NO Ex·v:-:·r·if-)R ALTE#RAT:ONS/MODIFI DATIONS <br />.SI 0 EM.... <br />' EXISTING <br />60...¥.SUBUirr LANDSCAPE PLANS <br />a) E N <br />001•0-/1!0 '1% 0 <br />C E N <br />0 - N 91-LOCATION OF PROJECT E (AC) A <br />U) C(D (D < 09 <br />CE 2 0 4- <br />-1-CON <br />O 0 C--- <br />00 > < rt <br />LU r- <br />EN 2 N>LOCvd <br />co LO CO <br />1(\lcD <br />41 <br />0 <br />r <br />mli <br />rom Ad <br />5 <br />e <br />0 <br />T--G,WV / S.&01&0/· 1/ <br />shall have a legible, visible, and durable -1./1marking indicating the manufacturJ-Mfh€;Et Of t:#di'GlV'# (Ir-••w--r---. ---_. __ <br />current,frequency,.and ugPmW limes and it is u#awful to make any changes orvoltage, <br />phases9. Each installed equipment, wiring ahalterations on same without written permission from Ihe i <br />overcurrent protective device (OCF9RE¢'ilj? Sant. Ana, <br />have a short circuit rating not less thanlhe <br />available short circuit current at their input <br />terminals The acceptg cce of this plan and specifications SHALL ROT ! <br />10. The modules shall be made of either cstallipr · ire!3 to E trmit nor be an approval of the violation of any ormulti crystalline silicon matenal . + . . <br />THESE DRAWINGS ARE CONCEPTUAL AND <br />SHOW BASIC SYSTEM OPERATION ONLY. IT IS <br />NOT INTENDED TO INCLUDE ALL DEVICES AND <br />DETAILS NECESSARY FOR PROPER <br />ORIENTATION. IT IS THE RESPONSIBILITY OF <br />THE INSTALLING CONTRACTOR TO ENSURE <br />THAT ALL NECESSARY DETAILS AND DEVICES <br />ARE INSTALLED TO GUARANTEE PROPER <br />OPERATION AND COMPLIANCE WITH LOCAL <br />BUILDING CODES. <br />THIS DOCUMENT CONTAINS PROPRIETARY <br />INFORMATION AND ITS RECEIPT OR <br />11. All modules shall be roof mounted Drovistons o: <br />12. The modules ratings shall be based 6n solar <br />irradiance standard test condition (STC) of <br />1000W/mA2 <br /> Accepted B' <br />LUW. <br />.Da#41¥ <br />4..l <br />141¥/ <br />U <br />is <br />1-31 <br />0 POSSESSION DOES NOT CONVEY ANY RIGHTS <br />TO REPRODUCE, DISCLOSE ITS CONTENTS, OR <br />TO MANUFACTURE, USE, OR SELL ANYTHING IT <br />MAY DESCRIBE. REPRODUCTION DISCLOSURE, <br />OR USE WITHOUT SPECIFIC WRITTEN <br />AUTHORIZATION IS STRICTLY FORBIDDEN. <br />notn Issued - <br />CITY OF SANTAANA <br />-432= <br />- PROPERTY LINE <br />AREA OF WORK TITLE SHEET <br />c <:D l Uo<-)