My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20165335 - Permit
PBA
>
Building
>
Permits
>
B
>
Baker St
>
221 S Baker St
>
20165335 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2021 8:45:59 AM
Creation date
8/9/2021 8:45:58 AM
Metadata
Fields
Template:
Permit
Permit Number
20165335
Full Address
221 S Baker St
Permit ID
239259
Master ID Number
2018-141927
Project Name
Miscellaneous Counter1 Permit
Street Number
000221
Street Direction
S
Street Name
Baker
Street Suffix
St
Building Use Code
Resid-2 units
Job Types
Solar
Permit Type
Electrical
Applied Date
3/7/2018
Issued Date
3/7/2018
Finalized Date
5/2/2018
Flood Zone
X-0602320257J
Description of Work
Install (12) roof mounted solar panels. FEES PD ON 10195790
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PI1OCTSS IOR SMALL.SCALI I'\/ SYSTI'II: <br />MICRo_INVERTEF. <br />The information in this guideline is intended to help Iocal jurisdictions and contractors idenrify when PV system lnstallations <br />are simple, needing only a basic review, and when an insallation is more complex. Ir is likely rhar 50 % -75% ot all residenrial <br />sysrems will comply with these simple crireria. For proJecrs rha( fail ro meer rhe simple critena, resolution steps have been <br />suggesred to provide as a path ro permtr approval <br />R equired Infonnation.for Pennit : <br />L Site plan showing location of major components on the property. This drawing need not be exacrly to scale. bur ir <br />should represent relatrve location of components ar site (see supplied example site plan). PV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may not need separare fire service review. <br />2. Electrical diagram showing PV array confrguration. wiring syslem, overcurrenr protection. invertet disconnects. <br />required signs, and ac connection ro building (see supplied srandard elecrrical diagram). <br />3. Speci6carion sheets and installation manuals (if available) for all manufactured components rncluding. but not <br />limited to, PV modules, invener(s). combiner box, disconnecrs. and mounting system. <br />Step 1 : Structural Review o[ PV Array Mounting System <br />Is the aray to be mounted on a deEned, permitted mof structure? Eyes Eno <br />U No due to non-compliant rooJ or a ground mount, submit completed worksheet.for the structute WKS I . <br />Roof Infonnation: <br />l. ls the roohng type Irghrwerghr (Yes = composllon. Iighrwerght masonry. metal. erc .)Yes <br />If No, submit completed worksheet Jor rooj structure WXS, (?Vo = heavy masonry, slate, etc. .) <br />2. Does the roof have a srngle roof covenng? Elyes Euo <br />If No, submit completed worhsheet for rool Etructure WKS 1 . <br />3. Provide method and type of weatherproohng roof penetrarions (e.g flashing. caulk) <br />1 I ounting Sy st ?m InJorfi at ion : <br />L Is the mounting structure an <br />beneath the module FramesT <br />IJ No, provide details oJ structural attachment certifi.ed W a d.esign prolessional. <br />2. For manufactured mounrng systems, hll out information on the mounting system below <br />a Mounting system Manufacturer SWH product Name and 114o6.1X Solar Mount <br />b Toral Werght of PV Modules and Rails 552 bs <br />c Total Number of Attachment Point 22 <br />d. Weight per Auachment Point (b + c)25.09 bs (if greater rhan 45 lbs, see WKS I ) <br />e Maxrmum Spacing Between Attachment Points on a Rail 72 nches (see producl manual for <br />maximum spacing allowed based on maxrmum design wind speed) <br />f Toral Surface Area of Pv Modules (square feeo 211 .79 Fr'? <br />g Disrributed Weight of PV Module on Roof (b - 0 2.61 lbs/tur <br />Ij distributed weight of the PV system is geater than 5 lbstf , see WNSI . <br />Step 2: Electrical Review of PV System (Calculatrons for Electrical Diagram) <br />In order for a PV sltstem to be considered for an €xpedited permit ptocess, the following must apply: <br />1. PV modules, utility-interactive inverters, and combiner boxes are identifred for use in PV systems <br />2. The PV array is composed of 4 series strings or less per inverter. <br />1. The total inverter capacity has a conrinuous ac power outpur 13.440 Warts or less <br />4. The ac interconnection point is on the load side of service disconnecring means (690.64(8)). <br />5. One of rhe standard elec ical diagrams (E l I . E l I a, E I . I b, or E l. I c) can be used ro accurarely represenr rhe PV <br />system. Interactive PDF diagrams are available at wlflr,solarabcs.org/pcrmitting <br />!:ill out the standard electrical diagram cotnpleteL),. A guidc to thr electrical diogram is protided to i1t.,lp I|1e ,ri\liilit <br />t ilderstand each blank to fil in. $ the elec trical systan is rnore complex than lhe statldard rlectt'it'.tl diaqrat , , ti, , ti' . ',1', , <br />, i,nmunicate, provide an alteTnative diagram with dppropriate detdil <br />Z EXPTI)IIED I'IRMIT PITO(]ISS I'OR IV SYSTEMS N4I('R() INVI-IIII . <br />Flashing <br />engineered product desrgned to mount PV modules wi(h no more than an 18" gap <br />Elves Euo
The URL can be used to link to this page
Your browser does not support the video tag.