My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2233 W Hall Ave - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Hall Ave
>
2233 W Hall Ave
>
2233 W Hall Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 5:00:11 AM
Creation date
2/4/2026 5:00:05 AM
Metadata
Fields
Template:
Plan
Permit Number
101122099
Full Address
2233 W Hall Ave
Street Number
2233
Street Direction
W
Street Name
Hall
Street Suffix
Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />ncy <br />NOTE: <br />1. TTHE NEW FOOTING SHALL NOT UNDERMINE THE EXISTING FOOTING. <br />2. DO NOT CUT OR DAMAGE ANY (E) REINFORCEMENT OR POST -TENSIONED <br />PLYWOOD AT SHEAR WALL--- CABLE WHILE DRILLING FOR NEW ANCHORS. <br />WHERE OCCURS, SEE PLAN �� <br />SIMPSON SSTB24 ANCHORS <br />4x4 POST <br />SIMPSON HOLD-DOWN <br />MODEL NO. <br />SIDS <br />SCREWS <br />ANCHOR BOLTS <br />AT CONC. SLAB <br />MINIMUM WOOD <br />MEMBER THICKNESS <br />3. USE SIMPSON SET-3G EPDXY (ICC ESR-4057) FOR ALL ANCHORS. <br />4. SPECIAL INSPECTION IS REQUIRED ON ALL EPDXY ANCHORS. <br />T,A _ Pi Ywnnn AT 1:�14F_AP WAi i <br />I <br />IF09P mm&vrlyjA <br />_ F <br />HDU5 <br />14-SDS4"x2j" <br />5/8" 0 <br />3" <br />BOLT (SSTB28 AT GARAGE V �� WHEREv OCCURS, SEE PLAN <br />CURB) ICC ESR-261 1 2x STUD <br />PLYWOOD AT SHEAR WALL 5/8 "� A. B THRU PT. <br />B.N. PER SHEAR (E) 2x STUD WHERE OCCURS, SEE PLAN SILL PLATE PER <br />WALL SCHED. SIMPSON HD HOLDOWN <br />SHEAR WALL SCHED. <br />• SEE FOUNDATION PLAN �� 4x4 POST PLABTE PER SHEAR PT.SILL <br />Laster ID: <br />SCHEDR BOLTS. S.O.G. SEE PLAN <br />SHEAR <br />SEE PLANTYP O& NOTES 2x BLK'G W/ 2-16d EA. ENDS #4 DOWEL @ 16 " 0. C. B N. <br />WALL R SCHED. a t®I C K E f 1 G 111 E E R 1 A G <br />FOR ANCHOR BOLTS HOLD-DOWN DRILL & EPDXY <br />ON (E) 2x SILL PLATE <br />FIG L ° 2x OR 3x SILL STUD BOLTS 8„ ° <br />_ ° (E) CONC. SLAB S. 0. G. SEE PLAN �° z ° 00 <br />III III ° -1i PLATE A B.N. °' �p -FG Irvine <br />� -- � 111- - � _ _ ° � ° I_ III- CA 92614 <br />Ld °° ° a -- -- -III- #4 @ 18" O.C. o <br />t: 310.433.7927 <br />00 ° SUBGRADE z I___ ° " III ° J e: smobed@nicken Ineerin com <br />z 2- #5 CONT. ° PER PLAN ° ° - - C0 ° ° ° N z o m g 9 <br />@ T & B ° <br />#4 @ 18" O.C. ° ° 6 I <br />° a PER PLAN <br />2- #4 CONT. z <br />N a ° IIII III1 _ ° @ T & B <br />° 8" SUBGRADE o N <br />PER PLAN o ° <br />U 1 <br />1Y2" SEE PLAN Z <br />12 SIMPSON SSTB24 ANCHOR ' J <br />(E) FOOTING 1- #4 CONT. <br />BOLT (SSTB28 AT GARAGE (VIF) @ T & B 12" <br />CURB) ICC ESR-261 1 � _ _ <br />SECTION A - A 907. COMPACTED SOIL <br />1 10/25/25 PCC1 <br />REV DATE DESCRIPTION <br />SECT. AT HOLDOWN IN NEW FOUNDATION 7 SECTION 4 SECTION 1 PROJECT <br />NOTE: NOTE: NOTE: <br />1. DO NOT CUT OR DAMAGE ANY (E) REINFORCEMENT OR POST -TENSIONED NOTE: 1. THE NEW FOOTING SHALL NOT UNDERMINE THE EXISTING FOOTING. THE NEW PLYWOOD CAN BE INSTALLED EITHER SIDE OF THE STUD WALL. <br />CABLES WHILE DRILLING FOR NEW ANCHORS. 1. THE NEW PLYWOOD CAN BE INSTALL EITHER SIDE OF THE EXISTING WALL. 2. DO NOT CUT OR DAMAGE ANY (E) REINFORCEMENT OR POST -TENSIONED <br />2. USE SIMPSON SET-3G EPDXY (ICC ESR-4057) FOR ALL ANCHORS. 2. DO NOT CUT OR DAMAGE ANY (E) REINFORCEMENT OR POST -TENSIONED CABLE WHILE DRILLING FOR NEW ANCHORS. <br />3. SPECIAL INSPECTION IS REQUIRED FOR ALL EPDXY ANCHORS. CABLE WHILE DRILLING FOR NEW ANCHORS. 3. USE SIMPSON SET-3G EPDXY (ICC ESR-4057) FOR ALL ANCHORS. Tea Residence <br />4. CENTER OF THE NEW FOOTING SHALL BE AT THE CENTER OF THE NEW 3. USE SIMPSON SET-3G EPDXY (ICC ESR-4057) FOR ALL ANCHORS. 4. SPECIAL INSPECTION IS REQUIRED ON ALL EPDXY ANCHORS. <br />WSWH AT BOTH WAY. 4. SPECIAL INSPECTION IS REQUIRED ON ALL EPDXY ANCHORS. <br />5. SEE SHEET WSWH1 FOR MORE INFORMATION. <br />2-#4 DOWEL @ T & B 2233 W Hall Ave. <br />2x STUD PLYWOOD AT SHEAR <br />DRILL & EPDXY 8„ 6" �WALL WHERE OCCURS, Santa Ana CA 92704 <br />WSWH-AB 1 HIGH STRENGTH WSWH PER PLAN SEE PLAN <br />ANCHOR BOLT (DRILL & EPDXY) ° <br />SPECIAL INSPECTION REQ'D #4 DOWEL @ 24" O.C. SHEATHING AT SHEAR WALL » B.N. PER SHEAR <br />(DRILL &EPDXY) WHERE OCCURS, SEE PLAN ° °° ° I 5/8 0 A.B AT SHEAR WALL <br />(E) S.0.G 0 18" ° ° -__� a i THRU PT. SILL PLATE PER WALL SCHED. <br />° TYP. 6" (E) 2x STUD 5/8"0 A.B THRU PT. SILL PLATE ° � � ��� (E) FOOTING SHEAR WALL SCHED. <br />PER SHEAR WALL SCHED. S.O.G. SEE PLAN <br />DE a • ° ----J 2x4 BLK G W/ 2-16d a <br />61' _ EA. ENDS NG <br />TYP. a° B.N. (N) FOOTIA °41 <br />° ° <br />(E) 2x SILL PLATE Ir z • ° ° <br />- III a�-III- - <br />- I - (E) S. 0. G #4 DOWEL @ 16 0. C.--1- <br />a I <br />- I <br />° <br />as 11-I 1 I 1 I ° 1 I 11 1 I <br />(E) FOOTING - 1 - - <br />TO REMAIN #4 TYP. _ _ _ DRILL &EPDXY 6" 18" S.O.G. SEE PLAN <br />FG <br />#5 DOWELS @ 12 O.C. _ #4 @ 18" O.C. <br />(DRILL &EPDXY) #3 TIES @ 2„ =III- - - ° N z <br />III - <br />a ° <br />MIN. <br />i - III SUBGRADE CK <br />J 2- #4 CONT. <br />NUT AND p a -- SUBGRADE PER PER PLAN o 2„ @ T & B <br />U ° ° WASHER PLATE I i 8„ PLAN <br />�-III,�IIIII II�IIIIIL� � �' <br />90% COMPACTED - #5(E) FOOTING (VIF) �� ' �� 1- <br />#4 CONT. <br />SOIL EQ EQ & BOT TOP - - (E) FOOTING @ T & B <br />3'-6" <br />SECTION 10 SECTION 8 (N) FTG TO (E) FTG TYP. CONN. DETAIL 5 SECTION 2 <br />RpFESS/ <br />0 NOTE: �o s <br />1. DO NOT CUT OR DAMAGE ANY (E) REINFORCEMENT OR POST -TENSIONED 1. DO NOT CUT OR DAMAGE ANY (E) REINFORCEMENT OR POST -TENSIONED NOTE: �� o <br />BLES WHILE DRILLING FOR NEW ANCHORS. CABLES WHILE DRILLING FOR NEW ANCHORS. 1. DO NOT CUT OR DAMAGE ANY (E) REINFORCEMENT OR POST -TENSIONED m <br />2. US SIMPSON SET-3G EPDXY (ICC ESR-4057) FOR ALL ANCHORS. 2. USE SIMPSON SET-3G EPDXY (ICC ESR-4057) FOR ALL ANCHORS. CABLES WHILE DRILLING FOR NEW ANCHORS. EXP. 75884 <br />06.30.6.30.26 <br />3. SPEC I INSPECTION IS REQUIRED FOR ALL EPDXY ANCHORS. 3. SPECIAL INSPECTION IS REQUIRED FOR ALL EPDXY ANCHORS. 2. USE SIMPSON SET-3G EPDXY (ICC ESR-4057) FOR ALL ANCHORS. N, <br />4. CENTER F THE NEW FOOTING SHALL BE ALIGNED WITH THE CENTER OF 4. CENTER OF THE NEW FOOTING SHALL BE ALIGNED WITH THE CENTER OF 3. SPECIAL INSPECTION IS REQUIRED FOR ALL EPDXY ANCHORS. 9TF civic- <br />THE NEW ST. THE NEW POST. OF cA_\�_ <br />SIMPSON HDU5 <br />PncT pF-R P/ AN Pn.ST PFP PI AN <br />SIMPSON "AB Z" <br />POST <br />fPER PLAN <br />,n» nrn <br />n , , T, inrn <br />S.O.G. SEE PLAN g„ <br />° ° <br />� <br />to of <br />5/8"� x 14" LONG ALL <br />THREADED ANCHOR BOLT <br />PLATE ,1/2"x14"x5" W/ <br />2 5/8 x 9 LONG ALL <br />THPFAnFn Rnn <br />3/16 <br />SIMPSON HOLD-DOWN <br />MODEL NO. <br />SDS <br />SCREWS <br />ANCHOR BOLTS <br />AT CONC. SLAB <br />MINIMUM WOOD <br />MEMBER THICKNESS <br />HDU5 <br />,� „ <br />14-SDS x2 <br />5/8 <br />3" <br />POST BASE �/ o w L i nr«HuLu " "" " " #4 DOWEL @ 24" O.C. IT IS A VIOLATION OF LAW FOR ANY PERSON, <br />ANCH BOLT ° UNLESS THEY ARE ACTING UNDER THE DIRECTION <br />2-#4 @ TOP (E) S. (DRILL &EPDXY) OF A LICENSED PROFESSIONAL ENGINEER, <br />DOWELS #4 @ <br />(E) S.0.G „ TO ALTER THIS DOCUMENT. <br />8„ 16 O.C. (DRILL ° °° • FG 6 SIMPSON HD HOLDOWN <br />�.P &EPDXY) - - - - - 711 SEE FOUNDATION PLAN <br />---------- - - - -III ° -III--III- -III I ;III-- ° ° - _ - SHEET TITLE <br />_ _ _ _ a -- <br />° - - ___ ° TYP ANCHOR BOLTS <br />WOOD POST <br />_ ° #4 DOWELS _III -III ° ° °8 ° #3 TIES z I ° ° a SEE PLAN & NOTES �� SEE PLAN <br />`° u 6„ n 6„ @ 16" O.C. ° @ 6" O.C. I- a 6'� ° - - FOR ANCHOR BOLTS <br />- TYP. ° - - III CID TYP. ° a I- <br />-1-- ° ° -1 1- 2x4 BLK'G W/ HOLD-DOWN SECTIONS AND DETAILS <br />(E) FOOTING a ° #4 TYP.2-16d EA. ENDS STUD SCREWS <br />TO REMAIN �____ ° ° <br />(E) FOOTING �____ #4 TYP. `�'I� - ° _ - ° ( ) <br />,� � � a -III-III III_ a 4 ° ° ° E 2x SILL PLATE <br />\\1 <br />TO REMAI 001, 1 ° <br />III -III- 4-#4 @ BOT #5 DOWELS @ 12" O.C. °• ° ° • <br />#4 DOWELS @ 12" O.C. ° ° ° ° <br />BOTH WAY (DRILL & EPDXY) ° ° <br />8 ° 90i COMPACTED EQ EQ ° <br />(DRILL &EPDXY �t SOIL <br />° � � a� a a SHEET NUMBER <br />SEE PLAN 04e4° ad LJ p LJ d �L <br />a a <br />-• I -I I I I I I -�- � � N <br />90% COMPACTED #4 @ 12" O.C. 90% COMPACTED 4-#5 @ TOP �� <br />SOIL PER PLAN @ BOT. SOIL EQ EQ & BOT. ALL THREADED RODS (A572GR50) <br />1 S=4 <br />3'-9" SQ <br />SECTION Li I SECTION 9 SECTION 6 SECT. AT HOLDOWN IN EXISTING FOUNDATION 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.