Laserfiche WebLink
RE <br />V <br />I <br />S <br />I <br />O <br />N <br />NO <br />. <br />DA <br />T <br />E <br />DATE: <br />DRAWN BY: <br />PR <br />O <br />J <br />E <br />C <br />T <br />: <br />PR <br />E <br />P <br />A <br />R <br />E <br />D <br /> <br />B <br />Y <br />: <br />TI <br />T <br />L <br />E <br />: <br />KP <br />S <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br />S <br />P. <br />O <br />. <br /> <br />B <br />O <br />X <br /> <br />7 <br />0 <br />7 <br />9 <br />7 <br /> <br />- <br /> <br />R <br />I <br />V <br />E <br />R <br />S <br />I <br />D <br />E <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />5 <br />1 <br />3 <br />(7 <br />1 <br />4 <br />) <br /> <br />5 <br />0 <br />1 <br />- <br />9 <br />1 <br />2 <br />8 <br /> <br />- <br /> <br />I <br />N <br />F <br />O <br />@ <br />K <br />P <br />S <br />P <br />E <br />R <br />M <br />I <br />T <br />S <br />. <br />C <br />O <br />M <br />11/11/2025 <br />KK <br />29 <br />0 <br />7 <br /> <br />O <br />A <br />K <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />AD <br />V <br /> <br />F <br />I <br />B <br />E <br />R <br />G <br />L <br />A <br />S <br />S <br />PAGE NO. <br />OC <br />F <br />A <br /> <br />C <br />O <br />R <br />R <br />E <br />C <br />T <br />I <br />O <br />N <br />S <br />1 <br />7/ <br />2 <br />8 <br />/ <br />2 <br />0 <br />2 <br />5 <br />BL <br />D <br />G <br /> <br />C <br />O <br />R <br />R <br />E <br />C <br />T <br />I <br />O <br />N <br />S <br />2 <br />11 <br />/ <br />1 <br />1 <br />/ <br />2 <br />0 <br />2 <br />5 <br />M4 <br />GA <br />S <br /> <br />L <br />I <br />N <br />E <br /> <br />D <br />E <br />T <br />A <br />I <br />L <br />3/4" <br />75' <br />3/4" <br />53'5 PSI MEDIUM PRESSURE <br />GAS METER (EX.) <br />(NEW) <br />OVEN BURNER GAS TRAIN <br />500,000 BTUH = 500 CFH <br />SCOPE OF WORK: <br />INSTALL (1) INDUSTRIAL <br />BATCH OVEN <br />120' <br />10 <br />0 <br />' <br />SHEET NOTES: <br />1.ALL PIPING BLACK SCHEDULE 40. <br />2.NEW 3/4" MEDIUM PRESSURE GAS LINE TO BE INSTALLED TO NEW <br />500,000 BTU OVEN BURNER GAS TRAIN. <br />3.ALL PIPING TO BE SUSPENDED INSIDE BUILDING FROM CEILING WITH <br />3/8" ROD/RING HANGER ASSEMBLIES. <br />TOTAL LENGTH PIPE:3/4" = 155' <br />TOTAL CONSUMPTION:500 CFH <br />PER 2022 CPC TABLE 1215.2(6) <br />TOTAL ALLOWABLE:3/4" AT 200' = 1360 CFH <br />3/4" <br />75' <br />3/4" <br />8' <br />3/4" <br />53' <br />3/4" <br />17 <br />TO NEW OVEN BURNER GAS <br />TRAIN (500,000 BTU) <br />500 CFH CONSUMPTION RATE <br />3/4" <br />1' <br />3/4" GAS <br />RATED BALL <br />VALVE (NEW) <br />5 PSI INPUT TO 7-14 WC OUTPUT <br />STEP DOWN REGULATOR TO BE <br />VENTED TO OUTSIDE ATMOSPHERE <br />(NEW) <br />3/4" GAS <br />RATED BALL <br />VALVE (NEW) <br />5 PSI MEDIUM PRESSURE <br />GAS METER (EXISTING)