My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2907 S Oak St - Oven - Plan
PBA
>
Building
>
ProjectDox
>
O
>
Oak St
>
2907 S Oak St
>
2907 S Oak St - Oven - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 5:00:12 AM
Creation date
2/4/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
40140733
101124660
Full Address
2907 S Oak St
Street Number
2907
Street Direction
S
Street Name
Oak
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCALE: <br />A2 <br />FLOOR PLAN <br />DATE: 7328.2025 <br />STAMP.: <br />LOT AREA: 0.569 ACRES <br />PARCEL NO.: 411-031-02 <br />2907 OAK ST <br />SANTA ANA, CA 92707 <br />00'10' <br />0 0 <br />20' <br />REMARKS: <br />PLOT SIZE: 24" x 36" <br />SHEET NO .: <br />N <br />E <br />W <br />S <br />SCOPE: <br /> INSTALL (1) NEW BATCH OVEN, MODEL <br />#OEMBCOMPLN-08.5-08-14-TB-LT-8AC. <br />LEGAL DESCRIPTION: <br />PM 49-50 PAR 3 POR OF PAR (P.M. 36-5 PAR 3 POR <br />OF PAR) <br />A <br />DETAIL A <br />UP TO <br />MEZZANINE <br />FLOOR <br />120' <br />ENTRY <br />10 <br />0 <br />' <br />EXISTING <br />SPRAY BOOTH <br />14'-8" <br />10 <br />' <br />3'-6" <br />3' <br />20 <br />' <br />14'-8" <br />10 <br />' <br />3'-6" <br />3' <br />NOTES: <br />1.PROPOSED EQUIPMENT TO BE INSTALLED <br />ON EXISTING CONCRETE FLOOR. <br />2.AS PER CBC 11B-202.4: EXCEPTION 7. <br />PROJECTS CONSISTING ONLY OF <br />HEATING, VENTILATION, AIR <br />CONDITIONING, REROOFING, ELECTRICAL <br />WORK NOT INVOLVING PLACEMENT OF <br />SWITCHES AND RECEPTACLES, <br />COSMETIC WORK THAT DOES NOT <br />AFFECT ITEMS REGULATED BY THIS <br />CODE, SUCH AS PAINTING, EQUIPMENT <br />NOT CONSIDERED TO BE A PART OF THE <br />ARCHITECTURE OF THE BUILDING OR <br />AREA...SHALL NOT BE REQUIRED TO <br />COMPLY WITH SECTION 11B-202.4. <br />3.THE CONSTRUCTION SHALL NOT <br />RESTRICT A FIVE-FOOT CLEAR AND <br />UNOBSTRUCTED ACCESS TO ANY WATER <br />OR POWER DISTRIBUTION FACILITIES <br />(POWER POLES, PULL-BOXES, <br />TRANSFORMERS, VAULTS, PUMPS, <br />VALVES, METERS, APPURTENANCES, ETC.) <br />OR TO THE LOCATION OF THE HOOK-UP. <br />THE CONSTRUCTION SHALL NOT BE <br />WITHIN TEN FEET OF ANY POWER LINES - <br />WHETHER OR NOT THE LINES ARE <br />LOCATED ON THE PROPERTY. FAILURE TO <br />COMPLY MAY CAUSE CONSTRUCTION <br />DELAYS AND/OR ADDITIONAL EXPENSES. <br />SCOPE OF WORK: <br />INSTALL (1) INDUSTRIAL <br />BATCH OVEN <br />MAIN GAS METER LOCATION <br />AND SHUT OFF ON EXTERIOR <br />2 <br />SHUT OFF WITHIN <br />10' OF OVEN <br />2 <br />4A-40BC <br />4 <br />S-15
The URL can be used to link to this page
Your browser does not support the video tag.